Cable Testing - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Cable Testing

Description:

... D. Krumbhorn, M. Kweon, K. Oyama, D. Sakata, M. Sano, K. Watanabe S. Zimmer, ... LV h/w interlock: Svenja Wulff, Jochen Klein, Ken Oyama, Stefan Zimmer ... – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 11
Provided by: kai123
Category:
Tags: cable | testing | zimmer

less

Transcript and Presenter's Notes

Title: Cable Testing


1
Cable Testing
Low Voltage C. Haltebourg, D. Krumbhorn, M.
Kweon, K. Oyama, D. Sakata,
M. Sano, K. Watanabe S. Zimmer, High Voltage
Hagen Heermann, Marvin Holten Optical Readout
Fibres Tingting Niu, MinJung Kweon TTC fibres
Ken Oyama Ethernet Clemens Haltebourg, Dirk
Krumbhorn, Minung Kweon PDB cables Clemens
Haltebourg, Dirk Krumbhorn, Minung Kweon Pressure
Sensors Ana Marin LV h/w interlock Svenja
Wulff, Jochen Klein, Ken Oyama, Stefan
Zimmer Grounding SM Minung Kweon, Ken Oyama
2
(No Transcript)
3
(No Transcript)
4
(No Transcript)
5
  • Low Voltage cables
  • - all cables tested and ok (modulo 50cm)
  • BF patch panel- tighten screws (55Nm), 18/18
  • - reroute sense wires, 18/18
  • - mount patch cords, 8/18
  • put protective covers, 8/18
  • To be done
  • check last 50cm of sense wires (inside I/O
    racks, from power supply to Burndy connector)
  • test procedure defined, can fix ourselves

6
HV
  • 36 cables/Redel from I/O racks to BF, tested and
    OK
  • 4 HV patch boxes installed (2 new on I07, 2
    exisiting on O07)
  • 36 new cabels/Redel pulled from CR4 to I/O
    racks, new ISEGs- 44 connectors put and tested
    by company w/ 3kV- all Redel connectors
    delievered/ mounting work in progress

7
Ethernet
  • All connections tested
  • All labels now OK
  • Re-crimpig of some 10 cables done by company
  • Re-check some 10 connections

8
LV h/w interlocks
  • 4 racks connected, commisioning w/ DCS team
    4-Dec-2007
  • 1 more rack (O26) needed for pre-trigger /
    cosmics run
  • 5 remaining racks, cabling by workshop at PI,
    put in Jan-2008

9
TTC Fibres
  • All fibres pulled, identical lengths
  • Box to protected additional fibre length will be
    put by company
  • Check connections to be done

10
Other Cables
  • Optical readout fibres 18/18 OK, 1 plug in
    patch panel and 1 connector were replaced
  • Power distribution box cabeles all checked, 4
    re-crimped, re-check of 4 to be done
  • Pressure sensors 18 cables pulled, to be
    commisioned
  • Grounding 2 (A-side) 2 (C-side) cables per
    SM, pins were welded last week, was re-done
    Dec-03-2007, to be checked