cs3710/PMmaterials/Tutorial2.html: CompleteDesign - guidance for your design ... Concepts for this Tutorial. Structured English - see CompleteDesign ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 13
Provided by: Temp74
Category:

less

Transcript and Presenter's Notes

Title: COMP3710%20Tutorial%202%20System%20Maintenance%20Downloads%20Work%20Pace%20Concepts%20for%20this%20Tutorial%20MS%20Project


1
COMP3710 Tutorial 2System MaintenanceDownloads
Work PaceConcepts for this TutorialMS Project
2
System Maintenance
  • Do not 'crash' windows
  • Exit from MS Project
  • Logout of the win server
  • We are overloading the system processes on the
    server

3
Downloads
  • www.cse.unsw.edu.au/
  • cs3710/PMmaterials/Tutorial2.html
  • CompleteDesign - guidance for your design
  • ProjectStatusReport - Submission for this week
    with MS Project Report
  • Quality Assurance - Document provided by SIP for
    you to measure the quality of your product.
  • Enter the measures you will use.
  • Planning Module Design Outline - guide for your
    design. Also see Process Design, Data Storage and
    Interface Design documents

4
Work Pace
  • Go at your own rate.
  • If you have problems, ask your peers
  • Then is you cannot work it out, ask your tutor
  • It is important you try it first or the tutor's
    answer will mean nothing to you.

5
Concepts for this Tutorial
  • Structured English - see CompleteDesign
  • Tracking - enter your actual times to keep track
    of how you are going
  • Scheduling - make sure you are not doing two
    things at once
  • make sure you can do the work in time
  • Re-planning- if not, re-plan your times and order
    of tasks
  • Pair Design - If you are working in pairs
    consider the following points.

6
Pair Work - as done in lectures
  • Use we when you discuss the project
  • Share work as the driver and observer - switch on
    10 minutes or on each task completion
  • Stay focused on the task - respect your team mate
  • Do not be negative, give it a go
  • Detect defects as you go role of observer
  • Do not fight over design - debate differences
  • Share the work space and the contributions
  • Review any individual work between tutorials it
    has to be understood and agreed to by both
    designers for consistency
  • Have regular planned breaks - time them

7
If working in a pair
  • You must change the resources for each design
    task to two people.
  • Put the actual times spent on design work into
    each of your individual MS Project Plans. You
    will do your own analysis on this.
  • Individually manage the project. This will be
    your own data and analysis. You will do your own
    changes and estimates, and Status Reports.

8
MS Project Enter actuals in columns. Insert
columns first
9
Or enter values in Tracking Mode. Select Track
then follow set up steps. Enter values in yellow
task rows
10
Select Report view and then what you print will
be what is showing on the screen (without the
left hand menu) Also can set up to compare to
baseline on left hand menu
11
Print your report on PSFile
12
Select your Pairs and give your names to the tutor