MEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why - PowerPoint PPT Presentation

About This Presentation
Title:

MEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why

Description:

MEP consultants and contractors for construction projects have increased productivity, optimized resources, and reduced costs whilst delivering projects on time. To know more on how MEP coordination and clash detection helps delivery positive projects. Read more. – PowerPoint PPT presentation

Number of Views:79
Slides: 9
Provided by: bimengus
Category: Other

less

Transcript and Presenter's Notes

Title: MEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why


1
MEP Coordination and Clash Detection is Extremely
Significant for BIM-Know Why
2
An MEP systems coordinator can positively bring
about valuable insights in terms of construction
engineering projects.  A Mechanical, Electrical,
and Plumbing phase costs up to 50 of the
building cost. This can be significantly reduced
with the assistance of MEP coordination services.
In yester years, legacy construction processes
and workflows did not look at an MEP engineer,
firm, or consultant to be a grave necessity in
the building process. As time and technology
moved several notches in the AEC industry, it was
time for owners to take a smart decision to
create buildings that were efficient, productive,
and intelligent. Thats where MEP engineers were
called to work closely with various project
stakeholders to understand the scope, budget,
risks, quality, performance, etc.
3
MEP Consultants, firms or engineers render
optimal services in regards to MEP for design,
pre-construction, construction, commissioning and
occupancy. Based on project complexity, MEP
engineers or coordinators provide multiple
services at various levels of a project
lifecycle. A typical time to adopt MEP
construction services is during the
pre-construction phase. Another important concept
is clash detection, wherein various stakeholders
need to review integrated models from various
modelers and software. An integrated model is an
information-rich model that is quantified from
various sources. This model could contain errors
or clashes between various trades and assets.
These clashes need to be resolved at the earliest
to mitigate unnecessary rework and cost.
4
1. MEP should be a part of the construction
process. Why? 
The integration of an MEP engineer can
significantly clear doubts from owners, wherein
informed decisions can be taken for present and
future projects. An MEP Engineer hired at the
start of a project provides valuable insight for
long-term operations benefits. Resolving errors
at the end of a project can significantly
increase projects costs and heavy
rework. Identifying problems behind the desk is
an extremely valuable proposition, rather than
moving the pieces after the equipment and assets
have be purchased or installed. MEP specialists
have great perspective and are qualified and
allowed to review and challenge cost estimations
done by subcontractors. Errors in costing at the
beginning of the building cycle can create
significant loss and challenges for construction
engineering projects. Having a clear
understanding of engineering design and
operations comes from practical experience and
perspective. Being an MEP engineer requires
people to actively participate in technical,
budgeting, and management roles. An MEP engineer
helps owners plan a course of action and make
agile decisions with the best options in terms of
upfront costs and lifecycle budgets.
5
MEP consideration for various industry verticals
Buildings and facilities are getting complicated
by the day. The integration of an MEP engineer or
company shows true perspective for any vertical,
be it Residential, Commercial, Hospitality and
more. MEP coordinators need to work on multiple
projects, and this requires fine construction
planning from MEP coordinators. They need to
understand the complexity of the project, and
provide an accurate timeline with the necessary
adjustments to deliver positive project outcomes.
This adds greater value for a project(s). Emergin
g technology is solely not focused on budgets,
but the complete team that is involved in the
execution of the project.  Effective
communication and collaboration are key factors
in an MEP Coordination process. Any changes
taking place in various project phases need to be
communicated to all the team members. Thus,
integrating the entire design process with cost
management can generate exceptional building
results. An accurate MEP design can be enhanced
by locating assets and components in a model(s)
for design, operations and construction
management. An MEP engineer also has the
responsibility of detecting clashes for various
systems, upon review, if there is component
interference, and then it needs to be resolved as
soon as possible.
6
Demand for Clash Detection is important
When designs from various models are quantified
on a single platform, there are probabilities of
various detections between various members of an
AEC project. These clashes can be classified into
Hard and Soft Clashes. The integration of BIM
aids various general contractors and construction
engineers detect clashes through
constructability. An MEP engineer understands the
consequences of messages being sent by various
teams to rectify the clashes. For large projects,
it is highly imperative for all the stakeholders
to resolve Clash Detection early in the
construction phase. A hard clash needs to be
resolved before the actual construction begins.
Hard clashes generally indicate interference of
members in various trades. Owners can leverage
the power of clash detection with software like
Navisworks these detections are based on various
rules set forth in the software Geometry,
Semantics, and Algorithms. Soft clashes are not
interferences, but clashes that arise due to
insufficient amount of allotted space for various
members during construction or maintenance.
Minimum clearances need to be added for members
to be installed without any space cramping. The
adoption of BIM aids various stakeholders for
workflow, manage plans efficiently, and plan the
construction phase. A sequential workflow makes
it very clear for stakeholders and teams to build
onsite and operate the facility with efficiency
and productivity.
7
Conclusion
The adoption of BIM with MEP coordination service
and Clash Detection is extremely beneficial for
AEC personnel, wherein projects can be built
based on models, simulations, and real-time
scenarios.  Coordinated and collaborated design
can be achieved through MEP solutions.
Outsourcing MEP coordination services to
companies contributes significantly to value
engineering based on quality and cost
effectiveness. To know more about latest
blog Read More
8
Thank You..!!
Source http//blog.bimengus.com/mep-coordination-
clash-detection-extremely-significant-bim/