Title: OVERVIEW ROADS AND TRANSPORT


1
OVERVIEW ROADS AND TRANSPORT
2
  • Vision An Efficient, Safe, Affordable,
    Sustainable and Accessible Transportation System
  • Mission To provide, develop, regulate and / or
    enhance a safe and affordable multi-modal
    transport system which is integrated with land
    use to ensure optimal mobility of people and
    goods in the Province of the Eastern Cape in
    pursuance of the strategic focus areas contained
    in the Provincial Growth and Development Plan.
  • Values In carrying out its mandate the
    Department of Roads and Transport subscribes to
    the following set of values
  • Transparency
  • Accountability
  • Integrity
  • Consultation
  • Professionalism
  • Transformation
  • Service delivery ( Batho Pele)
  • Preservation of the Environment
  • Respect for our Heritage

3
Important policy decisions and strategic issues
facing the department
  • The delivery of the policy speech and strategic
    plan in May 2005 followed a national election.
  • The Executing Authority gave the strategic
    direction that transport is moving back to rail.
  • The department also identified programmes to
    improve rural accessibility in order to
    contribute to the national and provincial goals
    in particular the Provincial Growth and
    Development Plans 2004 to 2014.
  • It is general knowledge that strategic
    performance planning in government is guided by
    political priorities as cited by the State
    President, Premier and Member of the Executive
    Council. The successful implementation of the
    strategic performance plan for the department is
    a collective approach led by the Executing
    Authority on a policy formulating level and the
    Accounting Officer on an administration level.
    The senior managers provide strategic collective
    leadership in policy implementation and
    monitoring through the different departmental
    programmes.

4
Important policy decisions and strategic issues
facing the department
  • The objectives of the departmental programmes
    indicate how the department intended to continue
    with its commitment of transforming the
    department in transport related matters -
  • Administration To render effective financial,
    human resources and management support services.
    To provide efficient and sustainable government
    transport services to user provincial
    departments.
  • Public Transport To formulate, promote and
    implement integrated transport planning and
    policies. To provide reliable, safe, affordable
    and efficient public passenger multi-modal
    transport systems and regulation of air traffic
    control and navigational services.
  • Traffic Management To facilitate and promote
    traffic safety and traffic control.

5
Significant events and major projects during the
year
  • The road functions was legally transferred from
    the then Department of Roads and Public Works to
    the then Department of Transport with effect from
    1 September 2004.
  • The Kei Rail project progressed at a less
    satisfactory due to the re-location of citizens
    from siding rail site at Zamukulungisa informal
    settlement (Mthatha) to a new residential area.

6
Overview of the voted funds
  • During the 2005 financial year, provincial
    legislature appropriated an amount of R312 507
    000 (2004R309 037 000) to the department.
  • The R312 507 000 was revised to R302 586 000 in
    order to assist in funding a provincial deficit.
    The actual total expenditure for the financial
    year amounted to R 289 367 853 (2004 R 307 901
    000).
  • The amount that was not spent from the vote is
    R13 218 147, which is 4 of the Voted funds
    (2004R1 136 000, which equals 0.5 of the Voted
    funds). The unspent amount of R13 218 147, is
    before the inclusion of non-voted funds and
    expenditure of local and foreign aid assistance.
  • The expenditure of R289m reflects a 96 spending
    (200499.5) after the final adjustment and
    write-offs of irrecoverable debts of R2m. The
    spending, before write-off, amounts to R286m,
    which is 95 (200498) of the Voted funds.

7
Motor Vehicle License Fees
  • The major source of own collected revenue arise
    from motor vehicle licence fees as a result of
    fees charged on vehicles using public roads.
  • The fee is applicable to all annual registrations
    and renewals of motor vehicle licenses and
    trailers. While not directly earmarked for road
    works, the revenue generated from this process
    provides an important contribution to the
    provincial fund as own revenue.

8
Vehicle Licence Number Plates
  • Ordinary licence number plates are sold by
    registered private businesses and the department
    charges royalties at R5.30 per plate. A private
    company 3M (Pty) Ltd was appointed by the
    Department of Transport to collect these
    royalties on its behalf. Since February 2003 the
    company stopped collecting the royalties as a
    result of unsigned agreement. Efforts to collect
    monies since February 2003 are still pursued via
    the signing of a written agreement. It appears
    that the amount is recoverable because it is
    collectable.
  • The second category of licence number plates is
    the specific plates or numerical alpha and is
    sold at R500.00 per set. This revenue is
    collected by and payable directly to the
    Department of Transport.
  • The third category of licence number plates is
    the personalised plate, which is sold at R1
    500.00 per set. The department also collects the
    revenue from this category.

9
Significant events and major projects during the
year
  • Own revenue collection target of R152m beginning
    of the financial year.
  • Revised the target in November 2004 to R109m.
  • The department collected R116m (2004R152 m) as
    its own revenue, against a revised target of
    R109m (2004R149m).
  • The collection of revenue decreased by 24, at
    R116m for 2005 compared to the previous financial
    year 2004.
  • A comparison of the collected revenue of R116m
    with the revised budget of R109m, reflects a 6
    (R7m) increase above the target.

10
Capacity constraints
  • An organisational structure, as a result of the
    transfer of Roads function to the Department is
    in place as at March 2005.
  • The Department is still constrained by
    non-filling of critical posts which hampers the
    Department to deliver on its mandate as
    prescribed by various legislations particularly
    the Public Finance Management Act, Public Service
    Act, National Road Traffic Act and National Land
    Transport Transition Act. (NLTTA).

11
Arrive Alive Funds
  • The department received donor-funding amounting
    to R374 059 (2004 R2 816 672) in August 2004,
    from National Department of Transport during the
    year under review.
  • The R374 059 received during the current
    financial year added to the balance at beginning
    of year which amounted to R1 349 763.
  • A total amount of R1 102 614 was utilised as
    reflected in the Notes to the Annual Financial
    Statements. The balance of R 621 208 is disclosed
    as part of equity in the balance sheet.

12
Algoa Bus Funds
  • An opening balance of R3 272 920 from the
    previous year was added to an amount of R83 700
    000 (2004R78 000 000) which was received during
    2005.
  • The balance, after claims amounting to R76, 439m
    by Algoa Bus Company amounts to R10, 534m. (2003
    R3 272 920) which is payable in subsequent
    financial year.

13
National Land Transport Transition Act (NLTTA)
project
  • An amount of R800 000 was received towards the
    end of the financial year from National
    Department of Transport (NDOT).
  • The purpose of the funds is to assist the
    Department and certain municipalities as
    identified by the department, in the preparation
    of the Operating Licences Strategies (OLS),
    Rationalisation Plans (Rat Plans), Public
    Transport Plans (PTPs) and Integrated Transport
    Plans (ITPs).
  • A total of R 210 709 was spent and the balance of
    R589 290 is disclosed in the Annual Financial
    Statements.

14
Kei Rail Project
  • The department utilised the remainder of R10 330
    193 from the R28m which was received in 2003/4
    from National Department of Transport.
  • The purpose of funding was to augment the
    provincial voted funds in carrying out the Kei
    Rail project, being a refurbishment of the rail
    line between East London and Umtata.
  • During the financial year the department utilised
    R6 935 479 and the remaining balance of R3 394
    714 is reflected in the Annual Financial
    Statements.

15
Teta
  • An amount of R125 000 was received which is
    funding learnerships related to transport sector.
  • The whole amount was spent subsequent to the
    financial year end.
  • This balance at year end is disclosed in the
    Annual Financial statement.

16
TRANSFER PAYMENTS
17
Corporate governance
  • Risk Management
  • Fraud Prevention
  • Events after the reporting date

18
Summary of reasons for under spending
19
Explanation of Variance
Voted Funds after virement
Actual
Difference
  • Programme 1Administration 83,854 81,189 2,665 3.
    18
  • The saving against this programme is due to
    effective control of expenditure against
    communication, travel and subsistence and
    accommodation costs.
  • Programme 2 Public Transport 117,866 110,072 7,7
    94 6.92
  • The under-spending against this programme is due
    to the fact that the Kei Rail project progressed
    at a less satisfactory pace due to re-location of
    citizens from he rail site at Zamukulungisa
    informal settlement (Mthatha) to a new
    residential area.
  • Programme 3 100,866 98,106 2,750 2.74
  • The saving against this programme is due to the
    curbing of spending especially against payments
    for capital assets in order to assist Provincial
    Treasury in avoiding the provincial deficit.

20
RT at a glimpse
  • The core business of the department is to promote
    an integrated transport system that promotes
    accessibility and mobility. Thus the planning and
    provision of adequate urban and rural transport
    facilities and infrastructure relating to land
    and civil aviation.
  • Thus creating a transport system which will
    provide fully integrated transport operations and
    infrastructure which will best meet the needs of
    its primary customers plus support governments
    strategies for socio-economic development whilst
    being environmentally sustainable.
  • The vote constitutes 5 of the provincial budget
    or R1,714 billion.
  • Funding for the vote comprises R885,303 million
    (51,7) equitable share, R675,330 million (39,4)
    conditional grants and R153,062 million (8,9)
    from own revenue.

21
RT at a glimpse
  • There is an overall growth of 7 from 2004/05
    compared to the first year of the 2005/06 MTEF
    period. This is due to the transfer of Roads
    function from the Department of Public Works to
    the department of Transport. Consequently,
    substantial increases have been recorded in all
    economic classification as a result of the shift.
  • The most significant categories of expenditure
    are Payments for Capital Assets (35), Goods and
    Services (31) followed by Compensation of
    Employees (20).
  • There is a decrease of 13 in Payments for
    Capital Assets, and 3 for Transfers and
    subsidies compared to 2004/05 adjusted budget.
    The decrease in Payments of Capital Assets is due
    to the department shifting funds to maintenance,
    which is part of Goods and Services, hence an
    increase of 57 for Goods and Services.

22
RT at a glimpse
  • 81.2 of the budget has been allocated to
    Programme 4 (Roads Infrastructure), followed by
    Public Transport (9). Programme 4 main driver of
    the departments activities.
  • All programmes increased in their 2005/06 budgets
    compared to the 2004/05 revised allocation with
    Roads Infrastructure remaining constant.
  • The allocations to Municipalities are for
    contractual obligations to pay for workers taken
    over by the Municipalities specifically to
    perform roads functions.
  • A further 250,000 is allocated specifically for
    the HIV/Aids program.

23
Challenges
  • Roads function take-over.
  • Softer Issues around mergers
  • Work ethic / culture
  • Skill levels
  • Own revenue of 8,9 (R153,062 million)
  • Supply chain management fine-tuning
  • Getting the basics right

24
(No Transcript)
25
Overview of Programme 1
26
  • OVERVIEW OF PROGRAMME 1
  • The Programme has been transformed into six sub
    programmes, namely
  • Office of the MEC
  • Management
  • Corporate Support
  • Programme Support
  • Organisational Development
  • Government Fleet Management

27
OVERVIEW OF PROGRAMME 1 The Sub-Programme
Office of the MEC is to provide overall strategic
leadership and policy decisions to all divisions
in the department from which the strategic
objectives will flow. The Sub-Programme
Management is to provide strategic direction of
the department and overall management to ensure
that the policy, projects and commitments set by
the Executing Authority are accomplished. The
Sub-Programme Corporate Support is to manage
financial resources, information systems,
budgeting, expenditure controls, effective
provisioning and asset management and revenue
collection.
28
OVERVIEW OF PROGRAMME 1 The Sub-Programme
Programme Support is to provide efficient human
resources to promote effective management of
information and technology as a strategic
resource and to develop work improvement
procedures and methods. The Sub-Programme
Organisational Development is to influence
departmental policies for advancement of
transformation viz. Affirmative Action,
Employment Equity, Skills Development,
Procurement Policies, etc. The Sub-Programme
Government Fleet Management is To determine and
supply suitable vehicles to user Departments, and
facilitating general hire (pool) vehicle
replacement and to complete the restructuring of
the Government Motor Transport Garages as well
as implementing provincial and national policies
on the provision of government transport by
completing the investigation of the PPP
strategy.
29
  • SERVICE DELIVERY ACHIEVEMENTS

30
  • SERVICE DELIVERY ACHIEVEMENTS

31
  • SERVICE DELIVERY ACHIEVEMENTS

32
  • Administration
  • This was the second year whereby the department
    managed the 5 year contract with Fleet Africa for
    providing Fleet Management services to provincial
    departments.
  • This contract will expire in August 2008.
  • Despite the initial hurdles, substantial
    improvements have
  • occurred during period under review which can
    be contributed to
  • frequent reviews and consultations with line
    departments.
  • Consequently the reporting of misuse of vehicles
    has declined
  • tremendously, compared to previous years.
  •  

33
Human Resource Management
34
Summary of post vacancies and super-numeries
35
Key expenditure indicators
36
Overview of Programme 2
37
PUBLIC TRANSPORT
  • PURPOSE
  • To plan, regulate and facilitate the provision of
    public transport services and infrastructure
    facilities in order to enhance mobility of all
    communities, particularly those without or with
    limited access.

38
  • OVERVIEW OF PROGRAMME 2
  • The Programme has been transformed into seven sub
    programmes, namely
  • Programme Support
  • Planning
  • Infrastructure
  • Empowerment Institutional Management
  • Operator Safety Compliance
  • Regulation Control
  • Civil Aviation

39
OVERVIEW OF PROGRAMME The Sub-Programme
Planning is responsible for developing the
statutory plans required in terms of the National
Land transport Transition Act, 2000 and the
accompanying provincial legislation . The
Sub-Programme Infrastructure is responsible for
designing and implementing the public transport
infrastructure required for providing services in
terms of the plans. The Sub-Programme
Empowerment and Institutional Management is
responsible to ensure that persons in the
industry who provide and manage public transport
are empowered to perform their function and
receive adequate training to enable them to
provide the required level of service
delivery..
40
OVERVIEW OF PROGRAMME The Sub-Programme
Programme Support is to provide efficient human
resources to promote effective management of
information and technology as a strategic
resource and to develop work improvement
procedures and methods. The Sub-Programme
Operator Safety Compliance is to promote and
improve safety on the public transport system and
to enforce compliance with public transport
legislation and regulations as well as the
liaison and co-ordination of provincial safety
and compliance initiatives.. The Sub-Programme
Civil Aviaton The main focus area of the
sub-programme is the provision of management of
air space and airport management services in
terms of the civil aviation act, regulations and
requirements of the international civil aviation
organization (ICAO).
41
SERVICE DELIVERY RESULTS
SUB-PROGRAMME 2.1 PLANNING
42
Specific challenges and responses
43
  • Rural Transport Development Plan.

44
Specific challenges and responses
45
Provincial Land Transport Framework
46
Specific challenges and responses
47
Specific challenges and responses
48
Integrated 5-year Transport Infrastructure Plan.
49
Specific challenges and responses
50
Provincial Rail Committee.
51
Specific challenges and responses
52
  • SUB-PROGRAMME 2.2 INFRASTRUCTURE
  • Financial assistance to local authorities for
    improving transport facilities

53
Specific challenges and responses
54
  • Road Safety Remedial Measures

55
Specific challenges and responses
56
Kei Rail
57
Specific challenges and responses
58
Extension of rail commuter service (Buffalo City
and Nelson Mandela Metro)
59
Specific challenges and responses
60
Pedestrian and Cyclist Facilities
61
Specific challenges and responses
62
SU-PROGRAMME 2.4 EMPOWEREMENT AND INSTITUTIONAL
MANAGEMENT. Complete Restructuring of Mayibuye
63
Issues requiring ongoing attention The process of
restructuring the Mayibuye Transport Corporation
has been running for quite a long time of not
less than three years now without finalisation.
This becomes a matter of great concern as this
delay introduces undue anxiety upon the
stakeholders particularly the workforce. Most of
these delays can be attributed to the chain of
processes which is long.
64
Subsidised Land Passenger Transport
65
Restructuring of Bus Passenger Transport
66
Specific challenges and responses
67
Non Motorised Transport
68
Specific challenges and responses
69
SUB-PROGRAMME 2.5 OPERATOR SAFETY AND COMPLIANCE
  • The Department has not yet pronounced as to where
    this component should be located between Public
    Transport and Traffic Control. It is extremely
    important that this component should be populated
    and its staff to be well equipped to ensure the
    successful implementation of the Recapitalisation
    project and which will be kicking off in earnest
    during the 2005 / 2006 financial year.

70
SUB-PROGRAMME 2.6 REGULATION AND CONTROL
71
SUB-PROGRAMME 2.7 CIVIL AVIATION
72
Specific challenges and responses
73
Overview of Programme 3
74
  • OVERVIEW OF PROGRAMME 3
  • This Programme has two directorates namely
    Traffic Control and Traffic Safety.
  • The Programme has been transformed into six sub
    programmes, namely
  • Programme Support
  • Safety Engineering
  • Traffic Law Enforcement
  • Road Safety Education
  • Traffic Administration and Licensing
  • Overload control

75
OVERVIEW OF PROGRAMME 3 The Directorate
Traffic Control is responsible for Traffic Law
Enforcement Traffic Administration Licensing
and Overload Control. The Directorate Traffic
Safety is responsible for Road Safety Education,
and the Directorate Transport Planning is
responsible for Safety Engineering
76
SUB-PROGRAMME 3.2 SAFETY ENGINEERING
77
  • SUB-PROGRAMME 3.2 SAFETY ENGINEERING
  • Road Safety Audits

78
  • SUB-PROGRAMME 3.2 SAFETY ENGINEERING

Specific challenges and responses
79
SUB-PROGRAMME 3.2 SAFETY ENGINEERING
  • Management of Legal Speed Limits

80
SUB-PROGRAMME 3.3 Traffic Law Enforcement
81
SUB-PROGRAMME 3.3 Traffic Law Enforcement
Traffic Control mainly deals with law
enforcement and all issues governed by the
National Road Traffic Act 93 / I996. The services
are rendered in six districts and head office. In
the districts there are 19 traffic stations that
execute traffic law enforcement, regulate and
control vehicular motor traffic. This is the
most sensitive programme known to the public
because of the day-to-day interaction with
motorised and non-motorised communities. This
programme engages in all aspects of traffic
control and road safety with a view of promoting
a smooth movement of persons and goods in our
province.
82
  • SUB-PROGRAMME 3.3 Traffic Law Enforcement
  • YEAR 2004 / 2005 ACHIEVEMENTS
  • New eNaTIS system being implemented currently
  • Trained staff for NaTIS and eNaTIS
  • Trained twelve officials as trainers
  • Trained 20 Officials from the South African Post
    Office
  • 12 Officials from Post Office currently
    undergoing training
  • Trained 8 officials from KSD Municipality
  • Trained Help Desk Staff
  • Award tender to SAPO contract signed
  • Finalized inventory on all NaTIS centers

83
  • SUB-PROGRAMME 3.3 Traffic Law Enforcement
  • The Arrive Alive Campaign was successfully
    implemented during the peak periods even though
    the department did not receive any financial
    assistance from the National Department of
    Transport.
  • The goal was achieved through joint ventures and
    partnerships with different stakeholders such as
    Municipalities, Community Road Safety Forums,
    SANDF, Emergency Services, Law Enforcement and
    Community Radio Stations.

84
  • SUB-PROGRAMME 3.3 Traffic Law Enforcement
  • Eleven Traffic Officers who obtained their Basic
    Diplomas as Municipal Police Officers at the
    Port Elizabeth Traffic Training College in
    December 2003 as private individual students were
    employed as interns until June 2004 after which
    ten were appointed as permanent staff.
  • Eleven private individuals received bursaries
    from the department in order to undergo the
    basic-training course.

85
SUB-PROGRAMME 3.3 Traffic Law Enforcement
Specific challenges and responses
86
PLEASE ASSIST THE DEPARTMENT - Call Toll Free
information centre 0800 644 644

87
SUB-PROGRAMME 3.4 Road Safety
88
  • SUB-PROGRAMME 3.4 Road Safety
  • 8500 Learner Support Material on Scholar Patrol,
    ABC Posters and Child in Traffic were developed
    and distributed to schools.
  • The following four Community Based Programmes
    were successfully implemented
  • Shakes Mahangu Stray Animal Programme
  • Be Sign Wise
  • Adult Pedestrian and Passenger Safety Programme
  • Driver Training and Education

89
  • SUB-PROGRAMME 3.4 Road Safety
  • Three Wreath Laying Ceremonies were successfully
    implemented to commemorate victims of road
    accidents in the following districts
  • Chris Hani
  • Alfred Nzo
  • Amatole
  • 42 Road Safety Staff attended a six months
    Traffic Safety Management Course which was
    conducted by the University of North West. Out of
    42, 39 has successfully completed the course with
    (nine) distinctions

90
  • SUB-PROGRAMME 3.4 Road Safety
  • 693 schools were reached on Traffic Safety
    Education for Grade R-3 (Foundation Phase)
    through workshops and Teacher Seminars
  • Junior Traffic Training Centres are maintained
    and monitored
  • Out of 258 Scholar Patrol Crossings registered
    42 were withdrawn due to road improvements and
    roads that are no longer hazardous to learners,
    11 new Scholar Patrol Crossings were registered.

91
  • SUB-PROGRAMME 3.4 Road Safety
  • SERVICE DELIVERY OBJECTIVES AND INDICATORS
  • Schools involved in Road Safety Education has
    increased to 35.
  • Build six Junior Traffic Training Centres.
  • Maintain existing (258) Scholar Patrols and
    establish new Scholar Patrol Crossings.
  • 5000 units of learners support material and
    equipment are developed.
  • Four Community Based Programmes are implemented
    and monitored in targeted communities around
    accident-prone areas.
  • Develop Arrive Alive Communication Campaign
    plans for peak periods.
  • Pedestrian Hazardous locations are communicated
    to targeted road users

92
  • SUB-PROGRAMME 3.4 Road Safety
  • SERVICE DELIVERY ACHIEVEMENTS
  • 693 schools were reached on Traffic Safety
    Education for Grade R-3 (Foundation Phase)
    through workshops and Teacher Seminars
  • Junior Traffic Training Centres are maintained
    and monitored
  • Out of 258 Scholar Patrol Crossings registered
    42 were withdrawn due to road improvements and
    roads that are no longer hazardous to learners,
    11 new Scholar Patrol Crossings were registered.
  • 8500 Learner Support Material on Scholar Patrol,
    ABC Posters and Child in Traffic were developed
    and distributed to schools.
  • Four Community Based Programmes which were
    successfully implemented.

93
SUB-PROGRAMME 3.4 Road Safety Specific
challenges and responses Challenge 1
Insufficient funds to implement Road Safety
Education Projects particularly the Arrive Alive
and Scholar Programmes. This has resulted in lack
of appropriate focus towards the critical road
safety projects. Furthermore, it has challenged
the department in its ability to realise its
strategic goal of creating road safety awareness
throughout the province. Response to Challenge 1
Funds were sourced from other Directorates.
Challenge 2 Staff Capacity Road Safety
Officials are unable to travel the widespread
areas that are mostly rural due to the shortage
of resources such as road safety equipment and
vehicles. This requires long travelling hours and
less time for service delivery. The current ratio
for school coverage is 147 schools per staff
member, this number exclude other projects that
also need to be implemented. Response to
challenge 2 Increase budget allocation for Road
Safety is requested from Treasury
94
SUB-PROGRAMME 3.4 Road Safety Specific
challenges and responses Challenge 3 Non
Performance of SMME Local Suppliers Lack of
financial from financial institutions and funding
for local suppliers in rural areas are
constrained in performing some of the required
services.i.e. Four tenders were awarded to
suppliers to build JTTCs and none of them were
able to complete the job. Response to challenge
3 Minimum bank guarantees will be required to
ensure the performance and rendering of services
by suppliers. Challenge 4 Sustainability of
Road Safety Forums and Activities Measures to
extend services by using structures such as Road
Safety Forums in urban and rural areas, and other
Road Safety measures are constrained by Lack of
transport and financial resources measures of
compensation Lack of resources to implement Road
Safety measures such pedestrian
improvement Response to challenge 4Endeavours
are being made to form partnership with private
company to fund Road Safety Projects.
95
  • SUB-PROGRAMME 3.4 Road Safety
  • Issues requiring ongoing attention
  • The use of bakkies as a mode of transportation
    in rural/urban areas is a result of a shortage of
    public transport and is still a burning issue
    that requires ongoing attention.
  • Presently, Road Safety Education Programmes are
    focused on the legally designated public
    transport modes. The challenge is that there is
    an increasing number of road fatalities
    attributed to the informal modes of transport,
    like bakkies etc.

96
  • SUB-PROGRAMME 3.4 Road Safety
  • Issues requiring ongoing attention
  • The unacceptable road user behaviour and road
    accident fatalities are at high levels. This
    requires substantial funding for investing in
    Road Safety Programmes in order to change the
    current situation.
  • According to latest statistics, the population
    of the Province is at 7,5 million with high
    illiteracy level that requires expensive special
    material to address road safety problems and
    impart knowledge and information to these target
    groups.
  • Demands to extend service to most remote areas
    with limited accessibility to information,
    resources and address the population language
    diversity.

97
SUB-PROGRAMME 3.5 Traffic Admin licencing

98
SUB-PROGRAMME 3.5 Traffic Admin licencing

99
SUB-PROGRAMME 3.5 Traffic Admin licencing
Specific challenges and responses
100
SUB-PROGRAMME 3.6 Overload Control
101
SUB-PROGRAMME 3.6 OVERLOAD CONTROL.
102
SUB-PROGRAMME 3.6 Overload Control
Specific challenges and responses  
103
SUB-PROGRAMME 3.6 Overload Control
Transfer payments were made to the following
institutions
104
  • Overloading Hazards
  • PMG note photographs not included, email
    info_at_pmg.org.za

105
POGRAMME 4 Roads
106
Roads Policy clarification Position
  • Funding
  • Target and transformation
  • Labour
  • Skills development
  • Contractor development
  • Maximise impact of CIDB contractor development
    initiative in EC
  • Accelerate contractor registration and
    development in EC (Ixingephi)
  • Type of Infrastructure
  • Access roads to maximise EPWP employment creation
  • Proclaimed provincial roads to maximise
    contractor development and BEE
  • Local resources
  • Minimum requirement for use of local labour
  • Minimum requirement for use of local materials
  • Delivery approach
  • Apply appropriate delivery models for various
    roads categories

 
 
107
Medium to long term approach
  • Road network
  • Align classification with RISFSA
  • Finalise transfers to National (SANRAL)
  • Complete condition assessment
  • Complete needs study (include access roads)
  • Institutional arrangements
  • Set up planning and delivery co-ordination
    structures
  • Apply appropriate service delivery models
    (Public, Private, SMME emerging contractors,
    Vukuzakhe)

 
 
108
Medium to long term (contin)
  • Delivery Capacity
  • SMMEs (contractor development, CIDB register)
  • Labour intensive construction (ILO)
  • Funding
  • Funding strategies and models
  • Integrated funding prioritisation
  • Road Asset Management
  • Implement RMSs

 
 
109
  • Roads Problem Statement
  • Maintenance backlogs R6,5 billion
  • Upgrade backlogs R5,8 billion
  • Re-hab and bridges backlogs R 2,6 billion
  • Focus so far on Eastern regions (6X R/Km)
  • Western now becoming a problem except where
  • AWRMCs are in place
  • Increased maintenance in ten year plan
  • Poor maintenance creates pressure to upgrade
  • Improved in-house maintenance through Area
    wide
  • maintenance contracts.   

110

111
Kei Economic Development Corridor
  • Kei Rail
  • Forestry
  • Agriculture (Maize)
  • Agro-Processing
  • Paper
  • Timber
  • Tourism
  • Umzimvubu Hydro-Electric Project