19.1.2006, GSI DarmstadtMartin Winkler, GSI - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

19.1.2006, GSI DarmstadtMartin Winkler, GSI

Description:

Participants: Comenius University, Bratislava (leading) GSI, Darmstadt ... Design and production of a prototyp of a proportional beam. chamber BC with delay line ... – PowerPoint PPT presentation

Number of Views:30
Avg rating:3.0/5.0
Slides: 7
Provided by: martinw8
Category:

less

Transcript and Presenter's Notes

Title: 19.1.2006, GSI DarmstadtMartin Winkler, GSI


1
DIRACsecondary Beams
Annual report on Large-area beam tracking
detectors for fast extracted beams Task 8
NUSTAR 3


Participants Comenius University, Bratislava
(leading) GSI, Darmstadt Task leader
Brano Sitar (CUB)
2
Main activities and results of NUSTAR 3 in 2005
  • Design, production and testing of a low
    pressure gas system
  • Design and production of a prototyp of a
    proportional beam
  • chamber BC with delay line
  • Design and production of new electronics for
    the BC chambers
  • In time with Implementation plan of Task 8 -
    NUSTAR 3

3
Low pressure gas system
  • Gas system was built and tested (at the FRS)
  • Tests showed high precision and reliability

Front panel of the control system
Scheme of low pressure gas system
4
New generation of a Time Proportional Chamber
(TPC) for ion tracking
  • TPC with new designed C-pad read out was designed
  • New TPC is providing two point on the track in
    each dimension
  • High precision integrated delay lines were used

TPC Field cage with 12 x 24 cm sensitive area
Calibration tool for TPC
TPC View
5
BC for Beam Pofile Measurement
  • Multiwire Proportional (Ionization) Chamber
  • Low pressure 0 1 bar
  • Low amount of material
  • in the beam area
  • Delay line read-out

Beam chamber on the test stand
6
New integrated electronics for TPC and BC chambers
  • New integrated electronics was designed and
    produced
  • New electronics for readout of 128 channels of BC
    chambers was obtained

Integrated electronic module
Readout for 128 channels of the BC chambers
Test bench for delay lines
7
Work Plan and Financial Status
  • Personal spent CUB 20 MM out of 90 MM
    (no EU request)
  • GSI 4
    MM out of 6 MM (no EU request)
  • Capital investment CUB 10 k out of 66 k
  • GSI no contribution, no EU request
  • 1 coordination meeting
  • In time with Implementation plan of Task 8 -
    NUSTAR 3
  • Delivery and Test Experiment with BC prototype
    in 2006 foreseen
Write a Comment
User Comments (0)
About PowerShow.com