Maine Financial and Administrative Statewide Information System MFASIS Upgrade Project AdvantageME - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Maine Financial and Administrative Statewide Information System MFASIS Upgrade Project AdvantageME

Description:

GAX files must include the country code null or a value ... All other countries the state/province and postal codes will not be required ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 21
Provided by: eops
Category:

less

Transcript and Presenter's Notes

Title: Maine Financial and Administrative Statewide Information System MFASIS Upgrade Project AdvantageME


1
Maine Financial and Administrative Statewide
Information System (MFASIS) Upgrade
ProjectAdvantageME
  • Agency Interface Status Meeting

September 27, 2006
2
MFASIS Upgrade Project
  • Agenda
  • Project Schedule
  • Interface Testing Status
  • User Acceptance Testing
  • Importance of BIE
  • Testing Environments
  • Vendor Crosswalk
  • Foreign Addresses
  • Secure FTP Server
  • Next Status Meeting November 8

3
Project Schedule
4
MFASIS Upgrade ProjectProject Schedule
  • Go-live dates
  • Vendor Self-Service (VSS) 11/15/06
  • Financial 1/2/07
  • Last phase of testing User Acceptance Testing
    will begin in October

5
Interface Testing Status
6
MFASIS Upgrade ProjectInterface Testing Status
  • Certification status for each interface see
    attached document
  • User Acceptance Testing (UAT) for interfaces will
    begin on October 16 - excepting DOE and P/R JVs
  • As of 10/9/06, all test files must
  • Use the vendor crosswalk file created with
    8/31/06 data
  • Be accompanied by an INF file and a BIE online
    entry
  • If interface fails resend files on October 25

7
User Acceptance Testing
8
MFASIS Upgrade ProjectUser Acceptance Testing
  • User Acceptance Testing Guidelines
  • Use parallel production files
  • Use production FTP server
  • Use 8/31/06 vendor and customer crosswalk files
    will be provided on production FTP server by
    October 6
  • Agency will FTP files and email Brenda Palmer
    include the date the file was originally
    processed in production
  • INF control file will be required, must use
    correct unit code
  • Each interface is assigned a processing date for
    testing purposes (see attached integration
    schedule doc.)
  • Agency files due no later than noon (October
    16-18) on their scheduled submission date
  • INF batch id and import date must reflect
    assigned test date
  • INF and document file names must reflect assigned
    test date

9
MFASIS Upgrade ProjectUser Acceptance Testing
contd
  • The following must have the same date
  • Document file name
  • INF file name
  • INF batch id
  • INF import date
  • BIE import date
  • GAX files must include the country code null or
    a value
  • Payment feedback file will be provided
  • PDF file of sample checks will be provided
  • Scheduled payment date edit
  • Sched. Payment date must be or gt system date
  • Edit will be relaxed to accommodate integrated
    testing
  • Agency will make BIE entry online

10
Importance of BIE
11
MFASIS Upgrade ProjectImportance of BIE
  • Verify person entering BIE (see attached
    schedule), if change is needed contact Brenda
    Palmer
  • Once the interface file is transmitted, it is
    vital that the BIE entry be made before noon on
    the day it is to be processed
  • Technical staff must communicate with the
    business staff
  • BIE entries must be made in the correct
    environment
  • Production URL for user acceptance testing will
    be provided on October 9 - AdvantageME userid and
    password should be tested immediately

12
Testing Environments
13
MFASIS Upgrade ProjectTesting Environments
  • October only, user acceptance testing will be
    done in the production environment.
  • As of 10/28/06 the production environment is
    being readied for 11/15/06 go-live of Vendor
    Self-Service. - Production environment
    will no longer be available for testing
  • New URLS will be provided to business staff for
    online BIE entries

14
Vendor Crosswalk File
15
MFASIS Upgrade ProjectVendor Crosswalk File
  • During VSS go-live implementation a vendor
    crosswalk will be generated using 10/31/06 MFASIS
    data
  • This is the final vendor conversion from MFASIS,
    it will contain the final go-live vendor codes
  • New vendors added to MFASIS will be appended to
    the 10/31/06 vendor crosswalk file until Dec 29
  • Vendor crosswalk will be frozen on 12/29/06

16
Foreign Addresses
17
MFASIS Upgrade ProjectForeign Addresses
  • U.S., Canada, Germany, and Mexico vendor
    addresses must contain state/province codes and
    postal codes
  • All other countries the state/province and
    postal codes will not be required

18
Secure FTP Server
19
MFASIS Upgrade ProjectSecure FTP Transmissions
  • October 9-27 interface user acceptance testing
    will use new production Momentum server
  • Connection information for production FTP server
    will be provided by Oct 6
  • Starting Oct 28 agencies will be locked out of
    the production Momentum server until go-live at
    the end of December

20
MFASIS Upgrade Project
  • Next Status Meeting November 8