INDIAN ROAD NETWORK
Total Length 33 lakh km
Length (km)
National Highways 66,590
Expressways 200
State Highways 1,31,899
Major District Roads 4,67,763
Rural Roads 26,50,000
  • Roads carry 85 of passenger 70 of freight
    traffic
  • National Highways constitute only 2 of length,
    but carry 40 of
  • the traffic on Indian Roads.

2
NATIONAL HIGHWAYS STATUS
Total Length 66,590 km Total Length 66,590 km
of Total length
Four laned and more with divided carriageway 10
Two laned 55
Single laned and intermediate 35
  • Normal distance traveled by trucks in India is
    250-300 km per day where as the international
    norm is 600-800 km per day
  • Require immediate capacity augmentation and
    upgradation with enhanced safety features
  • State Govt. are being persuaded to have
    integrated check posts on Highways.
  • NHAI is modernizing the Toll Collection System to
    cut down waiting time at Toll Plazas.

3
Transportation projects in India
4
India- Transportation projects
  • Road Projects
  • Metro Projects
  • BRTS- Bus Rapid Transport System
  • Monorail
  • Other systems like Pod Taxi, Light Rail, etc

5
Road Projects in India
  • Basically it is undertaken by National Highways
    Authority of India (NHAI) under various
    development projects- NHDP in phases

NHDP Phase Particulars Length Indicative Cost Rs ( in crores)
NHDP-I II Balance work of Golden Quadrilateral and EW-NS corridors 13,000 km (8,100 mi) 42,000
NHDP-III 4-laning 10,000 km (6,200 mi) 55,000
NHDP-IV 2-laning 20,000 km (12,000 mi) 25,000
NHDP-V 6-laning of selected stretches 5,000 km (3,100 mi) 17,500
NHDP-VI Development of expressways 1,000 km (620 mi) 15,000
NHDP-VII Ring Roads, Bypasses, Grade Separators, Service Roads etc. 700 km (430 mi) 15,000
Total 45,000 km (28,000 mi) 1,69,500 (Revised to 2,20,000)
6
Golden Quadrilateral EW, NS- Phase I, II
corridors
7
(No Transcript)
8
Existing Major Expressways in the Country
  • Ahmedabad-Vadodara Expressway
  • 4-lane dual carriageway expressway and length of
    92.85 km (First expressway of India)

9
Existing Major Expressways

  • 2. Delhi-Gurgaon Exwy
  • 3. Delhi-Noida Direct Flyway

10
Existing Major Expressways
  • Mumbai-Pune Expressway
  • India's first 6-lane, concrete, highspeed,
    tolled, access controlled expressway. (2001)
  • Total length is 93 km
  • Yamuna expressway- Latest expressway to be
    completed 8 lane concrete expressway
  • Noida to Agra (165 kms)
  • Speed limit is 120 kmph- fastest ever in India.
  • Photo shows its intersection with Delhi-Agra
    highway

11
Other expressways in India
  • Durgapur Expressway
  • Belghoria Expressway
  • Durg- Raipur expway
  • Kundli-Manesar-Palwal Expressway(KMP) (u/c)
  • Eastern Peripheral Expressway (Delhi) (u/c)
  • Shimla-Chandigarh Expressway (Kalka Bypass)-
    first hill expressway of India- completed in 2011

Kalka bypass- Indias first Hill Expressway
12
Urban Transportation projects in India
13
Metro projects
  • Kolkata metro- Indias first metro (completed in
    1991).
  • Single line of 22 kms with 18 stations (partly
    elevated, partly underground is operational.
  • Built and operated, maintained by Indian
    Railways.
  • Now phase II (Howrah maidan to Salt Lake V) under
    construction.
  • Total 6 phases planned.

14
Delhi metro
  • Rapid transit system serving the capital
  • Built by DMRC- special purpose vehicle.
  • 4 phases- 2 completed, 2 under construction.

15
(No Transcript)
16
Chennai metro (under constrn)
17
Chennai metro
  • Phase I (45 km) under construction, expected to
    be completed by 2014. (partially underground,
    partially elevated).
  • Line 1 - Tiruvottiyur to Chennai Airport 32 km
  • Line 2- Chennai central to St Thomas 22 km
  • Line 3- Mogappir to Tiruvanmiyur (planned)

18
Mumbai metro (under construction)
19
Mumbai metro
  • Total 3 phases (totalling 149 kms proposed).
    Total 3 legs planned in 1st phase.
  • Leg 1- From Versova to Ghatkopar via Andheri
    (East-west corridor). It is fully elevated
    corridor.
  • Highly delayed metro project- Leg 1 of Phase 1
    (13 km) under construction.

20
Hyderabad metro
  • Construction began in 2011.
  • Phase I of the project includes 3 lines covering
    71 km
  • Red Line Miyapur L B Nagar (30 kms)
  • Blue Line Nagole Shilparamam (26.5 kms)
  • Green Line JBS Falaknuma (14.78 kms)

21
Bangalore metro
  • Namma metro started operations over a small
    stretch (9 kms elevated) in 2011.
  • Remaining stretch (total 41 km of Phase 1) under
    construction.

22
Jaipur metro
  • Construction in Two Phases (total 35 kms)
  • Green Line (Mansarovar - Badi Chaupar) 9.25
    km-work in progress (completion by Jun 2013).
    This is mostly elevated but partially
    underground.
  • Orange Line (Sitapura Industrial Area -
    Ambabari)- it will connect Airport.
  • Jaipur metro Jaipur dedicated elevated BRTS
    corridor would run on double decker bridge under
    construction as shown in photo below.

23
Gurgaon metro
  • Rapid Metro Rail Gurgaon (RMRG) of 6.7 km is
    under construction.
  • Indias first privately owned metro.
  • Links Sikandarpura station of Delhi metro with
    DLF city in Gurgaon in a loop fashion.
  • Elevated corridor besides NH 8
  • To be operational by July 2013.

24
Monorail systems in India
  • Mumbai Monorail- Indias first monorail project
  • Jacob circle- Wadala- Chembur monorail (total 20
    kms)
  • First part (Wadala to Chembur- 11 kms) Expected
    to be operational by Dec 2012.
  • Top speed 80 kmph, average speed 65 kmph
  • Capacity 500 pax/train.
  • Monorail is ideal for quick transport with lesser
    capacity less space requirement.
  • Other Monorail systems are planned in Calicut,
    Trivendrum, Chennai, Guwahati Aizawl.

25
BRTS- Bus Rapid Transit System
  • BRTS is of use only if built with proper
    planning.
  • Pune- Indias first BRT corridor (Swargate to
    Katraj- 7 kms)
  • It is invocating poor response from road users.

26
Ahmedabad BRTS
  • It is most successful BRTS project in India.
  • First phase RTO to Kankaria Lake 44.5 km is
    operational.

27
Delhi BRTS
  • The construction work was started during CWG
    games in 2010.
  • 115 km of BRTS route is under construction.
  • It is invoking criticism with car users but is
    being popular with bus users.
  • Several BRTS systems are under construction in
    other cities like Surat, Chennai, Bangalore,
    Jaipur etc.
  • In Jaipur, there is earmarking of an elevated
    stretch only for BRTS buses.

28
Gurgaon POD taxi Project
29
Assignment 1
  • Prepare a 8-10 report on various transportation
    projects going on in your native state. Each
    project must have the following minimum details
  • Project summary
  • Cost, phase details, total length
  • Funding details,
  • economic evaluation details
  • Construction company
  • Submission dead line Thursday (2nd August,2012)
    in CE 626 Class