CARE Dissemination - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

CARE Dissemination

Description:

Overall Biggest Problem is to import WORD Styles and to build (and keep) the TOC. ... CEA tuner: start of integrated experiments. 11. SRF. delayed, 30. 18. DESY ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 10
Provided by: careLa
Category:

less

Transcript and Presenter's Notes

Title: CARE Dissemination


1
CARE Dissemination
  1. Status of the Annual Report
  2. Status of Deliverables
  3. Status of Publications

2
Annual Report 2005
  • Final Version of the AR05 submitted to the EC
    yesterday
  • http//care.lal.in2p3.fr/Annual/index.php
  • Signed Financial Papers (Forms C and Audit
    certificates) sent to D. Pasini today by express
    mail.
  • Very little reactivity from D. Pasini. Wait and
    see !

3
Editing the Annual Report 2005
  • The format of AR05 tries to reproduce AR04
  • Most of the time, the description of the
    activity by Work Packages can be translated as
    is. Biggest problems with Figures and Lists.
  • KEEP IT SIMPLE, please !
  • Some difficulties with the First Section
     Management  to re-arrange the material of the
    Activity Annual Report
  • Could ELAN format its Annual Report 06 on the
    CARE AR05, please ? It was very difficult this
    year.
  • Overall Biggest Problem is to import WORD Styles
    and to build (and keep) the TOC. Need a
    professional (S. Chastagner).

4
CARE Deliverables
2004
Activity Deliv. N Deliverable Name Deliv. Type Workpackage/Task N Delivered by Contractor (s) Planned (in months) Achieved (in months)
ELAN 1 ELAN web site Web site All WPs CNRS-Orsay 4 4
ELAN 2 Beam Dynamics code repository site functional Data base WP3 CERN 12 12
ELAN 3 Instrumentation web site Web site WP4 CCLRC, UMA 6 21
ELAN 4 Instrumentation data base Data base WP4 CCLRC, UMA 12 23
BENE 5 BENE web site Web site All WPs INFN-Na 4 4
BENE 6 Annual report of the BENE network Report All WPs INFN-Na 12 12
BENE 7 Proposal for FP6 Design Study of a new neutrino facility Report All WPs INFN-Na 12 delayed to FP7
BENE 8 Proceedings of Multi-MW workshop Report All WPs INFN-Na 12 14
BENE 9 BENE Physics web site Web site WP1 INFN-Pa, CERN 3 3
HHH 10 HHH web site Web site All WPs CERN 12 9
HHH 11 APD web site Web site WP3 CERN 6 9
SRF 12 Final report on reliability issues Report WP2 DESY 9 30
SRF 13 EP on samples best EP parameters Report WP5 CEA 12 26
NED 14 Final report on wire and cable specifications Report WP3 CERN 6 6
NED 15 Design report on 15 T dipole magnet Report WP3 CERN 12 13
5
CARE Deliverables
2005
Activity Deliv. N Deliverable Name Deliv. Type Workpackage/Task N Delivered by Contractor (s) Planned (in months) Achieved (in months)
ELAN 1 Work plan and documentation data base Data base WP1 CERN 24 22
ELAN 2 Data base on SRF documents Data base WP2 DESY 24 24, 70 final
BENE 3 18-month interim report Report All WPs INFN-Na 23 23
BENE 4 Annual report of the BENE network Report All WPs INFN-Na 24 24
BENE 5 Proceedings of NuFact05 workshop Report All WPs INFN-Na 24 27, sent to publisher
BENE 6 Launch of scoping study of a new neutrino facility Web site Report All WPs INFN-Na 18 18
HHH 7 Beam Dynamics code repository Data base WP3 CERN 24 18
SRF 8 EP on multi-cells parameters fixed Report WP5 DESY 13 delayed, 27
SRF 9 Automated EP is defined Report WP5 INFN-Legnaro 21 delayed, 26
SRF 10 Dry ice cleaning parameters fixed Report WP5 DESY 18 delayed, 30
SRF 11 CEA tuner start of integrated experiments Prototype WP8 CEA 15 24
SRF 12 Report on IN2P3 tuner activities Report WP8 CNRS-Orsay 24 delayed, 32
SRF 13 Report on data management developments Report WP9 DESY 21 24
SRF 14 Report on RF gun control tests Report WP9 DESY 23 delayed, 34
PHIN 15 High efficiency photocathode comparison Report WP2 FZR 24 24
PHIN 16 High power laser oscillator Report WP3 CCLRC-RAL 13 13
6
CARE Deliverables
2005 (continued)
Activity Deliv. N Deliverable Name Deliv. Type Workpackage/Task N Delivered by Contractor (s) Planned (in months) Achieved (in months)
PHIN 17 Amplifier construction Prototype WP3 CCLRC-RAL 19 19
PHIN 18 Oscillator amplifier test Report WP3 CCLRC-RAL 23 delayed, 27
PHIN 19 Pulse shaping system phase mask acquisition and test Report WP3 INFN-Milano 16 23
PHIN 20 Pulse shaping system Dazzler acquisition and test Report WP3 INFN-LNF 17 17
PHIN 21 Pulse shaping comparison Prototype WP3 INFN-LNF, INFN-Milano 22 22
PHIN 22 UV harmonic generator test Prototype WP3 CCLRC-RAL 16 delayed, 30
PHIN 23 Laser RF feedback development Report WP3 CERN 21 21
PHIN 24 Two 3 GHz RF guns construction Prototype WP4 CNRS-Orsay 18 delayed, 32
PHIN 25 1-50 MeV spectrometer construction Prototype WP4 CNRS-LOA 24 24
HIPPI 26 Halo measurement device design and construction Report WP5 CERN 18 24
NED 27 Commissioning of heat transfer facility Prototype WP2 CEA, WUT 16 delayed, 25
NED 28 Final report on Quench Protection Report WP2 INFN-Milano 18 23
NED 29 Report on conventional insulation Report WP4 CCLRC-RAL 24 delayed, 30
NED 30 Report on innovative insulation Report WP4 CEA 18 delayed, 36
7
CARE Publications http//www-dapnia.cea.fr/Documen
tation/Care/index.php
8
Updating the Publication Database tough job !
  • ELAN out of steam ?
  • BENE flat as ever !
  • HHH workshop proceedings lets count the
    number of pages !
  • SRF random flow (cf. Sadowskis papers and
    Sekalski 8 Mo e-mail)
  • PHIN many journal publications, never
    submitted to CARE.
  • HIPPI smooth, many thanks to Alessandra.
  • NED en EDMS toute !

9
Future Publications
  • Activity Workshops
  • EPAC Papers
  • LINAC Papers
  • Please, HELP !
Write a Comment
User Comments (0)
About PowerShow.com