Need for Prefabricated Bridge Elements and Systems for Accelerated Bridge Construction - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

Need for Prefabricated Bridge Elements and Systems for Accelerated Bridge Construction

Description:

Need for Prefabricated Bridge Elements and Systems for Accelerated ... then quickly move it into place like in hours or a weekend! Update on FHWA Survey on ... – PowerPoint PPT presentation

Number of Views:1497
Avg rating:3.0/5.0
Slides: 25
Provided by: vasant6
Category:

less

Transcript and Presenter's Notes

Title: Need for Prefabricated Bridge Elements and Systems for Accelerated Bridge Construction


1
Need for Prefabricated Bridge Elements and
Systems for Accelerated Bridge Construction
WASHTO-X Webinar June 17, 2008
By Vasant Mistry Federal Highway
Administration vasant.mistry_at_fhwa.dot.gov
2
Topics
  • Update on FHWA Survey on ABC
  • Standardizing Prefabricated Bridge Elements and
    Systems (PBES)
  • Available Tools and Resources

3
Accelerated Bridge Construction
  • is to build the bridge first before you set
    cones,
  • then quickly move it into place like in hours
    or a weekend!

4
Update on FHWA Survey on Accelerated Bridge
Construction
5
States using systematic economic process
6
Applying ABC for construction of new structures
7
Applying ABC for rehabilitation of existing
structures
8
Standardizing Prefabricated Bridge Elements and
Systems
9
Precast Abutments
10
Precast Abutments
11
Precast Piers
12
Precast Piers
13
Precast deck on precast concrete girders
14
Precast Decks on Steel Framing
15
Precast Decks
16
FRP Decks
17
Total Bridge Prefabrication
18
Total Bridge Prefabrication
19
Superstructure Prefabricationwith Continuity
20
Superstructure Prefabricationwith Continuity
21
Retaining Walls
  • Mechanically Stabilized Earth Walls
  • Precast Gravity Walls
  • Precast Cantilever

22
Available Tools and Resources
  • Learn more
  • www.fhwa.dot.gov/bridge/prefab
  • Tools
  • Decision-Making Framework for the Use of
    Prefabricated Bridges
  • Self-Propelled Modular Transporters (SPMT) Manual
  • Connection Detail Catalog for PBES
  • FHWA ABC Workshops for DOTs
  • FHWA Contacts
  • Vasant Mistry at Vasant.Mistry_at_dot.gov
  • Kathleen Bergeron at Kathleen.Bergeron_at_dot.gov

23
Prefabricated Bridge Elements and Systems (PBES)
  • PBES offers significant advantages over
    Cast-in-place construction
  • Reduction in onsite construction time
  • Reduction in Traffic and Environmental impact
  • Lower First and Life-Cycle Costs
  • Improves Safety and Quality

24
Thank You
Accelerated Bridge Construction
Write a Comment
User Comments (0)
About PowerShow.com