Microwind and the Regional Spatial Strategy - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Microwind and the Regional Spatial Strategy

Description:

amend Policy ENV5 B iii) in the RSS to reflect this as follows ' ... 10% of the energy to be used in sizable new development to come from on site RE ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 12
Provided by: aco118
Category:

less

Transcript and Presenter's Notes

Title: Microwind and the Regional Spatial Strategy


1
Microwind and the Regional Spatial Strategy
  • Andrew Cooper
  • Energy Policy Manager
  • Yorkshire and Humber Assembly

2
Draft Regional Spatial StrategyMEGA WHAT!
3
Draft Regional Spatial Strategy
  • Maximise Renewable Energy capacity by requiring
    at least 10 of the energy to be used in sizeable
    new development to come from renewable energy
    sources

4
The Calderdale principle applied to Regional
Spatial Strategy
  • amend Policy ENV5 B iii) in the RSS to reflect
    this as follows
  • Requiring at least 10 of the energy to be used
    in sizable new development to come from on site
    RE sources up to 2010. This will rise to 15 up
    to 2015 and 20 up to 2021.

5
Sizeable?
  • A 'minimum' and a 'recommended' standard that can
    be applied in LDF's
  • minimum standard would reflect the Merton ruling
    i.e. a threshold of 10 dwellings or 1000m2 for
    non domestic developments.
  • The recommended standard a 'threshold' of 1
    dwelling and 500m2 for non domestic developments

6
Influencing Local Development Frameworks a
typical customer
7
Problems with current UDPs too residential!
  • Would detrimentally impact upon the residential
    amenity of neighbouring properties on Spruce
    Drive and Elder Grove in immediate close
    proximity, particularly by virtue of noise
    pollution and visual appearance.
  • Kirklees Council Planning Decision 10/1/2006

8
Wind technology that is not too residential
  • Built in 1817
  • in centre of housing estate
  • Polgate Mill Sussex

9
Problems with current UDPs too rural!
  • the location of a 15 metre high wind turbine
    would be visible injuriously affect the rural
    character of the area detracting from the visual
    amenity of the green belt
  • Kirklees Council Planning Decision 30/3/06

10
Wind technology that is not too rural
  • Great Chiswell Windmill, Cambridgeshire

11
Not too urban , not too rural.
Write a Comment
User Comments (0)
About PowerShow.com