1
Monthly Status Report Report due 2/25/01 Schedule
statused as of Feb. 16, 2001
2
Project Status Summary
  • Technical
  • Dec Jan Feb

Programmatic Dec Jan Feb
Schedule Dec Jan Feb
Resources Dec Jan Feb
Detailed Description (for items identified as
yellow or red)
  • We received the ELS parts back from MSSL / Walton
    Plating and completed assembly of the flight
    unit. The unit was then vibrated and cycled in
    thermal vac. The unit just completed
    characterization testing and has only one
    remaining task, measurement of mass properties.
  • We are nearing completion of the Acceptance Data
    Package and will be ready for the Pre-Ship Review
    scheduled for March 1.
  • DD250s have been submitted to the NMO for both
    the IMA delivery and the upcoming ELS delivery.
  • Latest project photos and videos are available on
    Aspera-3 web site.

3
Problem and Concern Summary
PProblem CConcern RResolved
4
Accomplishments of the Last Month -ELS
  • We received the flight blackened parts from MSSL
    / Walton Plating. The parts looked very good.
    We inspected them and decided to use all of the
    parts from the latest batch. The parts were then
    vacuum baked out prior to assembly.
  • The flight unit was assembled for flight and then
    vibrated to protoflight levels.
  • Following vibration, a limited functional test
    was performed and the unit was then thermal
    vacuum cycled. Hot and cold starts were
    performed. The unit was left powered on after
    the cold start throughout the temperature
    transitions and plateaus. High voltage was set
    to the maximum level. Everything looked good.
  • The unit was then removed from the thermal
    chamber and installed into the characterization
    chamber where the high voltage test was re-run
    followed by the full characterization test. We
    have completed the testing and are currently
    analyzing the data.
  • The flight spare was reassembled and installed
    into the characterization chamber. High voltage
    testing was run prior to needing the GSE for the
    flight unit TVAC test.
  • This week, the flight spare was reinstalled back
    into the characterization chamber (it was removed
    to perform characterization of the flight unit)
    for its final testing. This will be complete by
    Feb. 27.

5
Accomplishments of the Last Month - IMA
  • The DD250 for delivery of the IMA hardware was
    resubmitted to NMO based on several discussions.
    We are awaiting return copies.

6
Accomplishments of the Last Month - Data
Reduction Software
  • Worked on APAF Software Requirements
    Specification (SRS)
  • Draft to be released by the end of February, 2001
  • APAF Software Requirements Review to be Held at
    Next ASPERA-3 Team Meeting in Kiruna, Sweden
    (March 6-7, 2001)
  • Continued Packet Definitions for ELS
  • Done all we can for now. We're waiting on the
    flight software personnel at FMI (Finnish
    Meteorological Institute) for feedback.
  • Continued Providing Technical Assistance for EPO
    Web Information
  • Continued Defining and Implementing IDFS Web
    Tools
  • Held monthly ASPERA-3 Software Status Meeting
    (February 23, 2001)

7
Planned Activities for the Next Month - ELS
  • Measure mass properties of the flight unit.
  • Finalize characterization testing of the flight
    spare.
  • Hold ELS Pre-ship Review
  • Deliver ELS flight unit to IRF.
  • Attend ASPERA-3 team meeting.

8
Planned Activities for the Next Month - IMA
  • None.

9
Planned Activities for the Next Month - Data
Reduction Software Tasks
  • Attend ASPERA-3 Team Meeting March 6-7 in Kiruna,
    Sweden
  • Conduct APAF Software Requirements Review (at
    ASPERA-3 Team Meeting)
  • Continue Working on APAF Software Requirements
    Specification (SRS)
  • Continue Packet Definitions for ELS as Needed
  • Begin Packet Definitions for NPI
  • Continue Providing Technical Assistance for EPO
    Web Information
  • Continue Defining and Implementing IDFS Web Tools

10
Problem and Concern Status
  • None at this time.

11
Schedule Summary
  • ELS Everything is on track for on-time delivery
    of the flight unit to IRF. The remaining
    activities are to measure the mass prosperities
    of the unit, hold the Pre-Ship Review and hand
    deliver the unit to IRF.
  • Software Some software activities have been
    delayed due to hardware activities. The overall
    delivery of the software to support mission
    operations however continues to be on schedule.
  • The full-up schedule is available on the ASPERA-3
    Web site.

12
ASPERA-3 PHASE B/C/D MASTER SCHEDULE