Title: THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER IN THE REPUBLIC OF TAJIKISTAN ASSISTED BY JI
1THE JICA STUDY ON NATURAL DISASTER PREVENTION IN
PYANJ RIVER in Cooperation with Ministry of
Emergency Situations and Civil Defense of the
Republic of Tajikistan
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
2Flooding Area in June-July, 2005
JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
Moskvasky,Hamadoni
- More than 10,000 people evacuated 4,000 ha
affected
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
3STUDY OBJECTIVES
JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
- 1. Formulate a master plan for flood disaster
prevention in the Study area, which includes a
flood control plan, a flood fighting plan and a
flood forecasting , warning and evacuation plan - 2. Implement a pilot project to evaluate validity
of river training in the Study area. - 3. Implement the feasibility study for the
short-term plan. - 4. Carry out technical transfer to the staff of
MoES and other relevant agencies through the
Study activities.
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
4Technical Challenges to Study on Structures
JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
- Flood-dike, guide-dike and spur-dike, Re
Position, direction, height, and protection of - Numerical analysis with micro model hydraulic
test on river morphology - Banking materials for impermeable zone (soil or
soil cement etc.) - Slope protection with concrete block, connected
concrete block, gabion, stone-rip-rap, and
geotextile considering local availability - Influence to Afghanistan side
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
5Challenges on Non-Structural Measures
JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
- Disaster Management
- Hazard/Risk Mapping
- Evacuation
- Manual
- Emergency countermeasures system
- Monitoring and evaluation system
- Emergency works
- Land Use, Institution, Organization
- Flood-proof land use based on hazar/risk map
- Government-Resident partnership
- Monitoring, forecasting and warning system
- Inter-agency disaster management system
- Disaster Management in community level
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
6JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
- Method of Analysis
- Satellite Image Analysis
- Runoff Analysis on Snow Melting
- Riverbed Variation Analysis
- Sediment Runoff Analysis
- Flooding Analysis
- Hazard/Risk Mapping
- Micro Model Simulation
- GIS data base
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
7JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
- Process of Flood Risk Management Planning
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
8JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
- Present Institutional Structure for Flood Risk
Management
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
9JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
- Capacity Building of Information Management and
Analytical Center (IMAC)
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
10JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
- Exercise Plan on Community Flood Risk Management
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
11Workshop/Seminar Plan
JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
12Study Time Schedule
JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
13Thanks
JICA THE STUDY ON NATURAL DISASTER
PREVENTION IN PYANJ RIVER MoES
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.