Title: How to Make the Most of Your Factory Acceptance Testing Process
1How to Make the Most of Your Factory Acceptance
Testing Process
- Factory Acceptance Testing (FAT) is a process
that takes place after design and manufacturing
to ensure that the equipment meets design
criteria and functions properly. Customers may
choose to do a functional test (FAT) to confirm
that all components and controls are working
properly. Factory testing provides various
advantages, the most important of which is the
ability to uncover flaws before the equipment
leaves the factory. - Testing allows your team to spot flaws and learn
how to fix them from the fabrication team. FAT
is an important chance that should not be passed
up. If FAT is skipped and flaws are discovered
after the equipment has been shipped and
installed, it might result in costly shutdowns.
Because detecting and resolving problems before
equipment leaves the manufacturer is intelligent
and much more efficient than discovering them
after installation in some situations, locating
and addressing them before it leaves the
manufacturer is wise and considerably more
efficient. - Advantages of Factory Acceptance Testing
- Check if the tie-in connection points are where
they should be. - Checks the accessibility for operation and
maintenance. - Examine the electrical connections.
- Check the documentation for the equipment.
2- Check the equipment against plans and
specifications linked to the project. - Get hands-on experience.
- Factory Acceptance testing consultants meet the
design, engineering, and fabrication teams. - Basics of Factory Acceptance Testing
- Given the importance of factory acceptance
testing, selecting the right manufacturer and - factory acceptance testing consultant is a
crucial initial step in the design/build process. - Connecting the skid to utilities for perform
functional activities, comparing assembly to as
build drawings, and verifying construction to
applicable standards or other customer criteria
are all part of the FAT execution process. - The testing of various critical components and
functions is included in a basic FAT checklist.
Since testing is usually adapted to the needs of
the customer, the following things are usually
common and not required on most checklists. - Connections, to ensure that they meet type, size,
and location requirements. - Installation and placement of the control panel.
- Type, size, and location of drain connections.
- Dimensions in total.
- Workmanship.
- Verifications of welding and weld documentation.
- Construction equipment and materials of major
importance.
3- piping, welding, maintenance, pumps, valves,
component accessibility, and other operational
difficulties, depending on the complexity of the
system. - For example, obtaining input for the test plan
from machine operators, quality control, and
maintenance personnel. In addition, the process
engineers provide you with a broader view of the
testing you require. - Fabrication facilities' FAT areas contain
resources for connecting skids to utilities such
as water, steam, compressed air, and power.
Project managers, as well as shop, engineering,
and design experts, may be provided by centres as
needed to assist clients with the testing
process. - FAT allows operators to functionally test a piece
of equipment before it leaves the shop, allowing
everyone to ask questions and suggest changes. - Based on specific requirements and unique
equipment specifications, testing can cover a
number of inspection points. Electrical power,
clean steam, hot and cold water, clean air, and
other utilities are common FAT regions at the
fabrication facility for testing skid systems,
clean-in-place (CIP) systems, and special
fabrications. - To guarantee that the equipment meets the
standards, a comprehensive inspection can
include a variety of conformity checks and
verifications. - Contract audit
- A thorough examination of the original agreement
to confirm that all contractual requirements
have been met. - Water testing
- It simulates system operation, confirms
manufacture against datasheets, user manuals, and
other relevant documents, and offers evidence of
functionality. - PID (piping and instrumentation diagram)
Auditing
4expert with sound knowledge of the processing
requirements, specs, and tolerances ensures a
quick and cost-effective trip to the
manufacturing facility. While most manufacturers
will have staff on hand to assist with testing
and answer questions, you should have your own
experts on hand to execute the tests and
double-check the most important requirements.
References https//www.saromglobal.com/factory-ac
ceptance-testing-process/ Sarom Global HQ
Australia, supporting EMEA (Europe, Middle East,
Africa), Asia Pacific, Americas. https//www.sarom
global.com/ info_at_saromglobal.com 61283175089