Best Practices for migration to Crystal Enterprise 10 - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Best Practices for migration to Crystal Enterprise 10

Description:

Data Management Group Who we are. Best Practices in CE10 Migration. Upgrade Options ... DHTML Viewer direct print from the viewer (small download) ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 13
Provided by: gmolo
Category:

less

Transcript and Presenter's Notes

Title: Best Practices for migration to Crystal Enterprise 10


1
Welcome
Best Practices for migration to Crystal
Enterprise 10
2
Agenda
  • Data Management Group Who we are
  • Best Practices in CE10 Migration
  • Upgrade Options
  • Preparation before the upgrade
  • The upgrade Process
  • Thing to Know before you Upgrade
  • Summary and QA

3
Corporate Overview
  • Crystal Decisions/Business Objects Partner since
    1995
  • Gold Partner Level, Product Reseller, DC/VA
    Certified Public Training
  • Partner, Certified Consultants
  • Government Services Contract (GSA) IT Schedule
    70
  • Top 50 IT Small Business in Washington-DC
    (Washington Technology)
  • Located in Washington D.C., Hampton, VA, and
    Dallas, TX

Our client base includes fortune 500
corporations, manufacturing,service companies,
systems integrators, software developers, federal
agencies, state governments, and non-profit
organizations.
4
Upgrade Options
  • Three Options to Upgrade
  • Upgrade
  • Upgrade your existing Crystal Enterprise
    Environment
  • Upgrade V8.0 through V9.0
  • Migration
  • Install a new Environment
  • Convert your APS Database
  • Clean Installation
  • Install a New Environment
  • No database conversion clean CMS

5
Upgrade Options - Upgrade
  • Upgrade
  • Upgrade your existing Crystal Enterprise
    Environment
  • Upgrade V8.0 through V9.0 No supported direct
    upgrade from SI
  • Simple upgrade, load and go
  • Make sure you first upgrade the machine with the
    APS, then upgrade all other servers
  • Remember you are upgrading all old components
    not loading new services (Event, Program Job
    Server)
  • Make sure you complete the update Objects process
    in the CCM

6
Upgrade Options - Migration
  • Migration
  • Install an entire new CE system (New Hardware)
  • Migrate the APS database to V10 CMS Database
  • New Install of the software
  • Full install of V10, then migrate the APS
    Database
  • Make sure you complete the update Objects process
    in the CCM
  • Install with the MSDE Database version, then
    migrate your SQL, Oracle, Informix or DB2 APS
    Database
  • Not a need if the APS database is SQL and is
    loaded on the same server

7
APS Datasource Selection
8
Upgrade Options New Installation
  • New Installation
  • Install an entire new CE system (New Hardware)
  • No migration clean start
  • New Install of the software
  • Full install of V10
  • Install with the MSDE Database version, then
    migrate to your SQL, Oracle, Informix or DB2 APS
    Database
  • Not a need if the APS database is SQL and is
    loaded on the same server
  • Total re-input of users, groups, folders, reports
    and security
  • Great option to clean up the system

9
Preparation
  • This is your Production BI system..

Treat it like a system..
10
Preparation
  • Nobody plans to fail, people just fail to plan
  • Blue Print your system
  • Servers, Databases
  • What services reside on what servers
  • License Structure
  • Software and Licenses
  • Assure you have the proper software (CE, CR, AD
    HOC, Analysis)
  • Assure you have the proper key codes (for each
    piece of software)
  • Proper Backups
  • APS Database (Have you ever attempted to restore)
  • FileStore
  • Custom Code
  • Screen Shot all services settings (Job server)
  • Upgrade on Test first, Production second!

11
The Upgrade Process
  • 1. Attend a CE10 Course SA200, SA300 or SA400
    or
  • 2. Read the getting started and install PDFs
    that are on your CE10 CD
  • Specific points to note
  • Platforms.txt (Supported Platforms)
  • Migrating the APS from an earlier version
  • Importing content from CE or SI
  • Prior version support
  • Crystal Repository Wizard
  • Upgrade of thick client components (Import
    Wizard, Publishing Wizard)
  • Add in new client components Business Views

12
Things to know before you upgrade
  • The APS is now the CMS
  • Load new services (Upgrade only upgrades old
    services does
  • not install new services)
  • Platforms.txt
  • CE9 and CE10 CANNOT reside on the same server
  • Features for SMTP, Unmanaged Disk and FTP reside
    under
  • both the job server and program Job Server
  • DHTML Viewer direct print from the viewer
    (small download)
Write a Comment
User Comments (0)
About PowerShow.com