1
Nick Hegeman
  • Stryker MedicalSummer 2009
  • Lean Intern

2
Introduction
  • Butler UniversityEconomics
  • Purdue School of Engineering and
    TechnologyMechanical Engineering
  • Butler University Goalkeeper

3
Company Overview
  • Stryker Corporation
  • Healthcare Manufacturing
  • 6.7 Billion in Annual Sales
  • Stryker Medical
  • Hospital Beds
  • Hospital Stretchers
  • EMS Equipment

4
Objectives
  • Plant-Wide SMK Visual Board Implementation
  • EMS MX-Pro Line Move
  • 20 Documented Line Improvements

5
SMK Visual Boards
  • Engage and Empower Team
  • 6 Key Metrics
  • Safety
  • Quality
  • Delivery
  • Cost
  • 6S
  • Continuous Improvement

6
Results
7
MX-Pro Line Move
  • Pre-Move State
  • 5 assemblers to make 10 cots
  • Total line area of 2270 square feet
  • Months of inventory on line
  • NO material flow

8
MX-Pro Line Move
  • Line Move Goals
  • Understand team needs
  • Execute necessary changes
  • Transfer knowledge

9
Results
  • Line reduced by 970 square feet
  • Walking reduction over 90
  • Productivity increase over 60
  • NO production interruption

Before
After
10
Line ImprovementsPDCA
  • Engage and Empower Team
  • Document Results
  • Plan
  • Do
  • Check
  • Act
  • Measurable Results

11
Line ImprovementsPDCA
Previous Process
12
Line ImprovementsProcess
  • Issues
  • Ergonomics
  • Efficiency
  • Design Goals
  • Minimize Press Footprint
  • Minimize Cost
  • Fail-Safe Design

13
Line ImprovementsPDCA
  • New Process

14
Results
  • Over 30 PDCAs
  • Over 100 impact points
  • Over 30,000 in inventory reductions
  • Inventory space reduced by over 150 square feet

15
Review
  • Visual Boards
  • Metrics tracking increased from 32 to 98
  • MX-Pro Line Move
  • Exceeded goals without disrupting production
  • Documented Improvements
  • Goal of 20 PDCAs
  • Completed over 30

16