Title: Facility Consolidation


1
Facility Consolidation
  • Proposal
  • IEM 5121
  • July 21, 2003

Robert Volk
2
PROPOSAL DESCRIPTION
  • Describes the problem statement, measures of the
    problem, project objectives and deliverables, as
    well as the project approach and schedule.
  • Listing of MSETM knowledge and tools that will be
    applied in the course of executing the proposed
    project.

3
AGENDA
  • Proposal Goals
  • Proposal
  • Problem Statement
  • Measures
  • Objectives
  • Deliverables
  • Alternatives
  • Project Approach
  • Project Plan
  • MSETM Tools

4
PROPOSAL GOALS
  • To give a clear understanding of the project and
    the opportunity that exists.
  • Green light to proceed with project.

5
PROPOSAL
  • To consolidate the Trane Macon Commercial Self
    Contained (CSC) and Compressor Products (CP)
    buildings into one building.
  • This consolidated facility would house all
    product assembly lines (currently one in CSC and
    one in CP), all sub-assembly lines, and the
    material warehouse space that is currently being
    occupied in both buildings.

6
PROBLEM STATEMENT
  • Products are being manufactured in two separate
    buildinigs using similar processes and equipment.
  • Two separate materials warehouses
  • 2x the space
  • Higher annual operating cost per sq. ft in the
    CSC building
  • CSC 8.33 / sq. ft
  • CP 3.52 / sq. ft

7
MEASURES
  • Successful implementation of this project will
    result in the following improvements
  • 11 reduction in production area for the
    business
  • Productivity Improvement in the hours per unit
    for each product line.
  • CSC 147 hours per unit baseline
  • CP 110 hours per unit baseline

8
MEASURES
  • Benefits
  • Elimination of CSC Building Annual Lease
    220,500
  • Elimination of CSC Building Taxes and Insurance
    49,500
  • Elimination of CSC Building Variable Costs
    80,000
  • Elimination of Inter-Building Trucking 123,000
  • Production Technician Reduction (15) 525,000
  • Material Warehouse Technician Reduction (4)
    140,000
  • Production Leader Reduction (1) 50,000
  • Manufacturing Engineer Reduction (1) 75,000
  • Maintenance Technician Reduction (2) 70,000
  • Total Benefits 1,333,000
  • Costs
  • Production Line Move 175,000
  • Facility Upgrades 598,000
  • New Equipment 205,000
  • Total Manpower Resource 150,000
  • Total Costs 1,128,000

Benefit/Cost Ratio 1,333,000/1,128,000
1.18 gt 1.0, Project is attractive
9
OBJECTIVES
  • Consolidate the CP and CSC Buildings into one
    building
  • Maximize the utilization of floor space.
  • Standardize similar processes and promote best
    practices.
  • Determine the most cost effective manner of
    handling the Lease Agreement of the CSC building.
    (Note A need for warehousing space has been
    identified in the American Standard organization.
    In addition, a current vendor has shown interest
    in occupying the space. The confidence level is
    extremely high that one or both of these
    scenarios will occur. The lease will be removed
    or offset in the Trane Macon financials)
  • Reduction of Manpower and Support requirements
    for the Production, Materials, and Operations
    departments.
  • 20 Production Technicians
  • 20 Materials Technicians
  • 33 Operations Management
  • 25 Manufacturing Engineering
  • 33 Maintenance Technicians
  • Create the Building Strategy of the CP.

10
DELIVERABLES
  • Building Strategy.
  • Improvement results of the consolidation.
  • Financial Analysis justification.
  • Marketing Plan that will convey the benefits of
    this project to our customers and how we will be
    better positioned to meet their requirements.
  • Control Plan for maintaining the integrity of the
    changes from the project after the initial
    implementation.

11
ALTERNATIVES
  • No Production or Materials Warehouse Redesign -
    Lift and Place current CSC line and materials
    warehouse into CP
  • Materials Warehouse Consolidation Only -
    Production line design to remain the same
  • Production Line and Materials Warehouse
    Consolidation and Redesign

12
PROJECT APPROACH
  • Project Champions
  • Plant Manager
  • Six Sigma Methodology
  • DMAIC
  • Alternative Selection through the use of a
    ranking matrix using the following criteria for
    selection
  • Compliance to customer requirements.
  • Reduction in resources.
  • Benefit-Cost Ratio.
  • Resources required for implementation.

13
PROJECT PLAN
  • Milestones
  • Proposal/Define Phase July 22, 2003
  • Measure Phase, Facility Upgrades to start July
    25, 2003
  • Analyze Phase to start September 2, 2003
  • Improvement Phase to start September 22, 2003
  • Control Phase to start October 20, 2003
  • Project Completion November 14, 2003
  • Capstone Project Completed December 5, 2003

14
PROJECT RISKS
  • Red Light - Team Resources
  • Red Light - Lack of available for Project
    Costs

15
SUMMARY
  • Drivers
  • Productivity
  • Elimination of unused floor space
  • Cost Reduction
  • Consistent use of MSETM tools throughout the
    course of the project
  • Objectives
  • Manpower Reduction
  • Maximized space utilization
  • Building Strategy
  • Six Sigma
  • Meeting Customer Needs
  • Schedule
  • Start Project July 2003
  • Complete Project November 2003
  • Results
  • 1,333,000 annualized Cost Savings
  • Consolidated building housing both product
    lines, sub-assys and materials warehouses
  • Productivity - Hours per unit reduced
  • Process excellence through the standardizing of
    best practices

16
MSETM TOOLS
  • Finance and Advanced Capital Investment Analysis
  • Marketing Management
  • Management of Technology and Innovation
  • Performance Management
  • Planning and Managing Technology Implementation

17
QUESTIONS
?