SCM Roundtable - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

SCM Roundtable

Description:

Sub-contracted manufacturing. Purchase external capacity, send raw materials . Create from contract delivery schedule. So contract can plan the orders ... – PowerPoint PPT presentation

Number of Views:65
Avg rating:3.0/5.0
Slides: 18
Provided by: adamp3
Category:
Tags: scm | roundtable

less

Transcript and Presenter's Notes

Title: SCM Roundtable


1
(No Transcript)
2
SCM Roundtable
  • Adam Prince,
  • Director of Product Marketing
  • iScala Supply Chain

3
Discussion Framework
  • Where we came from
  • Recap of iScala 2.2 key features
  • Where we are now
  • Brief summary of iScala 2.3 key features
  • In the pipeline
  • Review of features planned in iScala 2.3 HF
  • iScala SCM Roadmap Possibilities
  • Areas being considered for priority development
  • Your topics

4
Feedback from 2005 roundtable
  • CWH
  • You said
  • Take the best of CWH and use it elsewhere
  • We did
  • Common picking module
  • Locking sales etc during picking

5
Feedback from 2005 roundtable
  • Lead Time Model
  • You said
  • Make it simpler to use
  • LTM to work with ATP
  • We did
  • Improved UI,
  • User definable milestones,
  • LTM now integration to ATP

6
Feedback from 2005 roundtable
  • MRP
  • You said
  • Make it possible to use MRP against CWH
  • We did
  • MRP can now create requisition
  • Requisition from CWH planned in iScala 2.3 HF

7
iScala 2.2 SCM Highlights
  • Central Warehouse
  • Direct delivery or via trade company
  • Automated inter-company invoicing
  • Currency and tax aware
  • Requisition Management
  • Separate the demand and fulfillment roles
  • Link to CWH, MRP, SRP
  • Graphical BoM Management
  • Faster, simpler engineering management
  • LTM

8
iScala 2.3 SCM Highlights
  • iScala Collect
  • Bar-code/data collection/WMS
  • Common picking module
  • Basis for common, efficient warehouse process
  • Stock Transfer orders
  • To plan inter-warehouse activity
  • Sales Contracts
  • Call off against a contract for price,
    reservation or both
  • Sub-contracted manufacturing
  • Purchase external capacity, send raw materials
    .
  • Graphical MPC BoM Enhancements
  • Create new BoMs, work with A or O BoMs .

9
Hot-Fix SCM Highlights
  • Forecast Consumption
  • Control how to smooth demand against forecast and
    avoid peaks in production
  • Firm Planned Orders
  • For MPS and MRP, prevent fixed orders being lost
  • MPC Planning Time Fence
  • Define the fence explicitly, within the time
    fence get actions
  • Graphical RccP
  • Enhanced usability for rough cut information
  • Disassembly work orders
  • Plan to break down an item, with expected scrap
    etc
  • Item substitute and phase out in MPC
  • Use up old stock or find substitutes for
    expedited activity

10
Goods In Transit
  • Goods in Transit Quantity Tracking
  • Track goods in transit between locations
  • Stock Transfer Orders, Sales Orders, Purchase
    Orders, Service Orders
  • Track actual dates and times
  • Link to Lead Time Management
  • Statistics for planned and actual
  • Rank suppliers, customers, warehouses, work
    centers etc
  • Up-stream auto adjustments as needed
  • Link to stock planning (ATP, K screens etc)
  • Goods in Transit Accounting
  • Account for the goods in transit
  • Record any losses in transit

11
License Plating
12
Example UofM Hierachy
13
License Plating
  • A referenceable item can
  • Be part of an order
  • Sales , purchase, service or work order
  • Contain items from multiple orders
  • Many to Many relationship
  • Be part of a UofM hierarchy (case of cans)
  • Move as a single entity
  • Be received or picked without unpacking
  • Have costs allocated
  • Have items added or removed
  • Have unlimited nesting
  • Have unique ID (bar-code or RFID)

14
DRP
  • Distribution Requirement Planning
  • Identifying net time phased requirements
  • Based on MRP logic
  • Within a single company
  • Across multiple iScala companies
  • Could be built using
  • MRP/SRP logic
  • Central Warehouse inventory visibility
  • Stock Transfer Orders and LTM
  • Requisitions to move goods between companies
  • Could support
  • Warehouse replenishment based on min or safety
    stock
  • Bulk and forward flow bins

15
Delivery Schedules Contracts
  • Sales Orders
  • Create from contract delivery schedule
  • So contract can plan the orders
  • Delivery schedules per sales order line
  • Purchase Orders
  • Create blanket purchase contracts and have
    call-off by purchase orders
  • Delivery schedule per purchase order line

16
Supply Chain Dashboard
  • Out of the box standard KPIs based on SCORE
  • Can be analyzed (drill-down)
  • Can be shared (e-mail etc)
  • OLAP data based
  • New tool to simplify OLAP creation
  • Portal based solution
  • Access anywhere
  • Extensible solution
  • Add additional web parts as needed
  • Basis of users home page

17
OEM/3RD Party Integration
  • Testing Management
  • Inspect and test goods in
  • Manage sampling and test planning
  • Manage tests and capture results
  • Update iScala QA status as tests occur
  • CAD/CAM
  • Import/Export MPC BoMs
  • View design, open design tool from within iScala
  • Forecasting of sales and inventory requirements
  • Based on statistical methods
  • Link to create POs, Manufacturing via SRP/MPS/MRP
Write a Comment
User Comments (0)
About PowerShow.com