Title: AB-LTC Technical Review


1
AB-LTC Technical Review
Extraction Protection Elements, TCDS, TCDQ. Wim
Weterings Contributions from Brennan
Goddard Marta Sans Merce Benoit Riffaud Marcel Gyr
2
Outline
Introduction TCDS TCDQ Concept Technical
Solutions Planning Status Conclusion
3
Introduction
TCDS Fixed diluter block to protect the MSD
Septa in the event of an asynchronous firing of
the MKD kickers.
TCDQ - Mobile diluter block to protect Q4
magnets in the event of an asynchronous firing of
MKD kickers.- Protects the arc at 450GeV and the
triplet apertures at 7TeV from small impact
parameters bunches.
4
(Some) Design Parameters
  • TCDS - Dilute about 6.1 MJ of energy, 1.7 of
    the energy contained in the LHC beam at 7 TeV.
  • TCDS - Max. 300C in MSD vacuum chamber and max.
    100C in the MSD Yoke.
  • TCDS - Aperture for circulating beam (n1 6.5)
  • TCDQ - Max. energy deposition in Q4 of 100 J/g.
  • TCDQ movement 15 mm (10s at 7 TeV and 450 GeV)
    with precision of 0.25mm (0.5 s at 7 TeV).
  • Nominal vacuum pressure of lt10-8 Pa.
  • Assure a low transverse machine impedance.
  • Limit radiation exposure of personnel.

5
TCDS Concept
Functional Specification LHC-TCDS-ES-0001 (EDMS
393973)
0.5m Ti 4.5 g/cm3
1m AlN 3.31g/cm3
1.5m Graphite 1.77 g/cm3
2m Carbon Composite 1.4 g/cm3
1m Graphite 1.77 g/cm3
6
TCDS Technical Solution
MSD
  • Two 3 meter long vacuum tanks Ø250mm.
  • Two sublimators and two 400 l/s ion pumps/tank.
  • 500 mm for interconnection.
  • Independent supports with 3 point alignment.

7
TCDS Technical Solution
Absorber Blocks
CirculatingBeam
ExtractedBeam
8
TCDS Planning
9
TCDQ Concept
Functional Specification LHC-TCDQ-ES-0001 (EDMS
01/2004)
  • Initial MARS simulations resulted in a 10m C 1m
    Fe structure. (N. Mokov et al., Fermilab,
    FN-0724)
  • Iterations in FLUKA are ongoing with Q4
    implemented in geometry. (M. Sans Merce AB/ATB)
  • Preliminary results favour a TCDS-Type, but
    longer, structure.

10
TCDQ Technical Solution
Absorber Block
TCDQ
TCDS
Motorisationsystem
CirculatingBeam
11
TCDQ Planning
12
Status Conclusion
  • TCDS Functional Specification approved, TCDQ
    Functional Specification to be approved 01/2004.
  • One full time designer is working on the project,
    with an additional designer starting 01/2004.
  • Assembly and construction options (in-house vs
    outsourced) presently being studied in the light
    of group reçourses and priorities.
  • Advancement is still according to work unit
    planning, TCDQ schedule tight but still feasible
    (no room for delays).

13
Status Conclusion
  • No problems anticipated for the CtC.
  • No problems anticipated to reach the design
    parameters.
  • EDMS / Hardware baseline documentation minor, but
    present.
  • Integration studies in collaboration with ICL
    have started.
  • Installation issues have not yet been looked at.