Title: Innovators Faade System Pvt' Ltd'


1
(No Transcript)
2
Innovators Façade System Pvt. Ltd.
3
  • METHODOLOGY
  •  
  • This statement proposed the procedure to be
    followed by INNOVATORS FAÇADE SYSTEMS PVT LTD to
    execution the work at site
  •  
  • 1) MANAGEMENT CONTROL
  •  
  • A team of experienced Senior Engineer / Staff
    will handle the project. 
  •  
  • As per schedule requirement, the project will
    be dealt in such a manner which will suit the
    manageable quantities of material for production
    delivery, storage and erection
  •  
  • During survey if any situation is found, which in
    our opinion, will prevent proper execution of
    curtain wall work or endanger it permanently, the
    same will be reported to the client and
    installation work will be stalled in that area
    until such conditions are corrected
    satisfactorily.
  •  
  • 2. CONTRACTUAL MATTER
  •  
  • Items such as Site office, Electricity, Water,
    Storage, Scaffolding, Insurance etc.
  • may be discussed and agreed prior to the order
    being placed and accepted.
  •  
  • The building will be surveyed by us to know
    difference between construction drawing
  • site measurement to decide the scope of
    work same will be discussed before

4
  • 4. ACTIVITIES OF DESIGN DEPT
  • Receive and review of tender document,
  • Systems design,
  • Structural calculation,
  • Design proposal,
  • Get it approved by Architect
  • Preparation of Shop drawing
  • Get it approved by Architect
  • To raise bulk M T O
  • Preparation of technical drawing
  • Balance M T O etc,
  • 5 PRODUCTION DELIVERY
  •  
  • All the materials will be fabricated in our own
    works, under the supervision of skilled,
    experienced and technically competent Managers,
    phased to suit the agreed program, and delivered
    at site. Material are packed such that damage in
    transit and on site is avoided. All material will
    be marked so that their contents and location can
    be identified at site.
  •  
  • Glazed panels will be identified as to the
    content and location on site.
  •  
  • Certain specialist items will be purchased from
    the supplier, and usually delivered at site.
  •  

5
  • 6. EXECUTION SYSTEM
  • Once a project is entrusted to us, we study,
    evaluate and form a task force to depute to that
    site. The Engineer In Charge walks in with a
    team of competent and experienced engineers to
    ensure smooth progress of the project. Bar chart
    is chalked out and is followed rigorously.
    Progress of each work is monitored daily at
    Directors level. Following systems are adopted
    for efficient monitoring of progress and
    effective execution
  • Bar chart,
  • Daily progress report,
  • Highlight major issues,
  • Fortnight material requirement
  • Whenever necessary, make an arrangement for on
    site computer access,
  •  
  • 7. SITE OPERATION
  •  
  • We will require a secure, safe, storage area of
    size 25ft x 40ft I,e 1000 sqft situated
    preferably adjacent to and not more than 20 Mt.
    from the point where, we will be required to fix
    our materials.
  •  
  • We will arrange for safe storage in the
    designated area. Fabricated materials will be
    off-loaded and stored, so as to avoid damage. The
    storage area must be able to withstand the loads
    of the packed materials.

6
  • 8 SEQUENCE OF WORK
  •  
  • Work generally will be dealt in sections or
    elevations as per the agreed program.
  •  
  • We will require datum levels and grid lines to be
    established prominently marked on the floor and
    structure at each side of the structural glazing.
  •  
  • 9 QUALITY CONTROL
  •  
  • We employ drawing office, production and
    inspection department and all their functions are
    integrated, to ensure that our finished work, is
    fully compatible, with the agreed design
    standard.
  •  
  • Full liaison, is maintained with our fixing
    management and site operators, to ensure that the
    required design and performance standards, are
    maintained at site.
  •  
  • Necessary quality assurance manual will be
    prepared for the project.

7
  • 10. PROTECTION OF WORK
  •  
  • All Aluminium components will be protected by low
    Tac masking tape or soluble lacquer during the
    execution of the work.
  •  
  • We strongly recommend a site procedure on good
    house keeping to avoid damage to our work,
    particularly where parts may be incomplete by
    agreement to facilitate site access points,
    scaffold tie backs etc. and to ensure, that any
    material falling onto our work, particularly wet
    cement or plaster, is immediately removed to
    avoid damage to finished surfaces whether or not
    these materials are covered by our protection.
    Wet debris must be removed before hardening and
    scrapers or adhesive cleaners not used.
  •  
  • The protection provided to sections is not proof
    against mechanical damage particularly damage
    caused by other agencies working at site and when
    this entails attaching materials to our work.
  •  
  • We cannot accept liability for loss or damage to
    work arising out of hostilities, rebellion, loss
    or damage directly due to the use or occupation
    by the client, due to design deficiency of other
    works other than one provided by us and Loss /
    Damage due to other agencies working at site.

8
  • 11. SAFETY POLICY
  • We are fully committed to provide a safe working
    environment to our staff and at work sites.
    Implementation of safety measures are kept under
    close watch at every stage.
  • In addition, an environment is created which is
    conducive to exchange ideas and suggestions
    regarding productivity, quality and safety
    related issues. In short our endeavor is to
    obtain a zero accident rate.
  • 12. CLEANING AND HAND OVER
  •  
  • Each section of the work will be handed over to
    the client as when it is completed, inspected
    and accepted.
  •  
  • In the event that cleaning is required at some
    later stage in the contract, where the same is
    not identified and included in our price, then
    scaffolding or safe and suitable access must be
    provided for us free of charge, unless it is
    clear from our quotation, that the provision of
    such access is our responsibility.
  •  
  •  
  • 13 REPLACEMENT OF MATERIAL
  •  
  • Our tender does not include any allowance for
    any clients spares after contract completion.

9
  • 14 PERFORMANCE GUARANTEE
  •  
  • The Performance Guarantee of materials such as
    silicon will be as issued as per their norms by
    respective manufacturer to fulfill desired
    quality standard. The Guarantees will be in the
    form of back to back from the manufacturers of
    various components.
  •  
  • 15. GUARANTEE
  •  
  • A Primary guarantee The curtain walling system
    and its installation against faults and omission
    design, materials, workmanship and functional
    performance including water tightness and air
    tightness of the various elements and components
    for the period of ten years from completion.
  •  
  • A Supplementary guarantee All joint seals and
    bondings shall be warranted by sealant
    manufacturer.
  • 16. CONCLUSION
  • In short we want to deliver the project on time
    and without over running the cost. We never
    compromise with quality of material and finishes.
    Customers , Clients Consultants , Architects
    commands highest respect in our organization.
    Execution is carried out to the utmost
    satisfaction of the client.

10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
  • Project C.S. International Airport
  • Client Unity Infraprojects Ltd.,
    ArchitectHafeez Contractor D.V. Joshi Co
  • Location Santacruz East ( Mumbai)
  • Works Structural Glazing 4000 sqm
  • Aluminium cladding panel 15000 sqm

14
Project Orchid / VITS Client Unity Infra
projects ltd.Architect Upasni Design Cell
Architect Upasni Design Cell Location Pune
Work Structural Glazing 3000 sqm
Point Fitting Glazing (Tension rod,fins)
4000 sqm Curtain Wall Glazing
1500 sqm
o
15
Project Knowledge Boulevard Client Emirates
Tech. Pvt. Ltd.Architect Design Plus
Consultant Indrajit Maitra Associates
Location Noida Work Structural Glazing
8000 sqm Aluminium Cladding Panel
3500 sqm
16
Project Palladium Mall Client
Phoenix Mills Ltd.,Consultant Axis Façade
Architect P.G.Patki Architects Location
Lower Parel ( Mumbai) Work Suspended Glazing
3000 sqm Structural Glazing 750 sqm
Granite Cladding 4020 sqm Al. Cladding
Panel 11000 sqm
17
Project Discovery Towers Client Fortune
Builders Pvt. Ltd.Architect S. Arora
Associates Consultant Axis Façade Location
Greater Noida Work Structural Glazing 5000
sqm Al. Cladding Panel 4500 sqm
.,
18
Project R Tech Park Client Romell Real
Estate Pvt. Ltd. Consultant Alcon
Location Goregaon ( Mumbai ) Work
Structural Glazing 6000 sqm Suspended
Glazing 500 sqm Al. Cladding Panel
10,000 sqm

19
Project GVK ONE Client GVK Properties
Mgmt. Co. Architect D.P. Architects Pvt. Ltd.
Consultant Fusion Location Hyderabad
(A.P.) Work Frameless Spider Glazing 1000
sqm M.S. Work 33 MT
20
Project Baroda Central Client Ishkrupa Mall
Mgmt. Co. Pvt. LtdArchitects- P.G.Patki
Architect Pvt. Ltd. Consultant Gherzi Eastern
Ltd / Y.S. Sane Associates. Location Baroda
Work Structural Glazing 1000 sqm Aluminium
Cladding panel 2,000 sqm
21
Project Chaudhary Charan Singh Airport Client
Brahmaputra Infrastructure Ltd. Architect S.
Ghosh Associates Location Lucknow ( U.P.)
Works Structural glazing, Suspended
glazing,ACP glazing.
22
Project Madurai Airport Client Vishal
Infrastructure Ltd., Architect Behal
Joshi Associates Location Madurai (
T.N.) Works Structural glazing, Suspended
glazing,ACP glazing.
23
Project Grand R D Centre Client Panacea
Biotech ltd., Consultant Alcon Architect
K.Thomas Associates Location Navi Mumbai
Works Structural glazing,ACP glazing.
24
Project Dr. Ambedkar International Airport
Client Vishal Infrastructure Ltd.,
Architect Consulting Engg. Services Pvt.
Ltd. Location Nagpur(Maharashtra) Works
Curtain wall glazing, ACP glazing.
25
Project MSEZ Client Gujarat Adani Port
Ltd. (MSEZ LTD) Architect P.K. Das Asso.
Consultant M/s Mahimtura Consultants Location
Mundra ( Gujarat) Works Structural
glazing, Spider glazing, ACP glazing.
26
Project West End Client Chitranjali
Properties Pvt. Ltd. Location Pune
Architect Natarajan Venkat Associates
Works
Structural Glazing 1500 sqm M.S. Work
25MT Aluminium cladding panel 1500
sqm
27
Project Aurangabad ATC Control Tower
Client B.G. Shirke Location Aurangabad
Architect Chaya Design
Consultants
Works Curtain Wall Glazing, Doors,Windows,
28
Project Aurangabad Airport Client
B.G. Shirke Const. Tech. Location Aurangabad
(Maharashtra) Architect Chaya Design
Consultants Works Curtain wall glazing,
Door,Windows,
29
Project Balewadi Stadium Client B.G.
Shirke Const. Tech. Architect Shashi Prabhu
Associates Location Pune (Maharashtra)
Works Curtain wall glazing, ACP glazing.
30
Project C AG Client Unity
Infra Projects Ltd., Architect C.P. Kukereja
Associates Location New Delhi Works
Structural wall glazing,
31
Project Godrej Coliseum Client Godrej
Properties Ltd., Architect B.B.
Architects Location Sion (Mumbai) Works
Structural wall glazing, ACP glazing.
32
Project Infinity Tower,Bldg. No. 4 Client
Infinity Developers Architect Vijay Punjabi
Consultants Pvt. Ltd., Location Malad ( Mumbai
) Works Structural wall glazing, ACP
glazing.
33
Project Leela Business Park Client
K. Raheja Group Architect P.G. Patki
Associates Location Khar ( Mumbai ) Works
Structural wall glazing, ACP glazing.
34
Project Logix Cyber Park Client
Logix Cyber Park Consultant Gherzi Eastern
Ltd. Architect D.F.A. Location
Noida Works Structural wall glazing, ACP
glazing.
35
Project Logix Cyber Park Client
Logix Cyber Park Consultant Gherzi Eastern
Ltd. Architect D.F.A. Location
Noida Works Structural wall glazing, ACP
glazing.
36
Project Neelyog Square Mall Client
Neelyog Builders Pvt. Ltd., Architect Ajit
Bhuta Associates Consultant
Alcon Location Ghatkopar Works
Structural wall glazing, ACP glazing.
37
Project Paras Tower Client Paras
Build Call Pvt. Ltd., Architect Spazzio Design
Arch. Pvt. Ltd., Location Gurgaon (Haryana
) Works Structural wall glazing, ACP
glazing.
38
Project Trichy Airport Client
C.C.C.L. Architect Behal Joshi and
Associates Location Trichy Works Curtain
wall, ACP glazing.
39
Project Oberoi Wood Client Kingston
Properties Pvt. Ltd. Architect In House Location
Goregaon Works Structural Glazing
Aluminum Windows
40

Project Maharana Pratap Airport Client
Simplex Infrastructure Limited Location
Udaipur Architect Suresh Goel Associates
Works Structural Glazing
41
Project Symbosis Glazing client Shrikhande
Consultants Pvt. Ltd. Location Pune Architect
Kadri Consultants Pvt. Ltd. Works
Structural Glazing
42
Project Dabar Pharma Ltd. Client New
Consolidated Const. Com. Location
Baddi ( H.P.) Architect Pharma Plan Works
ACP,Structural Glazing
43
Project Notan Plaza Client SSD Housing
private Ltd. Location Bandra Architect
Seema Puri Associates Works Structural
Glazing A.C.P.
44
Project Myles Imperial Client Darius Myles
Hotels Pvt. Ltd. Location Goa Architect
Tulio DSouza Works Structural Glazing
A.C.P.
45
Project HSBC Pune Client K.Raheja
Group Location Pune Architect Nitin
Parulekar Architects Pvt. Ltd. Works Structural
Glazing ACP Cladding
46
Project M.S.C. (H.O) Client Axis Reality
Pvt. Ltd. Location Andheri(E) (Mumbai)
Architect Search Architect WorksStructural
Glazing Suspended Glazing A.C.P Dry Cladding
47
Project Wescon Client Arjun relators
Pvt. Ltd. Location Andheri (w) (Mumbai)
Architect Hafeez Contractor Works Structural
GlazingA.C.P. Cladding Display Glazing
48
Project L T Admin Building Client
Larsen Toubro Pvt. Ltd. Location Ahmednagar
(Maharashtra) Architect R.Chakrapani
Sons WorksStructural Glazing A.C.P
49
Project G. Corp Tech Park Client G-Corp
properties Pvt. Ltd. Location Ghodbandar Road (
Thane) Architect Design Plus Works
Structural Glazing A.C.P.
50
Project Technology Centre II Client
Larsen Toubro Ltd. Location Powai (Mumbai)
Architect Raja Aederi Cons. Works Structural
Glazing Frameless Glazing
51
Project Express Trade Tower-2 Client York
Calltech Pvt. Ltd. Location Noida ( U.P.)
Architect S. Arora Associates Consultant
Axis façade Consulting Pvt. Ltd. Works
Structural Glazing A.C.P.
52

Quality Assurance Procedure  
53
(No Transcript)