Title: How to Write A Good Concrete Moisture Testing Specification


1
How to Write A Good Concrete Moisture Testing
Specification
  • EP Floors Corp.

2
Type of testing to be done
  • ASTM F 1869 moisture test
  • ASTM F 2170 moisture test
  • Add pH testing per ASTM F 710 if indicated.

3
Number of tests
  • The standard calls for three tests for the first
    1,000 sq feet and one test
  • for each 1,000 sq feet thereafter. However, this
    number may change,
  • depending on the size of the slab, age of
    concrete, building temperature
  • and RH, and the preliminary results from the
    Static Moisture Testing.

4
Timing of testing
  • The temperature and humidity conditions are
    important for the
  • dynamic test (Calcium Chloride). For new
    construction, dynamic
  • testing should be done after the building is
    enclosed and the
  • HVAC system is running, and the areas have
    reached steady
  • state conditions. 

5
Reporting
  • Test reports should contain the conditions at the
    time of testing,
  • methodology of testing and test results. This is
    an important way to
  • document not only the test results but the
    accuracy of the testing that was
  • done. The specification should also identify who
    is to receive the report
  • the owner, general contractor, architect or all
    parties.

6
Mapping
  • The more sophisticated reporting done will show a
    floor plan
  • with the test results, which can help the
    construction team
  • identify problem areas in the floor.

7
Repair options
  • The report should include options for repairing
  • a floor that exceeds the manufacturers limits.

8
Moisture Testing Specification
  • The moisture testing specification may be
    standalone specification as
  • part of a concrete floor slab section that
    details some of the key points of
  • a concrete industry standard designed to prevent
    floor covering moisture
  • problems.
  • The details may include the need for
  • The concrete to be dry, clean, smooth, and free
    of contamination.
  • Concrete should be moist cured for at least seven
    days (failure to do so may increase permeability
    four times or more)
  • The installation of a vapor retarder directly
    under slabs on or below grade.
  • The use of moisture-retaining coverings for
    curing concrete.

9
Contact us
  • Corporate Headquarters
  • 4 Springfield Street
  • Fifth Floor
  • Three Rivers, MA 01080
  • Phone 413-283-5164
  • Toll Free 800-808-7773
  • Email info_at_EPFloors.com
  • Fax 413-283-5347
  • For More Information Visit On our Official Site
    www.epfloors.com

10
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com