Transcript and Presenter's Notes

Title: NHS Standard Contracts Implementation Workshops 20082009


1
NHS Standard ContractsImplementation Workshops
2008/2009
2
NHS Standard ContractsWelcome to your
Implementation Workshop
3
The SHA perspective on Commissioning Requirements

4
System Management (Market Management/ Development)
  • Improve commissioning leading to enhanced
    provider
  • performance and better patient outcomes by
    applying the system
  • levers of choice, better procurement and
    contracting, competition
  • and corporate transactions (mergers, acquisitions
    or joint
  • ventures).

5
Roles and Responsibilities for System Management
6
The Department of Healths role
With SHAs Co-design of system rules
  • DH sets the rules of the system,
  • via its responsibilities for
  • Setting standards
  • Allocating resources and setting prices
  • The political interface
  • Whole system oversight
  • Cross-government and external co-ordination

7
The SHAs role
With DH Co-design of system rules
  • SHAs oversee and assure the system
  • via their responsibilities for
  • Leadership of the health economy
  • Strategy and market structure
  • Sanctioning variability
  • Ensuring proper arrangements for PCT direct
    provision
  • Performance management/accountability of PCTs
  • Whole system performance
  • Strategic communication
  • Developing PCT capability

With PCTs Managing failure and market disputes
8
The PCTs role
With SHAs Managing failure and market disputes
  • PCTs build the system,
  • via their responsibilities for
  • Designing local incentives and drivers
  • Driving quality in provision
  • Contracting procurement
  • Market development
  • Delivering the choice offer
  • Patient, public and market information
  • Alignment with local partnerships
  • Local sensitivity

With input from Patients Taxpayers
9
The Providers role
  • Providers
  • deliver front-line care
  • compete in the market
  • innovate
  • develop relationships with system managers and
  • other providers

10
South Central Approach
  • Improving outcomes for patients is our primary
    objective.
  • There are many mechanisms for achieving this
    including market management.
  • In South Central we want to see a market that is
    responsive to patient needs with diversity of
    provision across all sectors.
  • We expect patients to be enabled to exercise
    choice.
  • We expect there to be a vigorous programme of
    contract specification and management based
    around care pathways, with competition a major
    factor.
  • We expect PCTs to focus on becoming world class
    commissioners with relationships with providers
    conducted through contracts.
  • Our expectation is that PCTs will functionally
    collaborate to achieve these objectives.

11
South Central Programme
  • A joint programme between SHA and PCTs focused on
  • Training and development (PCT leads group)
  • Strategic development (Health Market Analysis)
  • Guidance (dispute resolution, market guide,
    provider separation)
  • Collaborative work (contract specification and
    development)
  • Products (procurement portal)
  • Assurance

12
Our work on market developmentStrategic
Sourcing the method guides the selection of the
most appropriate change levers for each specific
case we are using this for Health Market
Analysis
12
13
Contract Provider Improvement Project
Root Cause Analysis
South Central Hard Close Framework
Senior Comm. Deal Managers
Team Baseline Core training
Provider Operating Model
Contract Schedules Service Specs.
  • single analysis providing a baseline for
    targeting and, where appropriate, prioritisation
    of contract negotiations
  • Lay the foundation for strengthening 09 / 10
    contract negotiations
  • core training in provider management good
    practice fundamentals negotiating
    action-based-learning sessions for good practice
    negotiation strategy development, negotiation
    tactics and positioning.
  • Qual. review of approaches and skills to identify
    progress as result of interventions of the
    project (to include further recommendations for
    the future).
  • Support for PCTs on acute 08/09 negotiating
    strategy development, advice and coaching during
    negotiations and up skilling for PCT contracting
    teams actions in addressing over performing
    contracts utilising local and South Central
    contract rules plus the single root cause
    analysis (supporting negotiation strategies).
  • 08/09 benefits will likely be incremental
  • Primary benefits 09/10 negotiations where
    identified contractual and service issues will be
    more addressable.
  • A tangible and real model design on how best to
    organise ourselves to deliver an area of common
    priority such as the recent Stroke Rehab HMA fast
    track and manage our acute providers

14
Our work on contract development
  • Community Contact
  • Development of KPIs, Quality Outcome measures
    for 4 key services
  • Health Visitors,
  • District Nurses,
  • Stroke Rehabilitation,
  • Walk-in-Centres
  • Draft service Specifications for the 4 services
  • MH Contract inclusion of key measures from
    Clinical Network

15
  • Acute Contract- there are lessons to be learnt
    from the Acute Contract in terms of performance
    management and strengthening of schedules
    especially
  • Discharge protocols
  • Delivery of 18 week Referral to Treatment to
    include non consultant care
  • Patient Booking and referrals to include the
    non availability of slots
  • Quality standards to include CQIUN
  • Clinical Quality Performance Indicators and
    Consequences
  • Performance Indicators and Consequence
  • Information reporting for national and local
    requirements
  • Serious Untoward Incidents and Safety Alert
    Broadcasting System reporting
  • Reporting,
  • Information Management
  • Contract Challenges around Outpatient and
    Inpatient activity
  • And where appropriate these need to be applied to
    Community and Mental Health Contracts

16
  • Please note that all information regarding
    Community and MH contract development is
    published on a SharePoint site that can be access
    via an N3 connection
  • If you would like to be added to the site to
    access the information
  • Please contact
  • Hilary.clark_at_southcentral.nhs.uk

17
The NHS Contract for 2009
  • The Policy in Context
  • Jim Lusby
  • DH Contract Development Lead

18
The NHS is changing because the world is changing
The cost of new drugs is increasing
Quarter more over 85s by 2015
  • Lucentis and Macugen
  • NICE will rule this year on two treatments to
    prevent blindness in people with AMD
  • These new drugs could cost the NHS between 60m
    and 180m a year.

Rising consumer expectations
Diseases of modern lifestyles
19
There has been unprecedented investment
By 2008 NHS investment will have trebled, but
20
Weve established a comprehensive reform
programme
Better care Better patient experience Better
value for money
Choice Commissioning (demand-side reforms)
21
History of Commissioning
  • NHS has commissioned for over a decade, but
  • Command control delivery model has
    consistently reinforced the provider line
  • Commissioners have lacked robust levers
  • Not all available levers have been used
  • Inadequate regulatory regime bail out
  • Low investment in developing commissioners
  • Highly variable fragmented practice
  • Lack of legitimacy (linked to voice patient
    /public engagement)
  • Very limited range of providers

22
Re-launching Commissioning
  • Commissioning Framework (July 06)
  • Practice-Based Commissioning Guidance (November
    06)
  • Interim New NHS Contract (December 06)
  • Care and Resource Utilisation demand management
    (December 06)
  • Commissioning Framework for Health, Care
    Well-being (March 07)
  • A Vision for World Class Commissioning (Planned
    for December 07)

23
Approach to Contracting
  • The need for a NHS contract was introduced with
    in the Commissioning Framework, July 2006
  • It has the main tool for achieving accountability
    and improving performance in a system with more
    autonomous providers
  • It is legally-binding for NHSFTs, the IS and
    Third Sector
  • Recognises need for greater focus on services
    provided away from acute hospitals

24
Learning from the Acute Contract
  • The interim contract was generally well-received
  • Co-ordinating commissioner arrangements are
    broadly right
  • The contract is a useful as a framework across
    the NHS to support consistent behaviours
  • Each set of parties felt that the risk was
    unfairly weighted against them
  • Very few participants were able to describe
    accurately the levers and sanctions in the
    interim contract
  • In a number of cases mandatory elements of the
    contract were deleted during negotiations

25
Learning from the Acute Contract
  • There was not enough time to prepare and
    implement properly
  • Greater clarity is need on what is mandatory and
    what is negotiable
  • The roles of the SHA, PCT, Co-ordinating
    Commissioner and associates need to be clearly
    described
  • The Co-ordinator / Associate role needs to be
    developed around a binding standard consortium
    agreement, supported by clear and consistent
    guidance
  • The legal language needs to be simplified and
    explained
  • The implementation arrangements and guidance need
    to be significantly improved

26
Current Status
  • Contracts for Mental Health and Learning
    Disabilities, Ambulance Services, Community
    Services are due for publication in the autumn.
  • Some elements remain to be concluded and we are
    continuing to seek stakeholder views
  • Todays presentations on the contracts structure
    and controls represent current thinking and
    proposals
  • Further implementation support events will be
    scheduled after the publication

27
NHS Standard Contract
  • Operating Framework

28
Context
  • CSR07 average 4 real terms growth over three
    years, compared to 1.9 for total public
    expenditure
  • Three Departmental Strategic Objectives
    Promoting Better Health Well-Being For All
    (PSA) Ensuring Better Care For All (PSA) Better
    Value For All
  • Contribution on six PSAs led by other Departments

29
Four Strands
  • Priorities Freeing up the front line while
    maintaining a focus on the issues of most concern
    to the public.
  • Enablers Developing world class commissioning
    and using reform levers to help transform
    services.
  • Financial regime A framework that fully
    supports reform goals and incentivises
    improvements in services and choice.
  • Business processes A business-like and
    transparent approach to planning and management
    of risk

30
Process and Stakeholders
  • DH process up and running, led by David Flory and
    overseen by the NHS Management Board
  • Stakeholders will be fully engaged Monitor,
    Healthcare Commission, NHS Confederation etc
  • Important links with Department of Communities
    and Local Government (LAAs)

31
Priorities
  • Will need to take account of
  • PSAs
  • Existing commitments
  • LAAs
  • Direction of travel

32
Priorities
  • Aim will remain the creation of greater local
    freedom for PCTs to respond to local need and
    expectations, coupled with clear accountability
    and continued focus on national priorities.
  • Increasing focus on outcomes
  • Better Health For All Life expectancy,
    inequalities, smoking, mental health, independent
    living
  • Better Care For All 18 weeks, HAIs, access,
    LTCs, maternity choice, patient satisfaction

33
Enablers
  • Incentives and levers
  • Compliance and assurance programme
  • Public and patient empowerment
  • Workforce
  • New models of care/NHS Next Stage Review
  • IMT
  • CQUIN

34
Financial Regime
  • Confirmation of PCT allocations
  • Expectations on efficiency drivers Better Value
    Strategic Objective
  • Clarification of other planning assumptions

35
Business Processes
  • Need for increasingly business-like and
    transparent approach to planning.
  • Better alignment of NHS and LA planning
    processes.
  • Clarification of the roles and responsibilities
    of each part of the system.
  • Timetable for local plans to be agreed and
    confirmed.

36
CQUIN
  • Update on Commissioning for Quality and
    Innovation
  • 10.20 - 10.50


Simone Bayes Siobhan Jones
Simone.Bayes_at_dh.gsi.gov.uk
Siobhan.Jones_at_dh.gsi.gov.uk 020 7210 5445
020 7210 5995
37
We want to make quality and innovation part of
the commissioner-provider discussion everywhere
  • The Next Stage Review set out visions for high
    quality services and new measures to enable and
    support the NHS to increase quality
  • There are many good local and regional quality
    improvement initiatives in the NHS
  • In some places, these already bring quality
    improvement and innovation into commissioning
    discussions. However, we know this good practice
    is inconsistent
  • Several places in UK and internationally are
    successfully using incentives to improve quality
    we want to make it easier it do this in the NHS
  • A new national framework aims to support and
    embed a cultural shift by making quality and
    innovation part of the commissioner-provider
    discussion everywhere
  • This will be a developmental process which will
    embed quality as a priority for organisations and
    their Boards, so there are real improvements in
    quality of care for patients in the long term

38
Development of the CQUIN payment framework has
been based on the four principles of NSR
implementation
  • The emerging principles of CQUIN have been
    developed through discussions with NHS colleagues
    on their experience
  • The development and agreement of local CQUIN
    schemes will depend on commissioners and
    providers working together to drive quality
    improvement and innovation, supported by SHAs
  • This is a developmental journey. Nationally and
    locally we should learn lessons from the first
    year to inform future development

CO-PRODUCTION
  • Local CQUIN schemes will need to be developed
    with clinicians and use clinically meaningful
    indicators as demonstrated by similar schemes
    already running successfully eg in the North West

LOCAL CLINICAL ENGAGEMENT
  • The framework has explicitly been designed to
    allow good existing work to continue and develop,
    and with as much flexibility as possible, within
    a few broad national parameters, where NHS
    colleagues have advised they are needed

SUBSIDIARITY
  • The CQUIN payment framework will help embed
    quality as the organising principle, bringing it
    into commissioning and contracts
  • It aims to reinforce the Quality Framework and
    will help PCTs demonstrate their World Class
    Commissioning competencies

ALIGNING SYSTEM ARCHITECTURE
39
A CQUIN payment framework will be just one part
of a comprehensive approach to quality and
innovation
Approach to deliver high quality care throughout
the NHS
Define
Measure
Publish
Reward
Improve
Regulate
Innovate
Changing the way standards are created and set by
expanding NICE so it selects the best standards
available, or fills the gaps, and runs a new NHS
Evidence service
  • Quality Metrics across service line (Patient
    experience and patient related outcomes)
  • Clinical dashboards for teams
  • Initial metrics being developed for the 2009/10
    NHS Operating Framework
  • All providers of NHS services will publish
    Quality Accounts from April 2010
  • Comparat-ive information on NHS choice
  • New Commission-ing for Quality and Innovation
    (CQUIN) payment framework
  • Multi-year tariff projections, tariff for mental
    health
  • Strong role for regulation by the Care Quality
    Commission. Annual report to Parliament
  • Regulation to be extended to primary care for
    first time, in time extended to dental practices
  • Stronger clinical engagement in commissioning
  • Medical Director Clinical Advisory Board at
    every SHA
  • Quality Observatory in every region
  • National Quality Board
  • Best Practice Tariffs programme from 2010/11
  • SHAs to promote innovation, new fund, and prizes
  • Health Innovation Education Clusters
  • Academic Health Science Centres

40
The Darzi review said a proportion of provider
income will be made conditional on quality and
innovation
Health communities will develop local schemes
within broad parameters set out in a national
Commissioning for Quality and Innovation (CQUIN)
payment framework
LOCAL ROLE
REGIONAL ROLE
  • Given their market management and assurance role,
    SHAs may have a role in supporting PCTs in
    setting fair and transparent goals.
  • When established, Quality Observatories may help
    support PCTs in developing local schemes.
  • Any disputes between PCTs and providers would be
    resolved through existing resolution processes in
    place for contracts.
  • Local CQUIN schemes will be developed by the lead
    PCT for each provider taking into account views
    of Associate PCTs.
  • Lead PCTs will identify local priorities and
    agree with the provider appropriate goals as part
    of contract negotiations.
  • The lead PCT will need to clarify the roles and
    responsibilities locally, and consider who they
    may wish to involve in developing their local
    scheme e.g. patients.

NATIONAL ROLE
  • DH sets the framework for local flexibility to
    ensure transparent mechanisms
  • Support learning on a developmental journey eg
    optional exemplar scheme(s)

41
PCTs should choose the indicators for CQUIN in
discussion with providers
  • AREAS OF QUALITY
  • The national CQUIN framework will align with the
    Quality Framework, focusing on three elements of
    quality
  • safety,
  • effectiveness (including clinical outcomes and
    PROMs),
  • user experience
  • Local CQUIN schemes should reflect these three
    areas and also recognise innovation.

Innovation
  • CHOOSING INDICATORS AND GOALS LOCALLY
  • Where nationally standardised definitions exist
    PCTs should use these (levels 1-3).
  • If national definitions do not exist, PCTs may
    choose to experiment and develop new indicators
    in agreement with providers (level 4).
  • Goals should be stretching but realistic

1
42
Income will depend on quality - rather than
paying more for quality. The amount affected is
likely to grow
  • Uplifts in contract value will be calculated to
    create funds for CQUIN at PCT level improvement
    will be integral to what PCTs pay for
  • The size of the incentive will be decided
    nationally - probably around 1-4 of contract
    value, based on the limited international
    evidence
  • We expect it will start small perhaps 0.5 or 1
    in the first year. As people become familiar with
    the scheme, the percentage will increase,
    building on the feedback from experience and the
    evaluation

SIZE OF INCENTIVE
OPTION OF ADDITIONAL MONEY
  • Allowing provision for additional money could
    help make CQUIN a stronger incentive and allow
    reward for very challenging goals
  • PCTs would decide whether to offer additional
    money, and how much
  • A payment schedule will need to be agreed
    locally.
  • PCTs could pay some or all of the CQUIN money in
    anticipation of most goals being met, as they
    should be realistic as well as challenging. This
    will ease cash flow and support good
    relationships. If goals are not achieved, later
    payments could be stopped or adjusted later. The
    timing of final adjustments will be affected by
    how fast reliable data is available

FREQUENCY OF PAYMENT
43
How will local CQUIN schemes work in practice?
There will be a number of steps in developing the
local schemes. Several of these will take place
simultaneously, as part of the contract
negotiations.
  • Develop a local scheme
  • Agree local roles, responsibilities and who to
    involve
  • Commissioner and provider agree priority areas to
    improve, indicators and realistic improvement
    goals
  • Agree overall scheme and how payment will reflect
    the indicators
  • Monitor and manage scheme
  • Make payments
  • Review progress against goals
  • Make sensible assessment of performance and
    reconcile payment
  • Review the scheme

Publish scheme
44
We have engaged with a range of NHS and
independent sector colleagues. Clear principles
are emerging
The Commissioning for Quality and Innovation
(CQUIN) payment framework will make a proportion
of a providers contract value conditional on
local quality improvement and innovation goals
  • PCTs should agree local schemes with all
    providers on national contracts. Goals in local
    CQUIN schemes should be stretching but realistic
    and draw from established indicators
  • Initially, PCTs may wish to focus more on
    incentivising improvement in data collection on
    quality. From the second year, PCTs should start
    to consider including quality goals in their
    local scheme, focusing on improvement over time
  • Local CQUIN schemes can be used to support
    existing quality improvement initiatives and
    innovation, and show World Class Commissioning
    competencies
  • Local CQUIN schemes should be published showing
    both the achievement against previous goals, and
    the promised goals for the forthcoming year
  • It should apply to all service types covered by
    national contracts
  • High Quality Care for All made clear this would
    begin from 2009/10

45
The CQUIN framework should apply to all service
types covered by national contracts
  • The principle that a providers income should
    reflect quality should not be limited to just one
    sector. The CQUIN payment framework will apply
    to services covered by national contract i.e.
    acute, community, mental health and ambulance
    services.
  • Following feedback from the NHS, we now think
    that introducing CQUIN in all sectors at the same
    time may stretch PCT commissioning capability and
    capacity too far. Therefore, we suggest that
    CQUIN is mandatory for acute in 2009/10, and
    optional for community, mental health and
    ambulance services.
  • In primary care, there are existing incentive
    schemes, in particular the Quality and Outcomes
    Framework for GPs, which we do not want to
    duplicate.
  • Concerns raised
  • This will be hard for PCTs to do
  • Phase changes dont require people to do
    everything at once and first, get new contracts
    right
  • Large number of providers if do for all sectors
    simultaneously do PCTs have capacity to agree
    schemes with all from scratch?
  • For many areas of quality, data and information
    systems are less developed than in acute

2009/10 Mandatory Acute Optional Ambulance,
Community Mental health
2010/11 Mandatory Acute, Ambulance, Community
Mental health
DO YOU AGREE?
46
We want your help answering some practical
questions about how the CQUIN payment framework
will work
  • Who will drive the scheme locally?
  • How do you encourage discussions on quality
    improvement now? How will you use CQUIN to
    complement this
  • What do you see as the SHA role?
  • What would you want DH to do to support the use
    of CQUIN?
  • What benefits do you think CQUIN will bring?
  • What risks and barriers do you foresee? How can
    they be managed?
  • Who will be involved in PCTs in developing and
    implementing local CQUIN schemes?
  • Should CQUIN be optional or mandatory for mental
    health services in 2009/10?
  • Please tell us if you already have local
    financial incentives on quality

47
Coffee Break

48
NHS Standard Contract
  • Aims and Principles of Contracting

49
What is the Contract?
  • The NHS Standard Contract, will cover agreements
    between PCTs and providers for the delivery of
    NHS Funded Care
  • Is legally binding
  • It has a default duration of 3 years. Guidance
    will be issued to enable shorter or longer
    contract periods.
  • The contract will recognise and allow for
    Partnership Commissioning (under S75 NHS Act 2006
    and S10 Children Act 2004
  • Providers can be Foundation Trusts, NHS Trusts,
    Care Trusts, Independent Sector and Third Sector.

50
Key Principles of a legal contract in the NHS
  • Legally Binding
  • Fair and equitable
  • Encourage a partnership
  • Practical Future-proof
  • Embrace policy
  • Provide for remedy before penalty
  • Mandate in order to maintain NHS principles
  • Allow as much local agreement as is practical
  • Keep as simple as possible

51
Why stand-alone standard NHS TCs?
  • To supports NHS principles, values and standards
    and the NHS Constitution
  • To provide a consistent minimum fair playing
    field and prevent some contracts being unfair
    compared with others
  • To simplify and focus the contract negotiation
  • To avoid nationally-required generic changes
    having to be executed through multiple contract
    changes
  • To remove the bulky legal and boiler plate
    elements from the procurement

52
Who will use the new Contract
  • The Contract will apply to agreements from
    2009-10 as follows
  • All NHS Trusts and Care Trusts
  • Foundation Trusts
  • New FTs and existing FTs whose contracts expire
    in March 09, are required to adopt the new
    Contract for 2009/10 onwards.
  • FTs with contracts which extend beyond March 09
    may adopt the new Contract or retain their
    existing contracts until the required notice
    period passes.
  • Independent Sector and Third Sector Providers
  • The contract is designed for use by IS and Third
    Sector providers whose contracts expire at the
    end of 2008/09.

53
Contract RelationshipsStakeholder Principles
  • The contract should
  • Reflect vision, long term planning and change
  • Recognise the community interest
  • Provide clarity on commitments that need to made
    to stakeholders
  • Clarify and define respective roles and
    responsibilities
  • Recognise that open information is required from
    both parties to manage the contract
  • Underpin a relationship between equals
  • Understand mutual dependency and benefit of the
    parties in aiming for a partnership approach
  • Support co-operation and collaborative behaviours
    that benefit both parties and cement the positive
    relationship between them.
  • Be based on terms that are deliverable in practice

54
Contract RelationshipsExpected behaviours
  • Find and support win-win solutions
  • Achieve appropriate risk sharing, and sharing of
    any benefits that are realised by mutual effort
  • Maintain mature, regular dialogue within a
    professional code of conduct
  • Ensure flexibility where there are genuine
    problems in delivery
  • Provide incentives as well as penalties
  • Recognise investment required to achieve
    requirements over a reasonable time period
  • Support providers to change their service offer
    over time in relation to changes brought about
    through patient choices
  • Maintain honesty and transparency across both
    parties and with patients and the public

55
Main Features Heads of Terms
  • Standard terms and clauses the boiler plate
  • Activity planning and review
  • National v Locally-agreed quality standards
  • Local Developmental Quality Standards
  • Requirements on information flows and provision /
    Data Quality Improvement Plans
  • Bi lateral and Multi Lateral Contracts will be
    available to Commissioners
  • Dispute resolution arrangements
  • Contractual Control mechanisms

56
Structure of the Contract
57
Draft Standard NHS Terms and Conditions
  • Definitions and Interpretation
  • NHS Principles and Values and Constitution
  • Services Environment, Vehicles and Equipment
  • Emergency preparedness, Business Continuity Plan,
    Duty of Partnership
  • Prices where PbR applies and Payment
  • Representatives
  • Consent
  • Complaints
  • Staffing and Employment issues
  • Emergencies Urgent Care
  • Death of a Patient
  • Reporting, Analysing Learning from Patient
    Safety Incidents
  • Quality
  • Transfer and Discharge Obligations
  • Governance and Transaction Audit
  • Patient Health Records
  • Confidential Information
  • NHS Branding and Promotion
  • Pastoral and Spiritual care
  • Discrimination
  • Dispute Resolution Procedure
  • Monitoring
  • Performance mechanisms (including mechanisms for
    retention of payments)
  • Suspension and Termination (including partial)
    and Consequences
  • Remedies
  • Inducements to Purchase
  • Variations
  • Representations and Warranties
  • Notices
  • Force Majeure and Major Incidents
  • NHS Counter Fraud and Security Management
  • Third Party Rights
  • Waiver
  • Assignment and Sub Contracting
  • Exclusion of Partnership
  • Non-solicitation
  • Costs and Expenses
  • Governing Law and Jurisdiction

Click to edit Master title style
Click to edit Master title style
Click to edit Master subtitle style
Click to edit Master subtitle style
58
Structure of the Contract
59
Draft must-have elements for local negotiation
  • Consortium agreement between Co-ordinating
    Commissioner and Associates
  • Pricing local agreement of non PbR
  • Activity Plan and Review,
  • Care pathways and Capacity review
  • Commencement and Duration, and Contract Review
  • Information flows and reporting provisions
  • Service specifications and requirements
  • Service Improvement/Development
  • Clinical Networks and Screening Programmes
  • Serious Untoward Incident and Patient Safety
    Incident Reporting
  • Service Targets/indicators
  • Information Audit
  • Demand Management requirements including prior
    approval and utilisation management
  • Termination clauses local elements
  • Quality Standards Nationally required and
    consortium level
  • Retention of payments thresholds / ranges
  • Performance - indicators, thresholds / ranges

60
Structure of the Contract
61
Elements Entirely for local agreement
  • Examples might include
  • Additions to specific service care pathways
  • Local care/treatment protocols
  • Performance and quality incentive schemes
  • Locally agreed additional Quality Standards
  • Locally identified additional information
    requirements

62
NHS Standard Contract
  • Key Areas an outline

63
Key Clauses
  • Clause 2
  • Commencement, Duration, Transition
  • Sets the contract term
  • 3 years is default
  • DH will provide guidance where longer or shorter
    contracts may be appropriate
  • SHA will approve all contract lengths that are
    not 3 years
  • Clause 4 Schedule 2 (Service Specification)
  • Services
  • Obliges the Provider to supply Services
  • Service Specifications (Sch2,Pt1 for local
    definition)
  • Activity Plans (Sch3,Pt1, annex1 standard
    format, locally completed)
  • Quality Standards (Sch3,Pt4A Pt4B some
    mandated, some local)
  • The Law

64
Key Clauses
  • Clause 7
  • Prices Payment
  • Obliges the Commissioners to pay for the Services
    provided
  • At the agreed price at tariff and non-tariff
    items
  • Details payment terms
  • 1/12th of the Annual Contract Value on 15th each
    month
  • (This is only obligatory if the Provider has
    issued a valid statement of account)
  • Within 30 calendar days of receipt of invoice for
    NCA
  • Within the terms of the Compact (applies in the
    main to small third sector organisations)
  • Reconciliation of payment rules.
  • What to do in the event of a dispute

65
Key Clauses
  • Clause 8
  • Review
  • Obliges the Commissioner and Provider to review
    the contract including
  • The Activity Plan
  • The Annual Contract Value
  • Operating Framework requirements
  • The locally agreed Schedules
  • Performance (including notices)
  • Compliance with Quality, Clinical Governance
    Demand Management
  • Complaints, incidents and SUIs
  • Information
  • Sets out the requirement to plan the following
    years activity together

66
Key Clauses
  • Clause 16
  • Quality
  • Specifies the standards to which Services must be
    performed
  • The Law
  • Good Clinical Practice
  • Good Healthcare Practice
  • Clinical quality development plans
  • Standards and recommendations of other bodies and
    reports (Standards for Health/National Minimum
    Standards, SUI reports, NICE)
  • Obliges the Provider to have regard for any DH
    guidance
  • Requires the publication of an annual clinical
    quality review (this will become this Quality
    Accounts)

67
Key Clauses
  • Clause 28
  • Dispute Resolution
  • Describes the Parties rights and obligations
    when in dispute
  • The obligation to try and resolve internally
  • Escalation to the SHA / Monitor if agreed
  • Escalation to CEDR
  • CEDR mediates the dispute in line with Schedule 9
    Dispute Resolution Procedure
  • If after 20 operational days agreement is not
    reached, agreement will be by Independent Binding
    Pendulum Adjudication
  • The Parties still retain their rights to
    terminate the contract with 12 months notice
    (subject to Mandated and Essential Service
    obligations)
  • NOTE Disputes between PCTs and NHS Trusts will
    be arbitrated by the SHA, not CEDR

68
Key Clauses
  • Clause 29
  • Information Requirements
  • Describes the Data Quality Improvement Plan
  • Links to Schedule 5 which details the
    Information requirements
  • Sets out the consequences of not supplying
    information
  • The commissioner must demand the information
    formally, in writing and stating that retention
    will occur if information is not supplied
  • The Provider will have 5 days to comply
  • If the Commissioner(s) actions have caused the
    failure the Provider cannot be held accountable

69
Key Clauses
  • Clause 32
  • Performance
  • Describes the performance management
    system/process
  • Provides for remedy before penalty
  • Exception Report (to Board, Regulators, SHA) may
    be the biggest consequence

70
Key Clauses
  • Clause 33
  • Clinical Quality Review
  • Describes the clinical review process
  • Links to Schedule 3 Part 4A
  • Clinical Quality Performance Indicators sets out
  • The indicators (some mandated, some for local
    agreement)
  • Thresholds
  • Consequences and
  • measurement methodology for Nationally mandated
    and locally agreed
  • Aims to expose, investigate and rectify
  • Penalties are only for failure to implement a
    rectification plan (regardless of whether it
    rectifies the breach)
  • Is a closed-loop control system for continuous
    improvement

71
Key Clauses
  • Clauses 34 35
  • Suspension Termination
  • Allow the Co-ordinating Commissioner to suspend,
    terminate or partially suspend of terminate.
  • The partial element is of a Service or a part
    of a Service
  • Allows for restoration of suspended services
  • Allows for parties to terminate just because they
    want to (only after year one and with 12 months
    notice)
  • If a Provider is in breach of contract it has 60
    days from notification to remedy before it is a
    termination event
  • The Provider will be obliged to continue
    Mandatory Goods and Services and Essential
    Services

72
Partnership Arrangements
  • Key new section in the contracts
  • Arises from S75 NHS Act 2006 and S10 Children Act
    2004
  • Trigger clauses will be put in place to cover
    the commissioning partnerships and separate
    trigger will be put in to cover provider
    partnerships. These will act as a sign post to
    the Partnerships Schedule
  • New Schedule (written but under review) drives
    the process
  • Both Provider and Commissioner S75/S10 agreements
    to be documented within the contract (Sch 11)
  • If there is not a commissioner or provider
    partnership the provisions of the contract
    referencing the arrangement will not apply

73
Controls and levers in the contract
  • A contract enables parties to agree rules and
    sets out the methods for dealing with and the
    consequences of failure.
  • Parties can resolve issues without resorting to
    the contract but the contract sets the boundaries
    in a clear and agreed form.
  • If a party breaches a contract where there are no
    levers then the other party has only two choices
    ignore the breach or terminate.
  • Where services, especially clinical services, are
    concerned there are contract targets which
    dictate the level of service that is to be
    provided. The contract levers allow this to be
    monitored and for appropriate corrective measures
    to be agreed.
  • Where failure occurs defined consequences act as
    a reasonable deterrent where termination my be
    unreasonable or impossible.

74
Purpose of Controls
  • Clinical
  • To improve performance
  • To engender continuous improvement
  • To mitigate failure to implement agreed change
    (not failure to hit targets)
  • Non-Clinical
  • To mitigate poor performance
  • To provide risk, not certainty of penalty
  • To increase commissioner control over spend
  • Performance priority
  • To underpin delivery of key national policies and
    targets
  • To ensure consistency and fairness
  • Termination
  • To ensure Patients and the NHS is protected from
    poor contractors

75
Summary
  • Contract controls provide a framework for
    improvement
  • Consequences are based on a failure to act or
    implement agreed action plans and not the breach
    itself
  • Most indicators (clinical or otherwise) will be
    for local agreement
  • Some consequences will be for local agreement
    DH will provide guidance
  • The control mechanisms protect both parties
  • Risk to organisational reputation may be a
    significant consequence both to the organisation
    (in the eyes of the patients/service users) and
    the individual officers (professionally)
  • The regimes are constructed in a spirit of
    co-operation not penalisation
  • Termination remains the ultimate sanction

76
Preparatory Steps (within the contract)
  • There are a number of things that you can do now,
    in advance of the publication of the full
    contract
  • Governance
  • Quality requirements
  • Pricing structure
  • Service Specification
  • Activity and Volumes
  • Information requirements (want, need, actually
    get)

77
Preparatory Steps (outside the contract)
  • There are a number of things that you may need to
    address out side the strict confines of the
    contract which will help
  • Partnership arrangements
  • Organisational fitness/competencies
  • Information requirements (want, need, actually
    get)
  • Forthcoming plans (service developments or
    commissioning needs
  • Build on your relationships

78
  • Session QA

79
  • Lunch in the Restaurant

80
NHS Standard Contract
  • Afternoon Breakout Groups
  • 13.30 - 14.45

81
SHA Contract workshopsNHS Standard Contract for
Community ServicesCraig Porter
82
Primary and community care strategykey themes
  • Not a national blueprint
  • Setting a clear vision
  • and creating the right environment for leading
    local change

Shaping services around individuals
Promoting healthy lives
Continuously improvingquality of care
Clinical leadership
World class commissioning
Patient power and choice
83
Primary Community Strategy clinical service
improvement areas
  • Services for Staying Healthy
  • Services for Children and families
  • Acute care Services in the community
  • Services for Long Term Conditions
  • Services for Rehabilitation
  • End of Life Care

84
(No Transcript)
85
Working Group Membership
  • NHS Confederation Primary Care/FT Network/IS
    Network
  • 3rd sector umbrella organisations
  • SHAs
  • PCT Commissioners Providers
  • DH reps
  • Social Enterprise providers

86
Scope of community services contract
2
1
4
3
Out-Patient care
In-Patient Care
Community drop-in
Domiciliary Care
Includes Rehabilitative and palliative care in
community hospitals, hospices, nursing or
residential homes
Includes therapy services such as physiotherapy
and podiatry as well as district nurse clinics
diagnostics.
Includes specialist services such as family
planning health visiting
Includes home visits by district nursing,
occupational therapy, community midwifery and
health visiting.
Community Services
87
Aims, Strategic Links and Potential Barriers of
Community Services Contract
Strategic Links
Aims
Potential Barriers
Next Stage Review including Primary Community
Services Strategy System Management 3rd
sector SE Programme Wider programme re.
community services development Links to CQC re
standard setting, monitoring and response to
failure.
Wide scope of coverage Cross-departmental
approach for Section 75 agreements Joint
approach to be agreed with DCSF re. childrens
services, Legal agreements already in place with
non-NHS bodies may delay implementation Current
lack of standards/ targets in relation to quality
and activity Community MDS not in place, metrics
not yet available for majority of services
Flexibly support innovative commissioning
approaches Improve care outcomes, Catalyst to
maximise quality and productivity Support both
joint commissioning pathway based
care Develop benchmarking.
88
Potential Contract Routes for Community Services
(1 of 2)
Commissioner
Option 1
Benefit Reflects most common current practice
with commissioner contracting on an
organisational basis with each provider therefore
easy to implement
Option 2
Commissioner
Lead provider for geographical area
Benefit Could reflect PBC or local approach with
Local Authority with one provider accountable to
commissioner
89
Potential Contract Routes for Community Services
(2 of 2)
Option 3
Commissioner
Benefit Commissioner / provider split is
maintained, and commissioner retains full control
of commissioning care
Strong Commissioning
SINGLE CARE PATHWAY
Commissioner
Benefit One provider retains clinical and
financial responsibility for the patient, as well
as accountability to the commissioner
Option 4
Lead provider
SINGLE CARE PATHWAY
90
Structure of the Contract
91
Key Features
  • Service specification template
  • To be used for providers of all sectors
  • 3 year duration as a norm
  • Bi-lateral or multi-lateral basis
  • Care pathways, lead providers
  • Partnership arrangements
  • Incorporates 18 weeks/PBR etc where applicable
  • Flexible payment arrangements where appropriate

92
Testing
  • At least 2 contractual relationships tested in
    each SHA
  • 3 phase,10 week test period
  • Flexible focus
  • Section 75, Care Trusts, 3rd Sector, IS
  • Open consultation

93
Learning from Testing
  • Generally positive
  • Grants or contracts?
  • Which contract?
  • Internal providers
  • Capacity capability of both parties
  • Maturity of relationships
  • Surplus
  • Terminology to embrace integrated health social
    care

94
Stakeholder Principles
  • The contract should
  • Reflect vision, long term planning and change
  • Recognise the community interest
  • Provide clarity on commitments that need to made
    to stakeholders
  • Clarify and define respective roles and
    responsibilities
  • Recognise that open information is required from
    both parties to manage the contract
  • Underpin a relationship between equals
  • Understand mutual dependency and benefit of the
    parties in aiming for a partnership approach
  • Support co-operation and collaborative behaviours
    that benefit both parties and cement the positive
    relationship between them.
  • Be based on terms that are deliverable in practice

95
Service Specification Template
  • Aim provide shared understanding of contracted
    service
  • NOT an operational policy
  • Aims, population served, fit within whole
    system
  • Local prices performance measures
  • Additional specified measures for block contract
    prices
  • Guidance via template re. service specific issues
    e.g. Children, end of life care, community
    hospitals

96
Quality Performance
  • Applicable national targets
  • Patient experience
  • Unplanned admissions
  • Reducing inequalities
  • Improving productivity
  • Waiting times
  • Assessment care planning
  • Care management
  • Outcomes
  • Activity monitoring
  • Costs prices
  • Continual service improvement

97
Moving to outcomes
98
What we mean by currency
Fee for individual service
Per period - eg year of care
Per patient pathway
Per case diagnostic/ procedure
Per day
Block budget/ grant
Per head - capitation
There are pros and cons to any point along this
spectrum
ENTIRELY AGGREGATED
ENTIRELY ATOMISED
What does it look like?
For what is it used?
99
How currencies are developed
100
Who does what by when?
  • Department of Health
  • Nov 08 currency and pricing framework published
  • Dec 08 Core MDS identified for approval
  • April 10 small number of national currencies
    developed ready for implementation
  • April 09 Evaluation of PbR for community
    services begins
  • NHS
  • Dec 08 local currency and pricing development
    begins
  • April 09 limited implementation of currencies
    and prices (PbR)
  • April 10 adoption of nationally developed
    currencies (pricing local?)
  • April 11 widespread implementation of locally
    developed currencies and prices

101
Contact Details
  • Tracy.cannell_at_dh.gsi.gov.uk
  • Craig.porter_at_dh.gsi.gov.uk
  • Contract web page
  • http//www.dh.gov.uk/en/Managingyourorganisation/C
    ommissioning/Systemmanagement/DH_085048

102
  • Session QA

103
New NHS Contract For 2008 and beyond
  • Closing remarks and
  • Planning for the next workshop

104
New NHS Contract For 2008 and beyond
  • Thank you for attending
  • Please hand in your badge at the event desk for
    recycling