VV TakeUp Project - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

VV TakeUp Project

Description:

Intergraph Intergraph AIM product suite. EPM Technology EXPRESS data exchange and management tools ... Structure - e.g. an EXPRESS model, the POSC/Caesar data model ... – PowerPoint PPT presentation

Number of Views:68
Avg rating:3.0/5.0
Slides: 19
Provided by: hansivin
Category:
Tags: takeup | aim | express | project

less

Transcript and Presenter's Notes

Title: VV TakeUp Project


1
VÅV Status and Implementation VÅV TakeUp
Project Hans Øivind Slettebø Project
Manager
2
THE VÅV PROJECT
Joint Industry Project Group
Åsgard
Varg
Åsgard
Visund
Visund
Varg
3
VÅV Objectives
Source
  • Implement P/C Product model and demonstrate
    the use of it
  • Find/develop tools that make it possible to
    bring data in/out to/from the P/C database
  • Verify the P/C Product model

Map andtransform
P/C Target
4
VÅV strategy
  • Work together to find common industry solutions
  • Ask engineering marked to join
  • Associate VÅV and POSC/Caesar organizations.
    Connect the project closed to Åsgard LCI
  • Start implementing one place (Åsgard)
  • Use existing architecture standards where
    ever possible

5
VÅV Steering Committee 1997-03-19
Data Management solution
  • IBM and Intergraph to develop and deliver an
    integrated data
  • management solution that
  • demonstrates the use of data mapping tools to
    extract and transform data from legacy data
    stores (Statoil STID database - technical
    information ) to a POSC/Caesar data store
  • use the Intergraph AIM product suite to access
    and browse the data extracted from the
    legacy data stores to demonstrate the practical
    use of the POSC/Caesar product model
  • verifies the use of the POSC/Caesar product
    model and feedback practical experiences to
    the POSC/Caesar project team Shall be
    in place (delivered and tested) by 20th August
    1997

6
Two-phased Approach
  • Planning and Design
  • to design the integrated solution
  • to select the data exchange and mapping
    tools to be completed by 14th May 1997
  • System development, integration and testing
  • to integrate and test the data exchange and
    mapping tools
  • to develop, configure and test the Intergraph
    AIM product suite with the POSC/Caesar
    product model for Snapshot C/D
  • to verify the POSC/Caesar product model
    to be completed by 20th August 1997

7
Consortium
Organization Roles and Responsibilities IBM De
sign and planning overall solution, development
Mapping Tool, verification Intergraph Interg
raph AIM product suite EPM Technology EXPRESS
data exchange and management tools EuroSTEP
GmbH EPISTLE Framework and STEP skills, data
mapping expertise ISI AS Implementation -
LCI domain expertise and data quality
management skillsCap Gemini Data
mapping Åsgard mapping Mapping, generating test
dataTeam POSC/Caesar
proj., VÅV and Åsgard assistance
8
VÅV architecture
MAPPING TOOL
Legacy A
Source model
P/C model
Load spec ÅSG/KR 007
Legacy B
EXPRESS-X
DVKS
Translation
Browser
Consol / Merge
Legacy C
AIM-API
STID
Extract and generate
Import AIM BLI
Data Ware- house
Select
Stage Data Store
Target P21
Source P21
SDAI
Appl.
P/C ref. lib.
Ref.lib P21
9
What does data migration means ?
  • identification of Structures and Semantics of
    the Source Data Structures - e.g. the
    database schema, in which the data are stored
    Semantics - e.g. the user given meaning
    traditionally many meanings are implied,
    and not explicit in keywords and
    relationships within the structure
  • identification of Structures and Semantics of
    the Target Data in P/C Structure - e.g. an
    EXPRESS model, the POSC/Caesar data model -
    the model is a meta model and has very little end
    user semantics - any relationship between
    two things is represented as an association
    which is additionally generated - any user
    data is in ONE general storage place
    (Info_Content) Semantics - the semantics is
    explicit by generation of association
    entities - the interpretation is in data from
    the P/C Reference Data Library

10
MAPPING
11
What goes beyond a traditional mapping task
  • Hide the information model from the user and
    assist the user by use of interpretation
    templates
  • guide the engineer (domain expert) to
    interactively define the interpretation of
    definitions of source data stores into a
    representation of P/C
  • use classifying information from the P/C
    Reference Data Library for the declaration of
    translation rules
  • most attributes maps are default assignment
    statements, to be hidden from the user
  • develop and maintain mapping algorithms
  • With the proposed Mapping Tool, the need for a
    P/C model expert
  • is limited and the work can mostly be done by
    domain expert,who understands the basics of the
    P/C model.

12
POSC/Caesar Mapping Magician
P/C ClassLib
Source models
P/C Model
Mapping data
Usage Scenario ENTITY equipment list
tagNo STRING designTemp STRING
projectCode STRING
P/C Mapping Assistant
P/C Reference data
Source Definition (ex. STID)
P/C-Type
Property Class
context
designTemp
Available Classes
Mapping Project (STID)
design temperature nominal pressure nominal
radius viscosity flow rate
designTemp is a Property Class mapped to design
temp. possessed by
OK
13
  • ?

Intergraph NOTIA AIM POSC/Caesar Data
Warehouse (PCDW)
  • ?
  • NOTIA AIM value added components
  • POSC/Caesar Product Data Model
  • POSC/Caesar Reference Data Library
  • Part 21 in/out
  • Browser
  • API
  • Built on Metaphase
  • Object-oriented data Modeling
  • Full security features
  • Document management, product data and
    workflow management
  • Graphics will initially be treated as binary
    information (a pointer to an AIM document)

POSC/Caear Product Data Model
14
Integrated Architecture
  • ?

?
NOTIA
  • ??Base AIM products
  • ??Value-Added Modules
  • ??Value-Added Applications

15
AIM IN ÅSGARD
VENDOR
FC
VENDOR
Subsea
other Statoil
Intergraph AIM
KESYS
TEKTONISK
ÅSG/KR-007
POSC/CAESAR
MAPPING AND TRANSFER
STANDARD
EXISTING DOCs DRAWINGS
16
Verification
  • implementation of the Product Model - data
    store - mapping tools
  • import/export from/to legacy systems
  • necessary changes to the Prod. Mod.
  • access P/C data and bring meaningful data to
    applications
  • acceptable performance
  • understanding - need for changes/add ons/
    training
  • can all data type be registered ?
  • easy to implement a new version of P/C ?

17
Verification
  • IBM
  • Good points about the POSC/Caesar Product Model
  • enables organizations to manage the change
    history at a very fine level of detail
  • the reference data library is an excellent idea
    which should ensure a long life for the data
    model
  • the Product Model is very flexible and generic
  • it meets a broad range of requirement for the
    asset life cycle for the oil and gas industry

18
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com