Title: City of Port Angeles, Washington Ediz Hook Boat Launch Facility (07-1376-D)
1City of Port Angeles, WashingtonEdiz Hook Boat
Launch Facility(07-1376-D)
- Boating Facilities Program
- Advisory Committee
- Presentation
Thursday, September 27, 2007 _at_ 130 pm Presenter
William A. Sterling, P.E. Deputy Director for
Recreation
2VICINITYMAP
- Port Angeles /Ediz Hook Boat Launch
3Service Area Map
- Showing Launching Facilities _at_
- John Wayne Marina
- Sequim Bay State Park
- Boat Haven (2 ramps)
- Ediz Hook
- Port Angeles /Ediz Hook Boat Launch
4Restroom Facilities
Parking Area
U.S. Coast Guard Station
Commercial
Boat Ramp
Pilot Boats
With two docks in operation
Port Angeles/Ediz Hook Boat Launch
5Shown with 2 Docks in Operation East Dock (left)
not in Operation
Port Angeles/Ediz Hook Boat Launch
6Low Tide
High Tide
77/12/07 _at_ 801 am -2.7
Existing Concrete Ramp
Port Angeles/Ediz Hook Boat Launch
81. Need
- Estimated 4,000 launches/year
- City population 19,000
- Immediate County population 35,000
- Only 4 public boat launches in immediate area
- Ediz Hook
- Boat Haven
- John Wayne Marina (20 miles)
- Sequim Bay State Park (25 miles)
- Present facility now reduced to one dock (limited
access)
Port Angeles/Ediz Hook Boat Launch
9Low Tide
High Tide
Port Angeles/Ediz Hook Boat Launch
10(No Transcript)
11Port Angeles/Ediz Hook Boat Launch
Project Map
122. Site Suitability
- Located on inner harbor site
- Existing facility on site already
- Access to Strait of Juan de Fuca
- City owns existing facility
- Greatly benefits smaller boats on trailers
- Higher hazard if facility is not useable (deeper
water)
Port Angeles/Ediz Hook Boat Launch
133b. Project Design
- Remove remaining 7 failing piles
- Install 8 new 10 galvanized piles
- Ramps/Floats not a part of this request
Port Angeles/Ediz Hook Boat Launch
14Missing Floats - Pile
15Development Cost Estimate Summary
Demolition (pile removal) 7 each 5,750.00
Mobilization (will review options of combining efforts with Boat Haven to reduce costs) 31,073.00
Pile Driving (8 each) 46,000.00
Galvanized Piling (8 each) 26,680.00
Pile Caps (8 each) 2,300.00
Tax _at_ 8.4 9,391.00
A E Cost 24,238.00
Total Estimated Project Cost 145,432.00
Port Angeles/Ediz Hook Boat Launch
164. Cost - Benefit
- Costs of Non-Replacement
- Reduced Public Access to Water
- Less Recreation Time on Water
- Congestion at Boat Haven Facility/Ediz Hook
Facility - Safety concerns at Existing Facility
- Benefits of Replacement
- Increased Capacity
- More Recreation Time on Water
- Dispersed Traffic/Less Congestion
- Increased Safety for Launching
- Provides options for boaters
- Partnership with State and City
- Decrease in annual maintenance
Port Angeles/Ediz Hook Boat Launch
175. Boating Experience
- Inner harbor (3.8 sq. miles)
- Trailer sized boats (power and sail)
- City owned since 1990
- Double capacity if piles replaced
- Quicker access/easier launching (solo)
- Year-round access
186. Boats on Trailers
Trailer Parking Area
Port Angeles/Ediz Hook Boat Launch
197. Project Readiness
- Design completed
- Permits issued
- City share of funding is in place
- Early spring 2008 project
Port Angeles/Ediz Hook Boat Launch
20Port Angeles/Ediz Hook Boat Launch
21Status of Permits
Aquatic Land Use Authorization Approved
Dredge/Fill Permit Nationwide permit 3 Issued
Hydraulics Project Approval Issued
SEPA DNS Final
Shoreline Permit Exempt
Port Angeles/Ediz Hook Boat Launch
22Summary
- Replace remaining 7 Failing Pilings with 8 new
galvanized piles - Estimated Project Cost 145,432
- Grant Request 108,682
- City Match _at_ 25.3 36,750
- Estimated Launches/Year 4,000
- Permits issued/design completed
- Restores capacity (2 docks)
- Project ready to go
Port Angeles/Ediz Hook Boat Launch
23Chinook Salmon Caught off Ediz Hook
24THANK YOU!!! ANY QUESTIONS?
Port Angeles/Ediz Hook Boat Launch