David Miller, PE, F'ASCE - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

David Miller, PE, F'ASCE

Description:

Background the API ECS ad hoc Reorganization Team recommended ... equipment standards on oilfield engines, sucker rods, pumping units and related equipment ... – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 10
Provided by: ameri77
Category:
Tags: asce | david | miller | sucker

less

Transcript and Presenter's Notes

Title: David Miller, PE, F'ASCE


1
API ECS Reorganization Update
  • David Miller, PE, F.ASCE
  • Director, Standards

2
API ECS Reorganization Update
  • Presentation will cover
  • ECS Reorganization Efforts
  • Administrative Changes to API S1

3
API ECS Reorganization Update
  • Background the API ECS ad hoc Reorganization
    Team recommended the ECS take the following
    actions
  • Overhaul/disband SC16, Drilling Well Control
    Equipment and work to increase SC8 participation
  • Form an API Well Control Standards Oversight
    Group
  • Expand the Scope of SC19
  • Identify Contractors to maintain the Tank
    Standards
  • Identify Contractors to maintain the Mooring
    Hardware Standards
  • The ECS approved these recommendations and
    implementation is underway

4
API ECS Reorganization Update
  • Status
  • Overhaul/disband SC16, Drilling Well Control
    Equipment and work to increase SC8 participation
  • Work is underway to investigate the possibility
    of repopulating SC16 to manage the drilling well
    control equipment standards
  • Two workgroups are in place to finish work on
    updates to Spec 16C, Choke Kill Systems and new
    RP 16ST, Recommended Practice for Coiled Tubing
    Well Control Equipment Systems and Operations
  • ECS members are tasked with helping to resource
    SC8

5
API ECS Reorganization Update
  • Status
  • Form an API Well Control Standards Oversight
    Group
  • Oversight group would consist of 3 - 5 members
    with operator and drilling contractor
    representatives.
  • Oversight Group would report to both the ECS and
    EC on Drilling and Production Operations
  • Work would be completed by AHGs, made up of
    volunteers from Drilling Well Control Resource
    Group, including former SC16 members
  • Scoping meeting held with IADC and ECDPO
    representatives May 2008 - IADC canvassing
    members for interest in survey participation on
    drilling well control equipment standards

6
API ECS Reorganization Update
  • Status
  • Expand the Scope of SC19, Completion Equipment
  • API 14A, 14B and 14L transferred from SC6
  • API 11D1 and 11V series transferred from SC11
  • SC19 now responsible for sand control screen and
    barrier valve standards
  • SC 19 Core Group now made up of 7 groups
  • Gaslift, Production Packer, Accessory Equipment
  • Barrier Valve, Perforators, Sand Control Screens
  • Subsurface Safety Valves Subsurface Flow
    Controls
  • Emphasis is on greater coordination with
    ISO/TC67/SC4/WG4, Production Equipment, via
    bi-annual joint meetings

7
API ECS Reorganization Update
  • Status
  • Identify Contractors to maintain the Tank
    Standards
  • SC11 is working to update the 12 series
    standards, and once complete the entire suite
    will be transferred to API Committee on Refinery
    Equipments Subcommittee on Aboveground Storage
    Tanks
  • SC11 is now properly resourced to handle
    remaining field operating equipment standards on
    oilfield engines, sucker rods, pumping units and
    related equipment
  • Identify Contractors to maintain the Mooring
    Hardware Standards
  • Contractors identified and work proposed for 2009
    budget

8
API ECS Reorganization Update
  • Administrative Changes to API S1 - changes
    address the following topics and align S1 with
    API Policy and CRE COPM Policy and Practices
  • ECS membership now tied directly to API member
    company and organization representation, with SC
    chairs as non-voting members
  • Policy 501 Compliance
  • Company Representation
  • Sarbanes Oxley Compliance
  • ECS SC sponsor positions
  • Encourage active participation
  • SC membership review
  • Roundtable Discussions
  • Encourage technical exchange
  • Awards
  • Changes effective July 1

9
API ECS Reorganization Update
  • Thank you!
  • David Miller, PE, F.ASCE
  • Director, Standards
Write a Comment
User Comments (0)
About PowerShow.com