SUNCOR ENERGY (U.S.A.) PIPELINE COMPANY Rocky Mountain Crude System Expansion Project History The 10-inch pipeline from Cheyenne to Commerce City was built in 1948 ... – PowerPoint PPT presentation

Number of Views:164
Avg rating:3.0/5.0
Slides: 13
Provided by: Raenell
Category:

less

Transcript and Presenter's Notes

Title: SUNCOR ENERGY (U.S.A.) PIPELINE COMPANY Rocky Mountain Crude System Expansion Project


1
SUNCOR ENERGY (U.S.A.)PIPELINE COMPANYRocky
Mountain CrudeSystem Expansion Project
2
Who is Suncor?
  • Overview
  • Suncor Energy (U.S.A.) Pipeline Company is a
  • subsidiary of the public corporation Suncor
    Energy (U.S.A.) Inc.
  • Suncor Pipeline
  • Operates Rocky Mountain Crude Pipeline from
    Guernsey, WY to Commerce City, CO
  • Employs approximately 23 people in Laramie County
  • Owns assets of approximately 98 million

3
History
  • The 10-inch pipeline from Cheyenne to Commerce
    City was built in 1948
  • Conoco sold the pipeline system to Suncor Energy
    in August 2003

4
Rocky Mountain Crude System Expansion Project
Description
  • Includes a new 16 inch pipeline from Cheyenne to
    Commerce City
  • 8.7 miles in Laramie County
  • New pipeline will parallel existing 10 pipeline,
    where possible
  • Pipeline is designed and constructed in
    accordance with Federal, State and local standards

5
Project Route
6
Pipeline Construction
  • Pipeline workspace is typically 100 feet wide.
  • Minimum depth of cover is 3-6 (42)
  • 3 fenced valves sites are within Laramie County.
  • South of I-80
  • South of College Drive
  • North of Hwy 85
  • Pipe storage yard and major contractor staging
    yards are all located in Colorado

7
Pipeline Construction Sequence
  • Surveying and Layout
  • Grubbing and Topsoil removal and stockpiling
  • Trenching
  • Pipe Stringing
  • Welding
  • Non-Destructive Testing
  • Lowering Pipe in the Trench
  • Backfilling
  • Hydro testing
  • Final Grading
  • Reclamation

8
Pipeline Construction Sequence
9
Pipeline Construction Sequence Photos
10
Horizontal Bores
  • Bores are typically used to allow construction of
    a pipeline under an obstruction such as a road,
    canal, stream, etc.
  • The advantage of a bore is the activity taking
    place above ground is not affected by the boring
    process.

11
Horizontal Bore Locations
  • I-80
  • Fox Farm Road
  • Allison Draw
  • College Drive
  • Hwy 85

12
Operational Emergency Response
  • US DOT required Response Plan
  • Trained personnel
  • Emergency response equipment in Cheyenne
  • Aerial line patrols biweekly
  • Pipeline monitored by computerized leak detection
    system
  • Integrity Management
  • Operator Qualification