Integrated Management System - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

Integrated Management System

Description:

Development of HSEQ Risk Management in Engen. What has happened on the ... Shell - HEMP. Shell HEMP plus QMS. Petronas HSE MS. Engen HSEQ MS. Engen's HSEQ MS ... – PowerPoint PPT presentation

Number of Views:487
Avg rating:3.0/5.0
Slides: 24
Provided by: engenpetr
Category:

less

Transcript and Presenter's Notes

Title: Integrated Management System


1
Integrated Management System
What is it that is not integrated, doesnt manage
and isnt a system?
2
Time Money
3
Programme
  • Development of HSEQ Risk Management in Engen
  • What has happened on the International scene?
  • Engens HSEQ Management System
  • Overview of the IMS Project and Current Status
  • Integration of HSEQ management into the Engen
    business processes
  • Whats in a name?
  • Different views in the IMS The Rubicks Cube
  • Compliance revisted
  • Demonstration of the IMS
  • Quo Vadis?
  • Final Thought

4
Development of HSEQ Risk Management in Engen
  • Pockets of Knowledge/Excellence
  • Petronas HSE MS 1998 2000
  • HSEQ Division 2001
  • HSEQ MS 2001 gtgtgtgtgt

5
What had happened on the International scene?
 
King II Report
Business Excellence
Compliance Requirements
Turnbull
ISO 90012000
OHSAS 18001
Behaviour Based Safety
BS 8800 King Report
MHS Act (Leon Commission)
ISO 90011994
ISO 14001
OHS Act
Cadbury
Time
6
What do these requirements have in common?
They all assist you to manage the risk/exposure
in your business
BUT
Doing this for the sake of just having a Safety,
or a Quality, or a Health or an Environment
Management System is not good enough - it
can become a cosmetic exercise
These requirements must add value to the business
7
How do we improve our business?
PLAN
ACT
DO
LEADERSHIP COMMITMENT
LEADERSHIP COMMITMENT
IMPROVEMENT
IMPROVEMENT
8
Engens HSEQ MS
  • Shell - HEMP
  • Shell HEMP plus QMS
  • Petronas HSE MS
  • Engen HSEQ MS

9
Engens HSEQ MSThe Eight Elements of Success
  • Leadership and Commitment
  • Policy and Strategic Objectives
  • Organisation, Responsibilities, Resources,
    Standards and Documentation
  • Hazards and Effects Management
  • Planning and Procedures
  • Implementation and Monitoring
  • Audits
  • Management and Review

10
Objective of Engens IMS Project
  • The project objectives were to
  • Develop an electronic integrated management
    system
  • Integrate the various processes, tools and
    measurement criteria used to manage HSEQ in Engen
  • Ensure standardisation, commonality and
    accessibility
  • Contribute to sound corporate governance and
    sustainable development.

Aug.2002
Jan. 2003
Mar. 2003
Oct.2004
Oct 2003
Beyond
Phase 1 Investigation
Phase 3 IMS Component/ Shell Definition
Phase 2 Proof of Concept
Phase 4 IMS Implementation
Phase 5 6 IMS Training Handover
11
How did we integrate HSEQ management into Engen
  • Document each process in detail
  • Analyse each business process, document the risk
    and determine controls to minimise risks and
    cross-reference them to the relevant standard or
    requirement
  • Develop different views of the business
  • Integrate them with forms and policies used
  • Build an Integrated Management System (IMS)
  • Make it available online via the intranet

12
Whats in a name?
  • Electronic repository, containing all the HSEQ
    business processes of Engen
  • Integrates all requirements from the applicable
    legislation and International standards into an
    organisations business processes
  • Integrates all policies and forms into the
    relevant business processes
  • Available on the Engen intranet
  • Contains different views of the business

13
The different IMS views
  • HSEQ MS View Electronic HSEQ Manual
  • ISO 9001 View Electronic Quality Manual
  • ISO 14001 View Electronic Environment Manual
  • OHSAS 18001 View Electronic Health and Safety
    Manual
  • ISO 17025 View Electronic Laboratory Quality
    Manual
  • Organisation View Organisation Chart
  • Enterprise View Highest level core business
    processes
  • Advanced Searching Capabilities to find a
    specific process easily

14
How the IMS works
     
15
The Enterprise View
16
Making Business Operations compliant to Multiple
Systems
ISO 14001
HSEQ MS
ISO 9001
OHSAS 18001
17
Bottom line ensuring our business processes
comply with international standards
HSEQ MS
ISO 9001
ISO 17025
NOSA
ISO 14001
OHSAS 18001
CAP
Legal OHS Act
18
Knowledge Power
19
IMS Demonstration
20
Quo Vadis?
  • SAP v3.1
  • SAP HR
  • SAP EHS v2.7
  • PSDG
  • OH
  • IHS

21
Work Power x Time
Final thought
Work Knowledge x Money
Work Money Knowledge
22
. . .
as K 0
M
8
even if W is small
and conversely
as K
8
M 0
even if W is high!
23
Thank you!
Write a Comment
User Comments (0)
About PowerShow.com