Title: West Yorkshire Local Transport Plan Briefing December 2006


1
West Yorkshire Local Transport Plan Briefing
December 2006
2
Content
  • Introduction and Background Context
  • 2) West Yorkshire Local Transport Plan 2006 to
    2011
  • - Policy, Strategy and the Shared Priorities
  • - Resources
  • - Capital Programme
  • - Performance Management
  • 3) Going Forward and the Wider Picture

3
Introduction
  • Five year transport strategy and investment plan
  • Principal mechanism for obtaining funding from
    the DfT for local transport improvements and
    maintenance
  • Developed in partnership with Metro and the five
    West Yorkshire district authorities
  • LTP2 adopted in March 2006 (2006-2011)
  • Produced in accordance with Government guidance
    and built on successful achievements of LTP1

4
Successful actions during LTP1 (2001-2006)
  • Successful road safety programme
  • Good progress in highway network maintenance
  • Reductions in the backlog of bridges and
    structures maintenance and strengthening
  • Significant improvements to the public realm,
    including enhanced pedestrian facilities
  • Delivery of successful off-road cycle routes
  • Good progress on school travel

5
Successful actions continued
  • Step change in bus facilities on core routes,
    including accessibility improvements and new bus
    lanes
  • Investment in bus and rail stations
  • Launch of the largest real time passenger
    information system in the country covering South
    and West Yorkshire
  • Improvements to accessibility through new
    MetroConnect services

6
Key transport impacts of LTP1
  • Traffic growth constrained
  • Road safety improved
  • Better road conditions
  • Profile of transport raised at sub-regional and
    regional levels
  • Role of rail into urban centres increased for
    commuters and shoppers
  • Role of bus increased on some urban routes
  • Social inclusion improved

7
LTP1 Resources
  • 138.5million allocated to West Yorkshire for
    integrated transport improvements which included
    29.5million for Leeds
  • 149million allocated to West Yorkshire for
    maintenance work which included 48million for
    Leeds
  • Capital also spent on transport/highway
    infrastructure from capital receipts or
    prudential borrowing
  • Further funding provided from the DfT for
    advanced works for Supertram, IRR Stage 7 and ELLR

8
Differences between LTP1 and LTP2
  • Centrally agreed shared priorities for LTP2s
  • Resource assumptions
  • Bonus funding
  • Targets
  • PSA target for congestion
  • Local Area Agreements
  • SEA

9
LTP2 - Policy, strategy and the shared priorities
  • Prepared in accordance with Government guidance
    and informed by wide ranging consultation
  • Structured around the nationally agreed shared
    priorities for transport
  • Accessibility
  • Congestion
  • Road Safety
  • Air Quality
  • Plus
  • Asset Management
  • Quality of Life

10
Accessibility - Context
  • Social Exclusion Unit Report (2003) Making the
    Connections
  • Access to key services
  • Health / Education / Work / Food
  • Reasonable access
  • Cost / Time / Distance / Safe

11
Accessibility Planning - Strategy
  • Local accessibility assessments
  • Public transport accessibility mapping
  • Discussions with partners
  • Consultation with user/interest groups
  • Issue identification
  • Accessibility Strategy and Action Plan

12
Congestion - Context
  • A top priority from the public consultation
  • GPS data used to identify congestion hotspots
  • Causes and impacts of congestion have been
    analysed to inform strategy
  • development

13
Congestion - Strategy
  • Strategies to address congestion consist of
    measures to
  • Encourage smarter travel choices
  • Manage the demand for travel
  • Improve the highway network
  • Make the best use of existing capacity
  • Promote sustainable land use planning

14
Safer Roads - Context
  • West Yorkshire on track to meet national road
    safety targets for 2010
  • Challenge to maintain this level of improvement
  • Motorcycling casualties are cause for concern
  • Analysis of the causes of casualties and
    casualties by area are carried out to inform
    strategy and scheme development

15
Safer Roads - Strategy
  • Strategies to address road safety consist of
  • physical measures to improve local safety
  • enforcement measures
  • education, training and publicity initiatives

16
Air Quality and Vehicle Emissions - Context
  • Environmental impacts can include
  • - poor air quality
  • - noise pollution
  • - climate change
  • UK transport sector accounts for 24 of UK CO2
  • - major consideration for future policy
  • 7 traffic related AQMAs in Leeds plus 7 AOC
  • Problems exacerbated by road congestion

17
Air Quality and Vehicle Emissions - Strategy
  • Strategies to improve air quality, reduce
    emissions and mitigate and adapt to climate
    change include
  • measures which address congestion
  • maintenance/asset management techniques

18
Asset Management and Maintenance - Context
  • Vital to delivering all of the shared priorities
  • Management and maintenance of the road surface
    and transport infrastructure within the boundary
    of the highway
  • Highway network no longer deteriorating
    principal roads showing an improvement in
    condition
  • Transport Asset Management Plans being developed

19
Asset Management and Maintenance - Strategy
  • The asset management strategy has nine key
    elements which include
  • General maintenance programmes e.g. roads,
    footways, lighting, winter maintenance, bus stops
    etc
  • Highways structures strengthening/maintenance
  • Operation/maintenance of UTMC and CCTV systems

20
LTP2 resources
  • Revised funding arrangements
  • - Minor schemes, indicative 5 year figures
  • - Major schemes, regional prioritisation
  • West Yorkshire capital expenditure settlement for
    2006/07
  • Integrated Transport block, 28.491m
  • - 5.871 for Leeds
  • - includes 5 bonus for 2004/05 LTP delivery
  • - indicative figures rising to 34m by 2010/11
  • Maintenance, 33.310m for cways and bridges
  • - 10.346 for Leeds (inc 1.7 for PRN structs)
  • - indicative figure for 2010/11 10.2m ( PRN)

21
LTP2 Integrated Transport plan
Expenditure estimates for Key areas,
2006-11- Bus infrastructure (stops etc) 4.1
m Bus priority measures 12.1m Cycling 2
m Public transport interchange 1.3m Local
safety schemes 2.9m Road crossings (inc
refurbs) 2.6m Local road schemes 1.7m Traf
fic mgmnt. (UTC area safety) 3.6m Walking
(and access) schemes 2.3m
22
LTP2 Major schemes
  • Inner Ring Road Stage 7 - 50million scheme
    commenced May 2006
  • East Leeds Link Road - 32.5million scheme
    commenced November 2006
  • A65 Kirkstall Road Quality Bus Corridor
    20.7million scheme - programme entry granted
    July 2006


23
Performance Management
  • Four elements
  • Financial Management
  • Scheme Monitoring
  • Progress towards targets
  • Policy Review

24
Targets
  • 27 targets
  • 14 mandatory and 13 local
  • Address the shared priorities
  • Most are West Yorkshire wide targets
  • Have to set a target for 2010/11 and
    trajectories/milestones for intervening periods

25
Mandatory targets
  • Common to all LTPs - DfT set minimum standard
  • Main areas
  • Accessibility
  • Bus patronage, punctuality and satisfaction
  • Safety (overall and child KSIs)
  • Congestion journey times also PSA target -
    traffic flows to main urban areas
  • Mode share for journeys to school
  • Air Quality NO2 in AQMAs
  • Overall cycling levels
  • Highway footway maintenance

26
Local targets
  • Set to address our priorities
  • Satisfaction with new LTP funded PT facilities
  • Peak period cycle trips to Leeds, Wakefield
    Halifax
  • AM peak period modal split
  • Peak period rail patronage to Leeds
  • Additional safety targets (pedestrian KSIs)
  • Additional Air quality targets (network wide NOx
    and CO2)
  • Asset management targets carriageways,
    structures and bus shelters

27
Monitoring
  • 46 Key and Background Indicators
  • Use specific data collection exercises (mode
    split), data from other sources (BVPI) and
    national statistics
  • Annual Monitoring Report produced
  • Also scheme monitoring to evaluate effectiveness
    of measures

28
Example Congestion Monitoring
  • Indicator Journey time per person mile on key
    routes
  • Traffic flow data from ATCs
  • Car speeds from iTIS
  • Bus speeds from surveys (AVL data?)
  • Bus and car occupancy surveys

29
Reporting
  • Required to report on mandatory targets annually
    showing progress against milestones
  • Targets to be stretched if trends suggest it will
    be achieved before 2010/11
  • Progress will be considered by DfT when assigning
    resources

30
Environmental Management
  • WY Transport Emissions Group established
  • Need to liaise with partners i.e. Highways
    Agency, bus operators etc
  • Looking to include environmental considerations
    on design briefs and in-house EIA screening tool
    being developed
  • More consideration needed to
  • - noise impacts
  • local air quality
  • CO2 emissions?

31
Going Forward
  • Post Supertram solutions
  • Short term strategy needs to deliver quick wins
    and build public and business confidence
  • - Strategic bus park and ride sites
  • - Targeted bus priority measures and whole
    route improvements
  • - Links into regeneration areas, e.g. AVL
  • - Improving the rail network
  • - Bus Rapid Transit (BRT)
  • City centre strategy
  • - Parking strategy
  • - Road network developments
  • - Public transport gateways

32
Key workstreams
  • City centre transport strategy to address
  • Access and development issues
  • South Leeds roads strategy
  • Holbeck urban village
  • Beeston and Holbeck
  • Strategy support for regeneration areas for
  • Renaissance Leeds
  • Aire Valley Leeds
  • EASEL
  • West Leeds Gateway
  • A6120 route strategy development
  • Airport access

33
Leeds City Region Transport Vision
  • As part of City Region Development Plan sets out
    longer term vision for the transport network
  • Connecting the core centres in West Yorkshire and
    the wider Leeds City Region
  • Wider connectivity to
  • - Neighbouring City Regions
  • - London
  • - International gateways (i.e. airports
    ports)
  • Provides an investment plan and bid

34
Summing up
  • New LTP provides 5 year strategic programme
  • Vision for transport to serve the whole city
  • Remaining key issues relate to major projects
  • Post Supertram strategy
  • Rail and bus investment
  • Major highway priorities
  • Funding and resources
  • - LTP
  • - Regional Transport Allocation
  • - Transport Innovation Fund

35
Questions and discussion http//www.wyltp.com/