WestEast Road Corridor in Latvia E22 Entrance to Riga - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

WestEast Road Corridor in Latvia E22 Entrance to Riga

Description:

Trans-European Transport Network(TEN-T) and Trans-national axis ... Project finale; Working with the results obtained from project feasibility study. 11/10/09 ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 17
Provided by: Ani552
Category:

less

Transcript and Presenter's Notes

Title: WestEast Road Corridor in Latvia E22 Entrance to Riga


1
West-East Road Corridor in LatviaE22 Entrance to
Riga
  • Gundars Kains
  • SJSC LATVIAN STATE ROADS

XXVII International Baltic Road Conference August
24-26, 2009
2
Content
  • Trans-European Transport Network(TEN-T) and
    Trans-national axis
  • TEN-T West- East road corridor in Latvia
  • E22 road Entrance to Riga
  • Implementation issue
  • Development phases
  • Final stage
  • Future development of TEN-T West-East road
    corridor

3
E-road Network in Latvia
4
Trans-European Transport Network (TEN-T) and
Trans-national Axis
5
West-East Development Stage
6
E 22 Entrance to Riga
  • Aim of recearch project
  • Technical feasibility of alternative solutions
  • Organisation of Environmental Impact Assessment
    (EIA) process.
  • Work with stakeholders.
  • Faced problems.

7
  • Project Investigation Area

8
(No Transcript)
9
Problems and solutions arising during public
hearing concerning Environmental Impact Analysis
in Latvia
10
From Project Developer Viewpoint
  • Superficial acquaintance of designers and
    presenters with project main solutions and
    targets
  • Foreign experts get to know the local situation
    in the working process in cases when local
    specialists are not involved
  • Poorly detailed information during public hearing
    process.

11
From Residents Viewpoint
  • Unwillingness to change daily habits and their
    environment ( Not In My Back Yard)
  • Awareness of immunity of their properties.

12
From Local Municipality Viewpoint
  • Grounded and ungrounded requirements to designers
    which sometimes result in cost increase and
    prevent further feasibility studies
  • Inability to make final decision or refusal of
    alternative route options.

13
Road E22 East Entrance in Riga Feasibility Stage
of Project Completion
  • Project aim
  • Project introduction
  • Project finale
  • Working with the results obtained from project
    feasibility study.

14
West-East Development Next Stages
  • Kadu karti par koridora talako attistibu.
  • Varbut to pau Inaras karti, tikai atzimet
    koknese plavinas un jurmala priedaine posmus.

15
Summary
  • Joint EU strategic interests coincide with
    Latvia's economic interests.
  • The development of international roads improves
    the overall quality of the Latvian road network
    and driving safety.
  • Latvia as EU member state during the crisis is
    likely to attract significant funding for
    infrastructure development.
  • International road network development gives a
    lot of experience for Latvian road network
    developers.

16
  • Thank you!