It is really an advantage that Revit users don’t always have to copy the elements of a linked model in a current project for monitoring them. – PowerPoint PPT presentation

Number of Views:5
Slides: 9
Provided by: jbhtesla
Category:

less

Transcript and Presenter's Notes

Title: Process of monitoring elements of a linked model in Revit


1
JBH-Tesla Design Group Inc.
  • E-mail Us projects_at_jbhtesla.com
  • Call Us (914) 944 3377

2
Process of monitoring elements of a linked model
in Revit
3
  • It is really an advantage that Revit users dont
    always have to copy the elements of a linked
    model in a current project for monitoring them.
    In other words design development team members
    can conveniently establish a monitoring
    relationship between the elements of a linked
    model and a host model without even copying the
    elements of a linked model in the host model.
  • For continently monitoring elements Revit users
    can also establish a relationship between
    corresponding elements. A pair of corresponding
    elements is chosen by users for establishing
    relationship, such as relationship can be
    established between the grid line in the host
    project and the grid line the linked project. We
    cannot establish monitoring relationship between
    unlike pairs.

4
Process of monitoring elements in a linked model
  • For monitoring the elements of a linked model,
    Revit users first have to open project in Revit.
  • Once a project is opened in Revit, users are
    required to create a view.
  • For doing so Revit users are required to open a
    view wherein they can view the elements for
    monitoring.

5
  • Revit users are suggested to select View
    properties by clicking on Graphics panel which
    resides within View tab.
  • After that they are suggested to select
    Coordination for discipline in the Properties
    dialog.
  • By selecting coordination Revit users ensure that
    elements belonging to different disciplines can
    be displayed in the view that they have created.
  • Now Revit users should link a model in the host
    model.

6
  • Now users are suggested to perform an important
    step that is to pin the linked model. The reason
    behind doing so is that the linked model stay
    intact in its place, it cannot be moved by
    mistake.
  • User should also make it sure that the linked
    model displays in halftone so that elements of
    both host model and linked model can be
    distinguished.
  • In the next step users are suggested to click
    Collaborates tab and then select Coordinate
    panel. After selecting Coordinate panel users
    are now required to select Copy/Monitor
    drop-down after which they should chose Select
    Link.

7
  • Now comes the time of selecting a linked model in
    drawings area.
  • After selecting a linked model in the drawing
    users are required to select an element from the
    host project and then select a similar
    corresponding element in the linked model.
  • Once all the relevant pairs have been selected by
    users they can select Finish.
  • Now even if one of the selected elements in the
    pair is implemented with any sort of changes
    Revit displays a warning saying that a change has
    been made to a monitored element.

8
Contact Us
  • New York
  • JBH-Tesla Design Group, Inc.