Wireless Communication Between District Five and District Two Floridas Intelligent Transportation Sy - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Wireless Communication Between District Five and District Two Floridas Intelligent Transportation Sy

Description:

Homeland Security Aspect for Roadway Structure. Vulnerability Assessment ... Cabinets, poles, CCTV and infrared in the field by December. Benefits ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 17
Provided by: to26
Category:

less

Transcript and Presenter's Notes

Title: Wireless Communication Between District Five and District Two Floridas Intelligent Transportation Sy


1
Wireless CommunicationBetweenDistrict Five
and District TwoFloridas Intelligent
Transportation SystemsPresented By Peter
Vega, P.E.
2
iFlorida Driven Project
  • Homeland Security Aspect for Roadway Structure
  • Vulnerability Assessment
  • Fuller Warren Bridge Deployment
  • St. Johns River Bridge Deployment
  • Communication between District Two and Five
  • Coverage at many locales w/ expansion
    capabilities
  • Utilization of existing infrastructure

3
The Plan
  • Concept was to have TMCs and Law Enforcement in
    different regions of the State monitor and
    respond to roadway structures at risk of
    terrorist activity
  • Fuller Warren Bridge
  • High volume, vicinity to downtown and Super
    Bowl
  • St. Johns River Bridge
  • High volume, vicinity to Disney World and
    impact on Orlando economy

4
Field Deployment
  • Devices to be deployed
  • CCTV Cameras
  • Infrared Detection Cameras
  • Detection Algorithm
  • Existing fiber greatly reduced costs, however
    wireless technology considered as an option

5
Network Deployment
  • Hardware utilized
  • Existing network, hubs and switches
  • Existing Microwave tower links on I-95 and I-295
  • With twelve T1 lines
  • VBrick MPEG 2 and 4 Decoders
  • VBrick MPEG 2 and 4 Encoders
  • Alpine Switches

6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
Status
  • Mastec/Metric D/B team selected by District 5
  • Installation concurrent with existing ITS
    projects
  • ETA to completion 3 months
  • 5 areas under Fuller Warren Bridge to be covered
  • 6 areas under St. Johns River bridge covered
  • Cabinets, poles, CCTV and infrared in the field
    by December

11
Benefits
  • Links used during four hurricanes
  • Expansion of capabilities to support
  • Security of critical roadway infrastructure
  • Development of wireless communication

12
Future Impact
  • Expansion of program to other structures
  • Improved interagency communication
  • Improved interagency coordination
  • Transgression to Homeland Security

13
(No Transcript)
14
(No Transcript)
15
Key Participants
  • District Five
  • Larry Rivera, Tushar Patel, Mike Smith, Scott
    Silva
  • District Two
  • Pete Vega, Randy Warden, Kamal Munawar
  • Central Office
  • Nick Adams, Jim Mosser, TGC Staff

16
Questions? Please Contact Peter Vega,
P.E. Florida Department Of Transportation Peter.ve
ga_at_dot.state.fl.us (904) 360-5463 SC 824-5463