Fiinovation Reviews India Plans to Boost Renewable Energy by Implementing Stalled Hydro-Electric Projects - PowerPoint PPT Presentation

About This Presentation
Title:

Fiinovation Reviews India Plans to Boost Renewable Energy by Implementing Stalled Hydro-Electric Projects

Description:

Fiinovation reviews that the development in the Himalayan belt slowed down after the 2012 floods as the states put new permits on hold. – PowerPoint PPT presentation

Number of Views:10
Slides: 8
Provided by: Fiinovation
Category: Other

less

Transcript and Presenter's Notes

Title: Fiinovation Reviews India Plans to Boost Renewable Energy by Implementing Stalled Hydro-Electric Projects


1
Fiinovation Reviews India Plans to Boost
Renewable Energy by Implementing Stalled
Hydro-Electric Projects
  • Fiinovation, Fiinovation Delhi

2
  • India's plans for renewable energy sector are
    ambitious requiring huge investments within a
    short span of time.
  • Looking at the urgent need of funds, India has
    already opened up the sector for foriegn
    investments and is looking to boost renewable
    energy equipment manufacturing at home.
  • During the Paris Climate Summit, India along with
    France launched the International Solar Alliance
    of more than 100 sun shine countries who will
    working together to generate solar energy and
    reduce dependency on coal.
  • This move is in best interest of our planet as
    the aim is to significantly reduce the carbon
    emissions.

3
  • Fiinovation reviews that not just the solar
    power, but other renewable energy sources are
    also being focused upon.
  • Not only the centre, but even the states are keen
    on boosting renewable energy generation.
  • With states such as Himachal, Jammu Kashmir,
    Uttarakhand willing to boost hydro power
    generation in their respective states, the
    central government has asked the Niti Aayog to
    submit a report on the stalled hydroelectric
    power projects that have held up large
    investments.
  • Fiinovation reviews this move is in context with
    the government aim to provide 24x7 electricity
    across the country.

4
  • Fiinovation understands that India has wants to
    achieve 175 GW of renewable energy by 2022 that
    includes 5 GW of small hydro power (25 MW
    capacity hydro projects).
  • Focusing on the stalled and delayed projects will
    help the government analyse the reasons behind
    the delay or stalling up of the projects.
  • Fiinovation reviews that as per the 12th Plan the
    proposed hydro capacity addition is 10,897 MW,
    whereas till December 2015 only 3,651 MW actual
    capacity was added.
  • This is just 33 percent of what has been proposed
    under the 12th Plan.

5
  • Fiinovation reviews that the development in the
    Himalayan belt slowed down after the 2012 floods
    as the states put new permits on hold.
  • The environment clearances in the eco-sensitive
    zone is one major hurdle in the development
    process.
  • However, apart from the risks, hydro power
    continues to emerge as a long term alternative
    with economic benefits to the nation.

6
  • lot of hydel power investments are going to the
    North East as the transmission corridor through
    Bangladesh is attracting private investments.
  •  
  • Let's us hope that speed of these developments
    keeps increasing with collaboration between
    nations and private players.

7
Thank you
  • Fiinovation.co.in