Steps to install Concrete Polishing in Indiana - PowerPoint PPT Presentation

About This Presentation
Title:

Steps to install Concrete Polishing in Indiana

Description:

A polished concrete does not end up the process. Now, the major issue is to install it which takes a lot of planning and also a lot of hours to finish the entire work. It is not easy to do because there is a major factor called timing when it comes to concrete polishing in Indiana – PowerPoint PPT presentation

Number of Views:25
Slides: 17
Provided by: ameliapaisley

less

Transcript and Presenter's Notes

Title: Steps to install Concrete Polishing in Indiana


1
Steps to install Concrete Polishing in Indiana
2
A polished concrete does not end up the process.
Now, the major issue is to install it which takes
a lot of planning and also a lot of hours to
finish the entire work. It is not easy to do
because there is a major factor called timing
when it comes to concrete polishing in Indiana.
The instant when the timing goes wrong, youll
have to stop the ongoing process and start all
over again. The whole time taken depends on the
size and condition of the room where concrete
polishing has to be done. Mostly, the time taken
in the installation is in between 3 to 6 days.
3
(No Transcript)
4
(No Transcript)
5
To maintain the integrity of the floor, there
requires a lot of time and skill. Each step taken
in the whole process is very important, and also
there should be nothing left, that means, all
aspects must be covered. If longevity is an
issue, then dont worry because it is for the
best.
6
(No Transcript)
7
(No Transcript)
8
Steps of Installation of a Concrete floor 1.
Preparation
This is the first and the very basic step while
polishing the concrete. There will be done a lot
of prying and surveying for this work. For this,
the surface should be suitable and also ready if
it can be. Now, make sure to get the substrate
right because this is the layer beneath the
actual flooring. Next step is to find out what
type of things we are dealing with before
proceeding
9
(No Transcript)
10
(No Transcript)
11
Once everything is known and made okay, the
excavation can begin. Remove the floorboards one
by one and make sure to mark out the floor height
with a line. Next, place a layer of sand at the
very bottom to avoid the moisture before placing
a sheet of plastic on top. Keep doing this until
you get two layers and then top it with a wire
mesh
12
(No Transcript)
13
(No Transcript)
14
2. Pouring Now, pouring is done and leveled
using a float. Whatever the area size decides the
time taken to complete the whole process. The
longest time period is 2 to 3 days. But, what
matters is getting it right, fully. 3.
Polishing Now its time to polish the concrete.
After the proper plates are installed in the
planetary grinder, then we start going through
the room so we dont get bumped into the walls.
If there is any incorrection, then this could
result in scratches and nicks on the walls. Now,
the tool marks are removed using hybrid tools.
This is done so that there should be no
impressions left on the surface due to
grinding. 4. Sealing Now, there is one final
step left which is cleaning up all the debris by
using a non- abrasive cloth. The next step is
applying the sealer applicator spray onto the
concrete floor. The sealer should be applied
15
(No Transcript)
16
For more update , visit us
https//www.commercialpaintingservices.com
Write a Comment
User Comments (0)
About PowerShow.com