Steps to Maintaining your Asphalt Parking Lot with a Pavement Management Plan - PowerPoint PPT Presentation

About This Presentation
Title:

Steps to Maintaining your Asphalt Parking Lot with a Pavement Management Plan

Description:

There are different points to keep in mind for the maintenance of the pavement. Proper planning and strategy is required for the best services and maintenance of the pavement. – PowerPoint PPT presentation

Number of Views:45
Slides: 8
Provided by: Username withheld or not provided
Tags:

less

Transcript and Presenter's Notes

Title: Steps to Maintaining your Asphalt Parking Lot with a Pavement Management Plan


1
Steps to Maintaining your Asphalt Parking Lot
with a Pavement Management PlanSource
2
Step 1 Information Gathering
  • Before doing the maintenance service or repair of
    the pavement, you need to have a good
    understanding of the details of your pavement
    like-
  • The age of the pavement.
  • Past maintenance (type and date).
  • Size/area of the pavement
  • Thickness of the pavements asphalt.

3
Step 2 Assess the condition of asphalt pavements
  • After collecting the details of the history of
    your pavements, knowing the condition of your
    pavement is valuable knowledge to help you plan
    for maintenance and rehabilitation. As assessing
    your pavement every year or two will give you a
    better idea of how your pavement is deteriorating
    and allow you to plan and budget even further in
    advance.

4
Step 3 Budget for future maintenance and
rehabilitation
  • After assessing your pavement, take some time to
    plan for future maintenance. Based on the
    assessment of your asphalt pavement, some
    immediate maintenance may need to be performed to
    address any safety concerns, like filling
    potholes, cracks and the edges of the pavement.

5
Step 4 Plan for future maintenance
  • Your plan should include routine maintenance such
    as
  • ? Pavement assessments every 1-2 years.
  • ? Cracksealing every 2-3 years.
  • ? Patch potholes as soon as they appear.
  • ? Sealcoat surface every 3-7 years
    (depending on the sealcoat type).
  • ? Patch fatigue cracking areas every 4-6
    years.

6
Step 5 Follow and modify the plan as needed
  • Stick to the plan! You can set reminders on your
    calendar, and after each pavement assessment, be
    sure to review and modify your plan as needed.

7
  • For best service of asphalt pavings repair and
    maintenance,contact All Shore Paving Corporation.
  • Visit
  • http//www.allshore-paving.com
Write a Comment
User Comments (0)
About PowerShow.com