Stanford Linear Accelerator Center Environmental Management System (EMS) Process Update - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Stanford Linear Accelerator Center Environmental Management System (EMS) Process Update

Description:

US Department of Energy Laboratories. Richard Cellamare ... Experimental & Supporting Process Equipment - Design, Fabricate, Operate, & Maintain ... – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 11
Provided by: rich95
Category:

less

Transcript and Presenter's Notes

Title: Stanford Linear Accelerator Center Environmental Management System (EMS) Process Update


1
Stanford Linear Accelerator Center
Environmental Management System(EMS) Process
Update
  • March 25, 2004 Tele-Video Conference
  • Information Exchange with
  • US Department of Energy Laboratories
  • Richard Cellamare
  • Waste Minimization/Pollution Prevention
    Coordinator
  • Stanford Linear Accelerator Center

2
Stanford Linear Accelerator Center
  • Operated by Stanford University for DOE
  • Performs research in high energy physics (2-mile
    linear accelerator) disciplines using
    synchrotron radiation

3
SLAC EMS DOE Certification Plan-of-Action (POA)
  • SLAC will be required to have a DOE certified EMS
    in place by 12/31/05 as required by DOE Order
    450.1 (which is a part of the Work Smart
    Standards Set in DOE/Stanford University Contract
    DE-AC03-76-SF00515, most current modification).

4
2004 POA Target Date Status
  • 3/2/04 Draft POA to ESHD AD/DHs - Completed
  • 3/8/04 Revised POA to ESHCC Kick-off
    Presentation - Completed
  • 3/18/04 Formally Appoint EMS Working Group
    (EMSWG) Members - Completed
  • 3/22/04 EMSWG Membership Charter Issued
    Completed
  • 3/24/04 Updated Approved POA to DOE/SSO - Open
  • 3/29/04 DOE/SSO Letter to Director re EMS
    Schedule/Expectations - Open
  • 4/19/04 EMS Goals and Programmatic Documentation
    Drafted for Comment - Open
  • 4/30/04 Finalize Proposed EMS Goals for FY04 (1st
    Development Year) - Open
  • Late May 2004 Peer/Contractor Env. Mgmt. Review
    (Initial Gaps Analysis) - Open
  • 6/1/04 Draft ISMS/EMS Description Document
    Completed - Open
  • 9/20/04 Complete Corrective Action Plans (CAPs)
    /Finish Quick Fixes for EMS Gaps - Open
  • 10/4/04 Complete Final Documentation/Reviews/CAPs
    - Open

5
2005 POA Target Date Status
  • February 2005 EPA Environmental Management Review
    (Gaps Analysis) - Open
  • 1/3/05 Finalize EMS Goals for FY05 (2nd
    Development Year) - Open
  • 2/21/05 Complete CAPs/Finish Quick Fixes for EMS
    Gaps/Validate Completed Corrective Actions (CAs)
    - Open
  • 3/24/05 EMS Package Approved by ESHCC - Open
  • 3/31/05 Final EMS Package Approved by Director -
    Open
  • 5/30/05 Final Approved EMS Package to DOE/SSO -
    Open
  • 6/27-30/05 DOE/SSO DOE/HQ EMS Cert. Review
    (guidance not yet available) - Open
  • 7/25/05 Complete CAPs for DOE EMS Certification
    Review CAs - Open
  • 9/26/05 Complete CAs/long-term Plans - Open
  • 9/30/05 Finalize EMS Goals for FY06 (1st
    Implementation Year) - Open
  • 10/3/05 Final EMS Package to DOE/SSO for Approval
    (DOE Cert. IAW DOE O 450.1) - Open
  • 12/31/05 DOE Certified SLAC EMS Program in Place
    and Implemented - Open

6
General Approaches Resources
  • Using in-house personnel developed an EMS
    Working Group.
  • Environmental Policy will be further developed
    from earlier one.
  • Developing EMS with consideration to existing
    SLAC Integrated Safety Management System.
  • Performing Gaps Analysis with iterations to fine
    tune Targets and Objectives.
  • Using SLAC Environmental Program Managers for
    first-cut Gap Analysis.
  • Using third party consultant and considering EPA
    for subsequent Gap Analysis reviews.
  • Considering use of EMS software to track EMS
    element progress documentation.

7
Preliminary Environmental Aspects Review
  • Products, Services, Activities
  • Our major product is Research under DOE SC
  • Experimental Supporting Process Equipment -
    Design, Fabricate, Operate, Maintain
  • Building Facilities Management Construct,
    Operate, Maintain, Decommission
  • Environmental Aspects
  • Energy Fuel Usage Electricity
  • Water Use
  • Surface Discharges
  • Industrial Wastewater Discharges
  • Hazardous Materials Use
  • Air Emissions Toxics, ODS, GH
  • Hazardous Solid Waste Disposal
  • Remediation Lead, PCBs, Solvents
  • Radiological Wastes LLMW, Metals
  • Moratorium

8
Preliminary EMS Targets Objectives
  • Performance Measures Environmental Metrics
    (Phased Approach)
  • Hazardous Waste Generation
  • Ozone Depleting Substance Phase
  • Total TRI Releases
  • Vehicle Usage
  • PCB Transformer Usage
  • Vehicle Fleet Age
  • Water Consumption Recycling
  • NOx Emissions
  • Electricity Usage
  • Solid Waste Generation
  • Greenhouse Gas Emissions
  • Mixed Waste Reduction
  • Metal Recycling
  • Environmental Aspects
  • Energy Fuel Usage Electricity
  • Water Use
  • Surface Discharges
  • Industrial Wastewater Discharges
  • Hazardous Materials Use
  • Air Emissions Toxics, ODS, GH
  • Hazardous Solid Waste Disposal
  • Remediation Lead, PCBs, Solvents
  • Radiological Wastes LLMW, Metals
  • Moratorium

9
SLAC EMS Chronology 2001-02
  • 2001 DOE Notice 450.4 Assignment of
    Responsibilities for Executive Order (EO) 13148,
    Greening the Govt through Leadership In
    Environmental Management.
  • 2001 Chemical Management Regulatory Review
    Regulatory requirements for SLAC were reviewed in
    detail.
  • 2001 Pollution Prevention and Energy Efficiency
    (P2/E2) Plan SLAC developed in response to DOE
    P2/E2 Leadership Goals for Fiscal Year 2000 and
    Beyond.
  • 2001 DOE EMS Self-Assessment Questionnaire
    SLAC identifies an EMS strategy based on
    incorporation within the ISMS process.
  • 2002 ISMS Phase 3 SLAC provided increased
    focus on evaluating ISMS in terms of performance
    measures and developed more focused training of
    managers on ISMS process implementation.
  • 2002 Request for Information (RFI) An RFI was
    issued to 15 vendors responses were evaluated
    selected the Chemical Management Services (CMS)
    alternative rather than the Chemical Management
    Information Systems (CMIS) alternative.
  • 2002 Environmental Data Management System (EDMS)
    Scoped the Environmental Protection Program
    data management needs preliminary discussions
    were held with 11 vendors to discuss capabilities
    and software offerings.

10
SLAC EMS Chronology 2003-Present
  • 2003 DOE Order 450.1 Environmental Protection
    Program is the first DOE Directive focused on
    having an EMS program as a part of the contractor
    requirements.
  • 2003 CMS Source Selection Board (SSB) and
    Request for Proposal (RFP) A selection board
    was appointed and an RFP issued to about 10
    vendors a bidders conference was held.
  • 2003 SLAC makes progress toward meeting P2/E2
    Goals/Commitments for hazardous waste reduction,
    solid waste recycling, ODS, TRI Chemicals,
    electric vehicle usage.
  • 2003 SLAC initiates more formalized development
    of an EMS in response to DOE Order 450.1 EO
    13148.
  • 2003 EDMS RFI Issued RFI to 11 vendors and
    several vendors made on-site presentations.
  • 2003 EDMS System Selection From RFI responses
    and discussion with LLNL, Application Service
    Provider-type data management system was
    selected an RFP was issued to 4 vendors a
    contract award was made to Locus Technologies.
  • 2004 CMS Implementation The formal SSB
    selection report for a CMS contract SLAC Source
    Selection Official approved.