NSF Review - PowerPoint PPT Presentation

About This Presentation
Title:

NSF Review

Description:

The Alert Subsystem. Bryan Butler & Rich Moeser. EVLA M&C, Deployment ... A module subsystem screen the ACU Screen. Screenshot of the Device Browser. Bill Sahr ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 18
Provided by: aoc9
Learn more at: http://www.aoc.nrao.edu
Category:
Tags: nsf | review | subsystem

less

Transcript and Presenter's Notes

Title: NSF Review


1
EVLA Monitor Control
2
Contents
  • Transition System Final System
  • EVLA MC Components
  • Carryover from Transition System to Final System
  • Architecture Data Flows Transition Final
    System
  • Selected Subsystems
  • The Alert Subsystem
  • Correlator Backend, Fast Formatter, TelCal,
    Post-Processing
  • User Interfaces Screen Shots

3
EVLA Data Flow - Overview
4
Transition System vs. Final System
  • In broad terms, there will be two major versions
    of the EVLA Monitor Control System a
    Transition System and a Final System
  • The Transition System bridges the gap between the
    old Modcomp-based VLA Control System and the
    final version of the EVLA Monitor Control
    System, while maintaining operational
    capabilities
  • The Transition System will be responsible for
    controlling a wide array of old and new hardware
    EVLA Antennas, VLA Antennas, the VLA
    Correlator, and the prototype WIDAR correlator
  • The Transition System will incrementally shift
    its software architecture toward the desired
    architecture of the final system

5
Selected Transition System Milestones
  • Support for EVLA antenna hardware development
  • Use of EVLA Antennas in scientific observations
  • Monitor and control of EVLA antennas
  • Retirement of the Modcomp-based VLA control
    system
  • Monitor and control of VLA antennas (nearly done)
  • Monitor and control of VLA correlator
  • Distribution of VLA correlator output within EVLA
    MC
  • Formation writing of VLA format archive records
  • Support WIDAR prototype correlator
  • Implement target architecture of final system

6
Retirement of the Modcomp-based VLA control system
  • Monitor and control of VLA antennas end of Q2
    2006
  • Monitor and control of VLA correlator Q4 2006
  • Distribution of VLA correlator output Q4 2006
  • Formation writing of VLA format archive records
    Q1 2007
  • Parallel operation testing Q2 2007

7
Current State of the Transition System
8
Transition vs. Final SystemComponents Carryover
9
EVLA MC Transition System Data Flows Status
10
EVLA MC Final System Data Flows
11
The Alert Subsystem
Bryan Butler Rich Moeser
12
EVLA MC, Deployment
13
Screenshot of the Array Operators Screen
14
A module subsystem screen the ACU Screen
15
Screenshot of the Device Browser
16
Latest software releases
  • Stable builds web page

http//www.aoc.nrao.edu/asg-internal/jnlp/
17
Backup Slides
  • Fast Formattter, TelCal, Post-Processing

18
EVLA MC Final System Data Flows
19
Fast Formatter, TelCal, Post-Processing Worst
Case Scenario
Write a Comment
User Comments (0)
About PowerShow.com