LHC IRQ Interconnect Engineering Design Review January 29, 2002 T' Page Fermilab - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

LHC IRQ Interconnect Engineering Design Review January 29, 2002 T' Page Fermilab

Description:

US LHC ACCELERATOR PROJECT. LHC IRQ Interconnect EDR. January ... Hx inner corrugated pipe flange. brookhaven - fermilab - berkeley. US LHC ACCELERATOR PROJECT ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 29
Provided by: thomas446
Category:

less

Transcript and Presenter's Notes

Title: LHC IRQ Interconnect Engineering Design Review January 29, 2002 T' Page Fermilab


1
LHC IRQ Interconnect Engineering Design
ReviewJanuary 29, 2002T. Page - Fermilab
2
Topics
  • Interconnect Kit
  • Automatic Welding Clearances
  • Shield Line Bellows Pressure Test

3
Interconnects
4
IC Q1-Q2
5
IC Q2-Q3
6
Interconnect Kit
  • Absorber (T.Nicol).
  • Pipes with integrated bellows.
  • Pipe supports.
  • Bellows protectors.
  • Weld rings.
  • Shield bridge.
  • MLI blanket.
  • Outer vacuum sleeve.

7
Interconnect pipe with integrated bellows
8
Hx Outer Bellows
  • Added Hx Outer Bellows

9
Helium Pipe Layout
10
Pipe Supports
11
Bellows Protector
12
Interconnect - Welded Joint
13
Shield Bridge IC Q1-Q2
14
Shield Bridge
Fixed End
Free End
15
Shield Bridge
16
Outer Vacuum Sleeve
CERN Bellows LHCQBB_A0030
17
Vacuum Vessel Bellows
  • IC Q1-Q2 and IC Q2-Q3 will use the CERN Bellows.
  • Drawing No. LHCQBB_A0030
  • Bellows length 1130 mm
  • A special bellows is needed for the Q3 to Feedbox
    Interconnect.
  • Interconnect Length 510 mm
  • Bellows Length 540 mm
  • Modify CERN Bellows

18
  • Weld Clearances

19
Automatic Welding Clearances
  • (2) Locations where automatic welder will be
    difficult.
  • Cold mass pipe flanges around BPM.
  • Hx inner corrugated pipe flange.

20
Automatic Welding Clearances - BPM
21
Automatic Welding Clearances - BPM
22
Automatic Welding Clearances Hx Inner
23
Automatic Welding Clearances Hx Inner
24
Shield Line Pressure Test
  • Full Scale Test
  • Bellows Internal Sleeves
  • Test Pressure 400 psi (hydrostatic)

25
Shield Line Bellows Cross Section
26
Test Setup
27
Test Pressure
28
Bellows Squirm