TKR Tower Assembly PRR - PowerPoint PPT Presentation

About This Presentation
Title:

TKR Tower Assembly PRR

Description:

Torque of nuts 5.1 Nm on TWR 4. Torque of nuts 5.3 Nm on TWR 5, spec ... a fluctuation in the Pisa measurement determined the 9 dead channels initially recorded ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 18
Provided by: Erappo3
Category:

less

Transcript and Presenter's Notes

Title: TKR Tower Assembly PRR


1
GLAST LAT Tracker Tower-4/5 Pre-Ship Review
Luca.latronico_at_pi.infn.it INFN-Pisa
2
Tower 4 - Assembly and test highlights
  • Apr. 13-14, 2005 (INFN-Pisa)
  • assembly of complete tray stack
  • incomplete cable set (C0,C1,C3,C5,C7) due to late
    arrival of complete set
  • CPT could not be performed w/o cables C2, C4, C6
    due to a known issue with GTFE reset (see
    NCR/INFN/PI-417)
  • Apr. 18-21, 2005 (INFN-Pisa)
  • Installation of late cables
  • Tray01 (L020) damaged during cable assembly -
    L023 installed in place of L020 (NCR/INFN/PI-470)
  • CPT
  • Sidewalls and alignment
  • Final CPT and ship to Roma
  • Apr. 27, 2005 (Alenia-Roma)
  • VIB test
  • May. 23-27, 2005 (Alenia-Roma)
  • TVAC test with tower 5
  • May 30, 2005 (Roma)
  • Through customs in Roma airport
  • Full EIDP details at
  • http//glast.pi.infn.it (soon available)

3
Tower 4 - Assembly and components details
Tower PN LAT-DS-00722 (rev3) Tower SN 4
4
Tower 4 5 - Configuration
  • Configuration
  • Kapton tape and foam applied on the flex cables
    as per LAT-DS-00722
  • 4 layers of Poron foam 0.037 THK used on Bottom
    and Top Tray (X) side (in place of 5 layers)
  • Base Plate assembly
  • Torque of nuts 5.1 Nm on TWR 4
  • Torque of nuts 5.3 Nm on TWR 5, spec is (5.08
    0.56/-0 Nm) ? higher resonance frequency
    detected at VIBE test

5
Tower 4 5 Alignment, CG MASS
  • Tower 4 and 5 well aligned and inside stayclear
  • Mass and CG near estimated values (when used real
    masses)
  • Data available on INFN-PISA web site

6
Tower 4 Open NCRs
  • INFN/PI-494 Bad channels out of spec
  • with reference to tray NCRs 460,465,464, 463 (all
    closed as per MRB) layers X6, Y5, Y3, Y13 fail
    test TE301 as expected and due to known problems
  • Status of channels was monitored through TVAC
    test and show no significant loss of channels
    (see next slide), the NCR can be closed and
    converted into a SLAC one for reference.
  • INFN/PI-496 Vacuum level out of specification.
  • Common to Tower 5, see following slides.
  • INFN/PI-503 CPT reduction after TVAC
  • Common to Tower 5, see following slides

7
130 disconnected channels overall (less than
0.25). Layer X6 is stable as bad channels are
due to broken PA traces Fluctuations in layers
Y3 (H17-back-MCM 1117) and Y5 (H16-back-MCM 1049)
are due to delaminations in the MCM encapsulant
such MCMs were out of spec (gt20 bad chans)
already at SLAC and their use was authorized by
an MRB for schedule reasons
8
Tower 4 - Efficiency
  • 3 layers with efficiency lt 99 as a consequence
    of missing channels (see previous slide)
  • overall efficiency (pre-ship) at the tower level
    is 99.7 (required 98)

9
Tower 5 - Assembly and test highlights
  • May 5-9, 2005 (INFN-Pisa)
  • assembly (tray stack, cables, sidewalls,
    alignment, turn-over)
  • test (CPT)
  • May. 23-27, 2005 (Alenia-Roma)
  • TVAC test with tower 4
  • VIB test
  • May 30, 2005 (Roma)
  • Through customs in Roma airport
  • Full EIDP details at
  • http//glast.pi.infn.it (soon available)

10
Tower 5 - Assembly and components details
Tower PN LAT-DS-00722 (rev3) Tower SN 5
11
Tower 5 Open NCRs
  • INFN/PI-492 Bad channels out of spec
  • 18 bad channels found in Pisa on X2 (9 dead, 9
    disconnected)
  • 7 dead were known from ladders
  • nb of dead channels was stably 7 during TVAC a
    fluctuation in the Pisa measurement determined
    the 9 dead channels initially recorded
  • Status of channels was monitored through TVAC
    test and show no loss of channels (see next
    slide), the NCR can be closed.
  • INFN/PI-496 Vacuum level out of specification.
  • Common to Tower 4, see following slides.
  • INFN/PI-504 CPT reduction after TVAC
  • Common to Tower 5, see following slides

12
  • 45 disconnected channels overall (0.08).
  • All layers within specs, i.e. nb of bad chans
    lt16, and stable
  • new MCM encapsulant deposition, new MCM-PA gluing
    fixture, new shipping box are working!

13
Tower 5 - Efficiency
  • worst layer is 99.4
  • overall efficiency (pre-ship) is 99.7

14
EGSE/TVAC Communication problems with 2 towers
  • Relevant NCR
  • INFN/PI-474
  • Problem
  • Some instabilities in the EGSE systems for TVAC
    made it impossible to operate towers 1 and 3
    during TVAC test, and the EGSE systems had to be
    operated independently
  • Action taken (as per dispositions)
  • TVAC chamber setup was improved by using separate
    feed-through for EGSE-power lines and chamber
    temperature control
  • GASU cables connecting to the TEMs were shielded
  • Findings
  • TVAC test of towers 4 and 5 was run with 2
    systems in parallel, the NCR can be closed

15
Tower 4 and 5 Vacuum level out of spec
  • Relevant NCR
  • INFN/PI-458, INFN/PI-459
  • Description
  • The vacuum level was mostly outspec during the
    test (specs call for 5E-5 torr)
  • Observations (see annex for details)
  • P 3.15E-5 torr at room T after 90 hours of
    pumping
  • correlation between T-P
  • no improvement after hot soak as observed with
    towers 1 and 3
  • new material (MLI) that did not undergo bake-out
    was introduced for thermal blanket of tower 4 and
    EGSE RF shield
  • The proposed disposition is use as is.

16
CPT reduction for TVAC
  • Reference NCR
  • 503 and 504
  • Description
  • TE101 (leakage current and power consumption
    test) not performed after towers 4 and 5 TVAC
    test
  • Proposed dispositions
  • only perform test TE101 after TVAC is anomalies
    are detected in the tower CPT suite
  • Rationale correct behaviour of tower during and
    after TVAC is assessed by observations of layers
    noise, channels status, CR detection efficiency
  • reduce CR data taking time to 100k events for CPT
    and 50K for LPT
  • Rationale such statistics are enough for
    efficiency measurements and the test time
    reduction allow compressing TVAC in 3 days
  • Submit a document change request with the above
    changes

17
Tower 4 and 5 - Conclusions
  • Both towers well aligned and within stayclear
  • The overall number of disconnected channels is
    very low
  • All the silicon layers (but the bottom tray of
    tower 3) close to 100 efficiency
  • Communication issue during TVAC solved
  • Vacuum level still outspec during TVAC
Write a Comment
User Comments (0)
About PowerShow.com