HF Electronics - PowerPoint PPT Presentation

About This Presentation
Title:

HF Electronics

Description:

HCAL-Fermilab 7 Feb 2003 Hazen / Machado. HF Electronics. PMT Readout Update ... Blue Nichia LED driven by Zetex avalanche transistor. Pulser synchronized to QIE clock ... – PowerPoint PPT presentation

Number of Views:30
Avg rating:3.0/5.0
Slides: 16
Provided by: ohm6
Learn more at: http://ohm.bu.edu
Category:

less

Transcript and Presenter's Notes

Title: HF Electronics


1
HF Electronics
  • PMT Readout Update
  • E. Hazen, J. Rohlf, E. Machado
  • Boston University

2
Outline
  • PMT-to-QIE cabling summary
  • Patch panel / ROBOX cabling design
  • New QIE HF boards
  • Test results (review)
  • Plans for Test Beam

3
PMT-to-QIE Cabling
Multi-pin shielded connectors (MDR-36)
PMT Box
QIE Signal Input
PMT Anode
50O coax
Skew-Clear 50 ? single-ended to ground
QIE Reference Input
Two pairs per PMT channel
Coax shield ground at each PMT base
Separate Ground for each PMT
Overall shield connected to QIE ground
4
PMT Box Signal Cabling
SMB plug/socket for patch panel
MMCX on prototypes Soldered for production?
50 ? mini-coax
Patch panel PCBs
Space for HV, Gas connectors
5
MDR Connector
12-pair Skew-Clear cable handles 6 QIE
channels Each channel has Pair 1 Signal,
Signal Return, Shield Pair 2 Reference,
Reference Return, Shield Overall Shield connected
to metal connector backshell
Ref
Signal
Shield
Shield
Ref Return
Signal Return
Can accommodate ether paired or coax cable for
testing...
6
Skew-Clear Cables
  • Two 5m cables delivered, but backshell with
    locking mechanism didn't fit... need to fix
    before testbeam cables are made.
  • Can use existing cables for lab testing

Cables made by assembly house have only
shrink tubing
7
QIE boards for HF
  • New prototypes available here
  • Hope to take some home with new CCM for testing
    starting next week...

8
PMTQIE Test Results (recap)
  • Blue Nichia LED driven by Zetex avalanche
    transistor
  • Pulser synchronized to QIE clock
  • White paper (multiple sheets) used to attenuate
    to a fraction of a pe
  • Data recorded using HTRDCC thru VME

9
20 time samples (1500 V)
0-40 LC
pulse
reflection (electric)
reflection (electric)
10
1, 2 pe response at 1500V
1500 V
11
1pe peak vs HV
1100 V
1200 V
1100 V
1300 V
1400 V
1500 V
1600 V
1700 V
12
Signal / Pedestal vs HV
sample 8 (pulse)
signal
sample 9 (reflec)
HV
13
Average, Typical LED Pulses
14
HF Electronics for TB
  • BU Responsibilities
  • 12 skew-clear cables
  • Patch panels for PMT boxes (how many?)
  • Plus participation in
  • 3U crates w/ backplanes (2)
  • CCM QIE board testing
  • LV power (?)

15
Task List
Write a Comment
User Comments (0)
About PowerShow.com