1COMP3710 Tutorial 2System MaintenanceDownloads
Work PaceConcepts for this TutorialMS Project
2System Maintenance
- Do not 'crash' windows
- Exit from MS Project
- Logout of the win server
- We are overloading the system processes on the
server
3Downloads
- www.cse.unsw.edu.au/
- cs3710/PMmaterials/Tutorial2.html
- CompleteDesign - guidance for your design
- ProjectStatusReport - Submission for this week
with MS Project Report - Quality Assurance - Document provided by SIP for
you to measure the quality of your product. - Enter the measures you will use.
- Planning Module Design Outline - guide for your
design. Also see Process Design, Data Storage and
Interface Design documents
4Work Pace
- Go at your own rate.
- If you have problems, ask your peers
- Then is you cannot work it out, ask your tutor
- It is important you try it first or the tutor's
answer will mean nothing to you.
5Concepts for this Tutorial
- Structured English - see CompleteDesign
- Tracking - enter your actual times to keep track
of how you are going - Scheduling - make sure you are not doing two
things at once - make sure you can do the work in time
- Re-planning- if not, re-plan your times and order
of tasks - Pair Design - If you are working in pairs
consider the following points.
6Pair Work - as done in lectures
- Use we when you discuss the project
- Share work as the driver and observer - switch on
10 minutes or on each task completion - Stay focused on the task - respect your team mate
- Do not be negative, give it a go
- Detect defects as you go role of observer
- Do not fight over design - debate differences
- Share the work space and the contributions
- Review any individual work between tutorials it
has to be understood and agreed to by both
designers for consistency - Have regular planned breaks - time them
7If working in a pair
- You must change the resources for each design
task to two people. - Put the actual times spent on design work into
each of your individual MS Project Plans. You
will do your own analysis on this. - Individually manage the project. This will be
your own data and analysis. You will do your own
changes and estimates, and Status Reports.
8MS Project Enter actuals in columns. Insert
columns first
9Or enter values in Tracking Mode. Select Track
then follow set up steps. Enter values in yellow
task rows
10Select Report view and then what you print will
be what is showing on the screen (without the
left hand menu) Also can set up to compare to
baseline on left hand menu
11Print your report on PSFile
12Select your Pairs and give your names to the tutor