Title: Point Engineering Limited


1
1
Point Engineering Limited
Corporate Profile
www.pointengineering.com
A Mark of great impact
2
2
Point Engineering Limited
CONTENTS
  • COMPANY CONTACT ADDRESSES
  • COMPANY OVERVIEW
  • CORPORATE MISSION VISION STATEMENTS
  • CORPORATE STRUCTURE AFFILIATIONS
  • SCOPE OF ENGINEERING SERVICES
  • CASHES POLICY
  • QUALITY POLICY
  • ULTRAMODERN OFFICE FACILITIES
  • PROJECT EXPERIENCES

www.pointengineering.com
A Mark of great impact
3
3
Point Engineering Limited
COMPANY CONTACT ADDRESSES
Point Engineering Limited (PEL)s head office is
located in Port Harcourt, Rivers State with
Liaison Offices in Lagos and Eket, Akwa-Ibom
State.
Main Office Point Engineering Limited FONTE
House, 1 Temple Ejekwu Close Behind Texaco
Filling Station First Artillery, Port
Harcourt Rivers State P.O.BOX, 13595 Port
Harcourt Tel 234 84 - 611963 Fax 234 84 -
612008 E-mail Info_at_pointengineering.com Website
www.pointengineering.com
Lagos Address Point Engineering Limited 2nd
Floor, NIM Building Plot 22, Idowu Taylor Street,
Victoria Island Lagos Tel 234 1 5558602,
2626635, 2626636 Fax 234 1 5558602 E-mail
Info_at_pointengineering.com Website
www.pointengineering.com
Eket Address Point Engineering Limited Block 3,
Usua Amanam Estate Eket Oron Road, Eket,
Akwa-Ibom State Tel 234 8023469400 Fax 234
84 - 612008 E-mail Info_at_pointengineering.com Web
site www.pointengineering.com
www.pointengineering.com
A Mark of great impact
4
4
Point Engineering Limited
COMPANY OVERVIEW
Point Engineering Limited (PEL) is an independent
and wholly (100) indigenous engineering
consultancy company dedicated to providing
responsive high quality and cost-effective
services to clients, who are mainly in the oil
and gas production, gas processing and oil
refining industries. Point Engineering Limited
was formed in 1995, started business in 1997 and
active operations in 2000 with a dedicated team
of mechanical, process, civil/structural,
instrumentation and electrical engineers. Since
then, the company has evolved into a full
multi-disciplinary consultancy group working on
contracts varying in size from individual
assignments to over 20,000 man-hours. Our
philosophy is to provide innovative, cost
effective solutions, on time, within budget and
develop a relationship with our clients for
mutual respect, whereby our professional approach
places us first on the list when considering new
tasks or technologies. We undertake a wide range
of Engineering and Project management tasks for
oil exploration and production facilities, gas
production and processing facilities, separation,
liquefaction and oil refining. Projects
executed include study, analysis, engineering
(front-end and detailed), procurement assistance
and project management services. We have worked
and can still work under a number of contractual
arrangements including Reimbursable, Target
Price, Lump Sum, Service and Frame Contracts
depending on the nature of the project assignment
and clients preference. Our approach is always
flexible and whilst we prefer to be contracted
directly with the main client, in order to
achieve the clients goal, we do engage in
sub-contract and/or consortium arrangements in
order to draw synergy together in meeting
clients requirements.
www.pointengineering.com
A Mark of great impact
5
5
Point Engineering Limited
CORPORATE MISSION VISION STATEMENTS
OUR VISION IS
To be a reference POINT in turning Engineering
Concepts into Reality in the Nigerian Oil and Gas
Sector.
OUR MISSION IS
To prove a POINT for indigenous participation in
the Nigerian Oil and Gas Sector by providing
complete quality assured engineering services
capable of satisfying the most stringent
requirements of our clients wherever it is
required using the best available technical
skills.
www.pointengineering.com
A Mark of great impact
6
6
Point Engineering Limited
CORPORATE STRUCTURE AFFILIATION
www.pointengineering.com
A Mark of great impact
7
7
Point Engineering Limited
Our Corporate Structure is as follows
PROPOSALS/ CONTRACTS ENGINEERS
PIPING / PIPELINE ENGINEERS
A Mark of great impact
www.pointengineering.com
6
8
8
Point Engineering Limited
  • AFFILIATES
  • In order to pull synergy for effective execution
    of projects in the Nigerian Oil and Gas Industry,
    Point Engineering has enter into strategic
    technical alliances with the following companies
  • Berwanger Inc., of 4615 Southwest Freeway, Suite
    900, Houston, Texas, USA
  • MSL Services Corporation, of 11111 Katy Freeway,
    Suite 620, Houston, Texas 77079, USA
  • Foster Wheeler (Nigeria) Limited, 12A (Plot
    296B), Akin Olugbade street, Victoria Island,
    Lagos

www.pointengineering.com
A Mark of great impact
6
9
9
Point Engineering Limited
SCOPE OF ENGINEERING SERVICES
We have the capability to handle projects from
initial feasibility phase right through to
design, implementation and commissioning. Also,
we can provide assistance at a particular stage
of the project cycle according to clients
requirements. We undertake various kinds of
projects which are categorized as follows
www.pointengineering.com
A Mark of great impact
10
10
Point Engineering Limited
CASHES POLICY
The management of Point Engineering Limited is
totally committed to the following Community
Affairs, Safety, Health, Environment and Security
(CASHES) Policy
  • to take all reasonable measures to make
    personnel, information and facilities secure
    minimize the effect of any operation to the host
    community, minimize injuries at the workplace and
    minimize environmental damage.
  • to be sensitive to the needs and concerns of all
    host communities.
  • to establish and maintain standards for community
    affairs, safety, health, the environment and
    security within the Company which adhere to all
    relevant aspects of applicable laws and meet the
    high standards applicable to the industry.
  • to ensure that all Company personnel are given
    the necessary information, instruction and
    training to enable them to work in a secure and
    safe manner so that they understand and can
    fulfill their responsibilities with regard to
    Community Affairs, Safety, Health, Environmental
    and Security requirements.
  • to ensure that safety is an integral part of all
    the work performed by the Company.

www.pointengineering.com
A Mark of great impact
11
11
Point Engineering Limited
QUALITY POLICY
The management of Point Engineering Limited is
totally committed to the following Quality
Policy and Objectives
  • to achieve a quality service by meeting
    customers requirements.
  • to define and document the Quality System for
    all functions of the company to comply with the
    requirements of ISO 9001 latest edition.
  • to develop and use qualified personnel, trained
    with the necessary skills and experience to
    perform their duties.
  • to perform in accordance with the documented
    Quality System with the aim of developing all
    products and services correctly the first time.
  • to ensure that services and products provided by
    Point Engineering are in accordance with the
    contract, safety and legislative requirements.
  • to ensure that quality activities are specified
    to suppliers to maintain the overall level of
    quality of the project.
  • to continually evaluate the Quality Systems
    suitability and monitor its operation to improve
    its effectiveness.

www.pointengineering.com
A Mark of great impact
12
12
Point Engineering Limited
ULTRA MODERN FACILITIES
OFFICE STRUCTURE Point Engineering Limited
currently operates and executes projects in an
ultra-modern office in the central city of Niger
Delta region, Port Harcourt, Rivers State. This
office, which is the head office is conveniently
located along the Port Harcourt Aba Express
Road. PEL also operates in a well-equipped branch
office at Eket, Akwa-Ibom State, and Victoria
Island, Lagos, mainly for Mobil, projects. We
currently occupy about 600 m2 of space at FONTE
House (1st 2nd floors), Port Harcourt and 200
m2 of space at the Usua Amanam Estate (Block 3),
Eket. The offices are fully furnished and
equipped with state-of-the-art facilities
including complete communication systems,
computer software and hardware facilities with a
Local Area Computer Network system. The offices
(Head and Branch) are provided with a standby 40
KVA and 27 KVA power generator sets respectively,
to power the office facilities whenever there is
power supply failure from NEPA. We also have four
brand new executive cars and available for use as
official/pool cars.
www.pointengineering.com
A Mark of great impact
13
13
Point Engineering Limited
The following Tables summarize various
categories of our office facilities
www.pointengineering.com
A Mark of great impact
14
14
Point Engineering Limited
www.pointengineering.com
A Mark of great impact
15
15
Point Engineering Limited
www.pointengineering.com
A Mark of great impact
16
16
Point Engineering Limited
PELs COMPUTER FACILITIES - SOFTWARE CONTD
www.pointengineering.com
A Mark of great impact
17
17
Point Engineering Limited
E-Mail Facilities info_at_pointengineering.com Web
site www.pointengineering.com Engineering
Library Comprises of Professional Textbooks
and Journals Engineering Standards and Codes -
API, DEPs, etc. Regulatory Guidelines - DPR,
FEPA, etc. QA/QC Procedures Training Manuals,
etc. Sample Project Deliverables Others/Miscellan
eous 40KVA Perkins Power Generating Set 27KVA
Perkins Power Generating Set 15 Qty of 2HP Air
conditioners 10 Qty of 1HP Air conditioners Comput
er Network System
www.pointengineering.com
A Mark of great impact
18
18
Point Engineering Limited
PROJECT EXPERIENCE
  • Point Engineering Limited has a proven track
    record in providing qualitative and cost
    effective engineering and project management
    services to clients specifications, on schedule
    and within budget. We have worked on various
    engineering projects for major oil and gas
    companies both on / offshore in Nigeria. The
    following are some major companies we have either
    worked directly or indirectly (as sub-contractor)
    for in Nigeria
  • Mobil Producing Nigeria Unlimited (both Lagos and
    Eket Divisions)
  • Shell Petroleum Development Company (both Western
    and Eastern Divisions)
  • Shell Nigeria Gas Limited
  • Nigeria Agip Oil Company
  • AMNI International Limited
  • Daewoo Nigeria Limited
  • ELF Nigeria Limited
  • Ozono Nigeria Limted
  • Oiltest Well Service Limited
  • ENERCO Nigeria Limited
  • The table overleaf provides a list of some
    projects successfully executed by Point
    Engineering Limited.

www.pointengineering.com
A Mark of great impact
19
19
Point Engineering Limited
The sheets attached overleaf contain brief
description of some of the key projects
previously executed by Point Engineering Limited
www.pointengineering.com
A Mark of great impact
20
20
Point Engineering Limited
The Etim field is located offshore Akwa Ibom
State, Nigeria in the OML 67 area of the Bight of
Biafra. It is south of Company's, Qua Iboe
Terminal (QIT) shore base. Water depths range
from 100 - 120 ft MLW. Etim D is a wellhead
platform installed by MPN in its OML 67. It is
planned that production from Etim D wells will be
transported through a 14 Full Well Stream
pipeline to the Etim Production Platform (Etim
PP) for primary separation. The Etim D production
stream will thus co-mingle with other production
streams (Etim A and B) at Etim PP upstream of the
production separator. The project objective is
to Develop "Issue for Design" (IFD) quality
drawings, calculations, analyses, studies, and
reports for the topsides piping, deck extension
to accommodate 14 receiver, and riser location
at Etim PP for the 14" Etim D to Etim PP full
well stream pipeline. Consider the FEED for some
other projects (EAPM LP FEED) previously
completed that affect Etim PP and develop the
design to be compatible with the planned
modifications.
Etim PP Top Sides and Tie-in Study for Pig
Receiver
Client Name MPN, Lagos Location Etim Offshore
Platform Date Sept. 2004 January 2005 Contract
Type Reimbusable, Basic Engineering
Client Contact Deepesh Kaushish Deepesh.kaushish_at_
exxonmobil.com
A Mark of great impact
www.pointengineering.com
21
21
Point Engineering Limited
The SPDC Server Consolidation Upgrade as well
as the Enterprise Storage Systems (ESS) projects
were initiated to provide hosting for SPDC
applications and databases, while reducing the
total cost of ownership of the server storage
infrastructure. These projects are introducing
new high-end servers and storage devices that
need to be hosted within the P-Harcourt data
center. The resultant load requirements for these
high-end servers and storage infrastructures
cannot be accommodated by the existing utilities
configuration. The work involves capacity check
of the existing power system in order to
ascertain its adequacy to meet the additional
load requirement of the proposed power
network, carry out detailed design of a reliable
system that will efficiently accommodate the
required loads with reasonable level of spare
capacity, identify the best tie-in points and
propose a modification that would minimize shut
down time for the operating loads before hook up
to the new system.
Detailed Design of Electrical Utilities for Port
Harcourt Data Center
Client Name SPDC, Eastern Division Location
Shell IA, Port Harcourt Date October 2004
February 2005 Contract Type Lumpsum, Detail
Engineering
Client Contact Ali Mastrouk Ali.mastrouk_at_shell.co
m
A Mark of great impact
www.pointengineering.com
22
22
Point Engineering Limited
Detailed Design for Extension Work for BRT Diesel
Refill System
This is a follow up to the basic engineering
earlier carried out for MPN in 2002 by Point
Engineering. This scope of the project is the
provision of detailed engineering design for the
replacement / relocation of BRT Diesel re-fill
piping and accessories from the small Boat Dock
to the products Loading Dock. The work entails
piping modifications, and civil/structural
designs. Point Engineering Limited carried out
necessary piping hydraulics, civil/structural,
designs that will enable the replacement /
relocation of BRT Diesel re-fill piping and
accessories from the small Boat Dock to the
products Loading Dock
Client Name MPN Lagos Location Bonny River
Terminal Date Dec. 2004 February 2005 Contract
Type Reimbursable, Detail Engineering
Client Contact Deepesh Kaushish Deepesh.kaushish_at_
exxonmobil.com
A Mark of great impact
www.pointengineering.com
23
23
Point Engineering Limited
The objective of this detailed engineering is for
the restoration of the Glycol Dehydration Unit
(GDU), located on Edop Production Platform
offshore Eket, to its original design intent and
in compliance with MPN Master Specification, DIM
and industry standards where practical. MPN
contracted Point Engineering Limited (PEL) to
carry out the Detailed Design Engineering works
necessary for the restoration of the Tri-ethylene
Glycol (TEG) Dehydration Unit. The detailed
engineering design works performed by PEL
reviewed the Edop Glycol Unit Assessment Report
of June 2003 in addition to carrying out detailed
engineering activities to provide a
fit-for-purpose IFC package necessary for
obtaining cost and schedule estimates for the
Construction Contractor.
Detailed Engineering Design for Edop TEG
Restoration
Client Name MPN, Lagos Location Edop Offshore
Platform Date June. 2004 September
2004 Contract Type Reimbusable, Detail
Engineering
Client Contact Deepesh Kaushish Deepesh.kaushish_at_
exxonmobil.com
A Mark of great impact
www.pointengineering.com
24
24
Point Engineering Limited
Edop 12 is a minimum facility, single well,
wellhead platform that is supported from the
single well conductor. This well produces over
4000 Barrels of crude oil per day, flowing
through Edop C which is located in the Gulf of
Guinea, Nigeria. The facility has a hexagonal
shaped boat landing deck supported from the
single conductor at an elevation of 5ft above
Mean Low Sea Level. The platform is also equipped
with a 2 Long Ton lifting device and structure to
transfer material from boats to the platform, and
vise versa. However, the boat landing is fully
submerged at the time of the year when the tide
is high, thus preventing personnel access to the
platform from a boat. Also the 2 Long Ton lifting
device, of the well head platform appears
marginal and as such not fit for purpose. Point
Engineering Limited performed the detailed
engineering design for the provision of
additional, round the year, functional boat
landings at respective levels and the
modification of the lifting device to address its
inefficiency
Detailed Design for Edop 12C Platform Lifting
Device and Boat Landing Upgrade
Client Name MPN, Lagos Location Edop 12C
Offshore Platform Date August 2004 November
2004 Contract Type Reimbusable, Detail
Engineering
Client Contact Deepesh Kaushish Deepesh.kaushish_at_
exxonmobil.com
A Mark of great impact
www.pointengineering.com
25
25
Point Engineering Limited
  • In respect of the fire incident that occurred in
    April, 2003 on the OSO Gas Compression (RG)
    Platform main deck in which the LPA Turbine
    Package located on the south end of Oso RG
    Platform was damaged, MPN issued a work order to
    PEL to carryout detailed engineering design for
    the replacement of this damaged turbine package
    with an identical unit.
  • The replacement of this LPA Turbine Package
    involve various work activities which were
    segregated into seven (7) workpacks as presented
    below
  • Installation of new shutdown valve
  • Rerouting of start gas exhaust
  • Installation of seal leakage drain
  • Repair or replacement of damaged valves and
    piping
  • Piping demolition and reinstallation for skid
    replacement
  • Repair of exhaust duct insulation
  • Inspection and cleaning of equipment and piping
  • The detailed design was successfully carried out
    on time and within budget.

Detailed Design for Oso RG LPA Turbine Replacement
Client Name MPN, Lagos Location Oso Offshore
Platform Date August 2004 December
2004 Contract Type Reimbusable, Detail
Engineering
Client Contact Mike Attah Michael.e.attah_at_exxonmo
bil.com
A Mark of great impact
www.pointengineering.com
26
26
Point Engineering Limited
  • The objective of the detailed engineering phase
    of the Oso Flare Segregation project is to
    provide a fit-for-purpose procurement/construction
    packages that will segregate the existing
    comined flare system.
  • The design eliminate risk of back drafting on the
    flare systems and balanced the relief load of the
    flare systems to be within the re-rated capacity
    of 800 Mscf/D by rerouting the blowdown and
    relief valves from the 4th and 5th stage
    compressors from the RG flare to the RK flare.
  • Some PSV's were also modified to achieve the
    design intent.

Detailed Engineering Designs for Oso Flare
Segregation Piping and PSVs Modifications
Client Name MPN, Lagos Location Oso Offshore
Platform Date March 2004 August 2004 Contract
Type Reimbursable, Detail Engineering
Client Contact Deepesh Kaushish Deepesh.kaushish_at_
exxonmobil.com
A Mark of great impact
www.pointengineering.com
27
27
Point Engineering Limited
Escravos Production District is one of the 3
districts in the SPDC-West Northern Swamp
Production Area (NSA) with a logistics base
located at Escravos Beach. It consists of four
Flow-stations namely Otumara, Saghara, Escravos,
and Opuama. The combined production capacity of
Escravos District is 180 Mobd of oil, which
represents 40 of NSA installed production
capacity. There are 8 principal communities in
Escravos District. These communities are
Ajudiabo, Madangho Ogidigben, Aruton,
Ugboegungun, Degele, Opuama and Tsekelewu. SPDC
planned to provide power to these host
communities in 2 phases with phase 1 being to
supply power to the 3 communities around the
Escravos Logistic Base i.e. Ajudiabo, Madagho and
Ogidigben. Each of the 3 communities identified
in phase 1 have their own community distribution
network that needs to be upgraded. Point
Engineering Limited perform preliminary
engineering studies and detailed engineering
design necessary for the proposed Escravos
Communities Electrification scheme for the
Escravos Logistics Base, Madangho, Ogidigben and
Ajudiabo communities.
Detailed Design for Power Generation,
Transmission and Distribution to Forcados,
Ogidigben, Communities
Client Name SPDC, Western Division Location
Forcados Date January 2004 June 2004 Contract
Type Lumpsum, Detail Engineering
Client Contact Chris Anthony Chris.anthony_at_shell.
com
A Mark of great impact
www.pointengineering.com
28
28
Point Engineering Limited
Preparation of Integrated Operating Standards
The Integrated Operations Standards and Practices
are the Mandatory minimum requirement to control
Operational and Maintenance Activities carried
out in the Shell System. They provide the basic
rules, procedures, work practices and routines
when used with the Health, Safety and
Environmental Management Systems, to maintain a
safe, efficient working environment. The
Integrated Operations Standards consist of
mandatory Standing Instructions, Operation
Instructions, Procedures, recommended Work
Practices and Maintenance Job Routines. The work
entails developing the following Standards and
Work Practices Standing Instructions Field
Operations Maintenance Job Routines Point
Engineering Limited developed the above Standards
and Work Practices in line with SNG guidelines..
Client Name Shell Nigeria Gas Limited Location
Agbara / Ota Date October 2003 January
2004 Contract Type Lumpsum, Engineering Studies
Client Contact John Itimi elo.itimi_at_shell.com
A Mark of great impact
www.pointengineering.com
29
29
Point Engineering Limited
Preparation of Operating and Maintenance Manuals
Shell Nigeria Gas Limited contracted to PEL the
task of developing a comprehensive operating and
maintenance manual for its Gas Distribution
Network at Aba. Point Engineering Limited
carried out these activities in line with SNG
guidelines..
Client Name Shell Nigeria Gas Limited Location
Agbara / Ota Date October 2003 December
2003 Contract Type Lumpsum, Engineering Studies
Client Contact Chucks Ahiakwo Chukwuma.ahiakwo_at_sh
ell.com
A Mark of great impact
www.pointengineering.com
30
30
Point Engineering Limited
Oso RG Damage Assessment and Restart Project -
Piping Works Design and Drafting Package
On April 29th 2003, a fire occurred on one of
MPNs platforms, OSO, damaging an isolated
portion of the platform structure. Point
Engineering carried out the detailed drafting and
design on the damaged cooler piping to enable
necessary deliverables for procurement and
construction
Client Name MPN Lagos Location Oso Offshore
Platform Date May 2003 July 2003 Contract
Type Lumpsum, Detail Engineering
Client Contact Tolu Okikiolu Tolulope.o.okikiolu_at_
exxonmobil.com
A Mark of great impact
www.pointengineering.com
31
31
Point Engineering Limited
Elf Petroleum Nigeria Limited intends to improve
its material recovery process by the Installation
and construction of a Material Recovery Facility
at Obagi in OML 58. The facility will have
capability to segregate waste materials from the
Obagi district area office/accommodation, recover
useable wastes, incinerate discarded wastes and
dispose the residues in an environmental friendly
way. The facility will also have a sewage
treatment plant for centrally treating human
waste, a Guard House with Rest-room, a three-room
Office block with male /female Rest-rooms,
Overhead Water Tank with associated Borehole
Pumps and Supporting Structures, Generator House
with the Diesel Storage Tank, Waste Processing
Shed, Waste Offloading Shed, Ash Shed and a Gas
Bottle Shelter. The works also include the
installation of a Waste Incinerator, a Sewage
Treatment Facility with associated accessories
including Block Wall Fence, Firewater System with
associated hydrants
Basic Engineering Studies and Design for the
Material Recovery Facilities at Obagi Field OML
58
Client Name Elf Petroleum Nigeria
Limited Location Obagi Date May 2003 December
2003 Contract Type Lumpsum, Detail Engineering
Client Contact David Fompun David.FOMPUN_at_total.co
m
A Mark of great impact
www.pointengineering.com
32
32
Point Engineering Limited
Detailed Design for 28 Pipeline Sectional
Replacement by Hot Tapping
This project is necessitated by the
recommendation of SPDC-EAST IP report developed
in 2001 for the 28 x 17 km NCTL from Krakama
manifold to Cawthorne junction manifold. The IP
report recommended the sectional replacement of a
defective pipe section, about 4 km from Krakama
manifold, which has undergone 76 wall loss. In
order to carry out the sectional replacement,
hot-tapping and stoppling operations are
required. This project was awarded to Oilserv
Limited who in turn sub-contracted the design
scope of the job to Point Engineering Limited
Client Name Oilserv Limited / SPDC Location
Krakama Date August 2003 Septeber
2003 Contract Type Lumpsum, Detail Engineering
Client Contact Austin Uzoka oilserv2_at_infoweb.abs.
net
A Mark of great impact
www.pointengineering.com
33
33
Point Engineering Limited
In 2001, during the cleaning of 14
Okordia-Rumuekpe trunk line to enable intelligent
pigging for integrity data acquisition, it was
observed that the cleaning pig was stuck in the
trunk line at Sambreiro river crossing as a
result of obstruction in the trunk line.
Similarly, a dent was revealed during the phase
IV internal inspection program for pipelines in
2002 by a caliper survey of the 10 Diebu creek
delivery line, approximately 6.97km away from a
launcher manifold at Diebu creek flowstation. The
dent lies within the river crossing section of
the pipeline at Ekowe/Nange-ama. In view of this,
planned replacement of these pipeline sections in
line with SPDCs standard is required. The
objective of the Design is to produce necessary
engineering drawings to enable effective
replacement of the dented or obstructed section
of the delivery line and trunk line on the
Ekowe/Nange-ama and Sambreiro River crossing
sections respectively. These replacements will
ensure steady flow of crude oil through these
pipelines and allow intelligent pigging for data
acquisition in line with DPRs requirements
Detailed Designs for 14 Pipeline Sectional
Replacement at Diebu River Crossing and 10
Pipeline Sectional Replacement at Okordia River
Crossing
Client Name SPDC, easter Division Location
Diebu and Okordia Date March 2003 August
2003 Contract Type Lumpsum, Detail Engineering
Client Contact Joe Dim Joe.dim_at_shell.com
A Mark of great impact
www.pointengineering.com
34
34
Point Engineering Limited
  • On the backdrop of the turbine blow-out that
    happened on Oso gas compression platform (RG),
    MPNU decided to carry out an EIT study on Edops
    Injection Gas Compressors (IGC A/B), to determine
    the modifications that would be required to
    forestall such an occurrence on QI.
  • From the EIT recommendations, the following
    modifications are required
  • Segregation of IGC A/B starter gas exhaust lines
    from existing LP vent header, and routing them to
    a safe location.
  • Installation of flame arrestors on new IGC A/B
    exhaust vent lines.
  • Installation of shutdown valves (SDVs) upstream
    of IGC A/B starter gas control valves to provide
    automatic cut-off of starter gas supply to the
    system in the event of starter speed inhibition
    system failure.
  • Installation of device such as lube oil flow
    indicator or a means of confirming lube oil flow
    after start-up and at any other time. The device
    is to be installed such that it can be read from
    outside IGC A/B housing.
  • Connection of IGC A/B starter pickup speed signal
    into control room DCS
  • Point Engineering Ltd performed the detailed
    engineering design to address these concerns
    raised by the EIT.

Detailed Design for Edop GIP Turbine Vent System
Modification
Client Name MPN QIT, Eket Location Edop
Offshore Platform Date May 2003 July
2003 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
35
35
Point Engineering Limited
Due to the reduction in MPN QITs daily crude
production as a result of the reduced OPEC quota,
QIT no longer produces enough fuel gas to supply
all fuel gas users at the QIT. This has resulted
in use of alternative fueling (diesel) of the QIT
generators. Field Operations Technical
Engineering (FOTE) carried out a conceptual study
to evaluate different options with a view of
identifying the most economical, effective and
efficient way of increasing the fuel gas
availability at QIT while still keeping the OPEC
oil production quota and thereby reducing or
eliminating the diesel usage at QIT. To achieve
this, FOTE has identified an option involving a
means of increasing the overall QIT GOR while the
1st stage separator pressure of 30 Psig is being
maintained by injecting up to 15 MMscfd of gas
into the following Main Oil Lines (MOL) 16
Ekpe-Asabo oil pipeline 24 Ubit-QIT oil
pipeline MPN has carried out pipeline hydraulic
analysis for these oil lines (with the injected
gas) and predicted that the potential of slug
flow in the incoming pipeline is not likely.
Therefore, PELs scope on this project is limited
to the detailed design for the piping
modifications required on Ubit and Ekpe platforms
to enable connection of gas stream from a
reasonable source to an appropriate point on the
MOL location
Detailed Design for Ubit Ekpe Gas Spiking
Project
Client Name MPN QIT, Eket Location Ubit Ekpe
Offshore Platform Date May 2003 July
2003 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
36
36
Point Engineering Limited
A recent EIU SHE risk assessment conducted by
MPNU on Inim PP identified the present Instrument
Gas system as a potential risk fire hazard.
Pneumatic systems continuously bleed off gas that
power or pressurize them as part of the pneumatic
system operations. Inim PP is a manned
production platform and has electric powered
equipment that are likely sources of ignition of
any gathered gas cloud. For this reason and
others highlighted in the EIU SHE risk assessment
report, Mobil Producing Nigeria Unlimited
embarked on the conversion of the Instrument Gas
System to Instrument Air System. PEL carried out
this study that considers a number of options for
the installation of the proposed Instrument Air
System, estimate the instrument air demand,
develop equipment specifications, identify
required structural modifications and tie-in to
existing instrument air header, and develop cost
estimates for renting as against outright
purchase of compressor units for a period of five
years
Preliminary Design for the Conversion of Inim PP
Instrument Gas System to Instrument Air System
Client Name MPN QIT, Eket Location Inim
Offshore Platform Date April 2003 June
2003 Contract Type Reimbursable, Engineering
Study
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
37
37
Point Engineering Limited
The project is necessitated by the need for MPN
to carry out the complete replacement of some
failed pipe supports on 36 and 48 pipeline
headers transferring crude to and from tank 5008
respectively at QIT process area . PELs scope
of work is the provision of detailed engineering
design, calculations, documentation and
construction drawings to enable construction of
an adequate reinforced concrete pipe support for
the 36 48 pipelines. Detailed soil
investigation was carried out at the failed
section on the pipelines route. Four new
supports were designed to support the expansion
loop section of the pipelines.
Detailed Engineering Design for QIT 36 Inlet
Header and 48 Outlet Header Supports Upgrade
Client Name MPN QIT, Eket Location QIT,
Eket Date April 2003 May 2003 Contract Type
Reimbursable, Detail Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
38
38
Point Engineering Limited
Detailed Design for Usari FB and FC Mezzanine
Deck Installation
The scope of the project is the provision of
detailed engineering design to enable the
fabrication and installation of Mezzanine decks
on Usari FB and FC platforms. The work entails
the design of an adequate steel structure and
grating access platform at both platforms to
enable personnel have access to equipment during
maintenance
Client Name MPN QIT, Eket Location Usari
Offshore Platform Date Nov. 2002 January
2003 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
39
39
Point Engineering Limited
Preliminary Design for Replacement / Relocation
of Diesel Refill System at BRT
Mobil Producing Nigeria Unlimited intended to
relocate the diesel refilling piping with the
associated pumping and metering facilities at
their Bonny River Terminal (BRT) from the present
small Boat dock location to the product loading
dock at the jetty. Point Engineering Limited
(PEL) was engaged to carry out preliminary
engineering design for the new piping systems.
Client Name MPN QIT, Eket Location Bonny River
Terminal Date October 2002 December
2002 Contract Type Reimbursable, Basic
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
40
40
Point Engineering Limited
Detailed Design for Edop QI Atmospheric Vent
Re-routing
The scope of the project is the provision of
detailed engineering design to enable re-routing
of the existing Edop vertical atmospheric vent
stack to a horizontal stack in a safe
location. The work also entails the design of an
in-line detonation arrestor on the new stack and
the resetting of the existing CO2 automatic
flooding system to be able to sense early
fire. Point Engineering Limited will carried out
the necessary process and piping design that
enable the above design intent to be achieved.
Client Name MPN QIT, Eket Location Edop
Offshore Platform Date Nov. 2002 December
2002 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
41
41
Point Engineering Limited
Inim PP Vent Gas Relief Header Modifications
Detail Design
The work entails the provision of engineering
design services to generate all necessary
detailed drawings and documentations required to
carry out structural and piping works for
installation of a temporary maintenance relief
vent line at Inim Platform.
Client Name MPN QIT, Eket Location Inim
Offshore Platform Date October 2002 November
2002 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
42
42
Point Engineering Limited
The work entails the provision of engineering
design services to generate all necessary
detailed drawings/documentions required to carry
out structural, piping, electrical and equipment
installation works for upgrading the existing 3
tons hoist system to 5 tons hoist system. It
also involves carrying out detailed load analysis
that will enable the relocation of the existing
diesel firewater engine and housing that may
obstruct the planned MOL pumps hoist and monorail
track I-beam installation.
Detailed Design for Ubit MOL Pump Hoist
Monorail Track I - Beam
Client Name MPN QIT, Eket Location Ubit
Offshore Platform Date October 2002 December
2002 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
43
43
Point Engineering Limited
Etim A, B, and PP Flame Arrestor Installation
Design
The scope of work is to provide detailed
Engineering design, drawings and documentation
for the installation of in-line flame arrestors
on Etim A, B, PP sump tank vent lines
Client Name MPN QIT, Eket Location Etim
Offshore Platform Date October 2002 December
2002 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
44
44
Point Engineering Limited
Detailed Design of Maintenance Platform on Power
plant machine Hall for Access to 20 Ton Hoist
Due to lack of direct access to perform
maintenance on the electrical/mechanical
components of the 20 Tons Crane Hoist at the
Mobils QIT power plant machine hall, a safely
designed mezzanine deck was required. Point
Engineering Ltd performed detail load analysis,
weld/bolting details, deck layout and support
details for the project. Construction scope of
work, project schedule and cost estimate were
produced for the project.
Client Name MPN QIT, Eket Location QIT,
Eket Date October 2002 December 2002 Contract
Type Reimbursable, Detail Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
45
45
Point Engineering Limited
Detailed Design of Ubit GY and GP Sump Tank
Debottlenecking
The scope of the project is the provision of
detailed engineering design for the complete
debottlenecking of the Ubit GP / GY Sump system
and in line with API RP 14C, which requires that
a Sump pump should run on auto mode, while a sump
tank should not be a pressurized vessel. The
work also entails the selection of a sump pump,
capable of maintaining higher pressure that will
overcome production Separator discharge pressure
without backing out .
Client Name MPN QIT, Eket Location Ubit
Offshore Platform Date August 2002 October
2002 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
46
46
Point Engineering Limited
Detailed Engineering Design for the Installation
of Ubit BSW Laboratory Upgrade
The work entails the provision of engineering
design services to generate all necessary
detailed drawings and documentations required to
carry out structural, piping, and electrical
equipment installation works for convert ion of
the mini portakabin at Ubit PP to a BSW
laboratory, in line with MPN requirements (OIMS
System 5-4 (Personnel Safety Management)
Client Name MPN QIT, Eket Location Ubit
Offshore Platform Date August 2002 October
2002 Contract Type Reimbursable, Detail
Engineering
Client Contact Jim Morris James.m.morris_at_exxonmob
il.com
A Mark of great impact
www.pointengineering.com
47
47
Point Engineering Limited
EA PROJECT Layout/Hazardous Area Classification
of Granstaff Barge/DP-A Platform
As part of the activities for Well Clean out and
Testing for the EA Project, SPDC issued a work
order to Oiltest Services (NIG.) Limited to carry
out layout design to enable Oiltest and
Halliburton Equipment hook-up on MV Lowell
Granstaff Barge in line with safety requirements
of API 15 (Hazardous Area Classification). The
project scope also involves Preparation of
Process Drawings of the preferred scheme to
enable HAZOP of the Oiltest and Halliburton
processes
Client Name SPDC, Eastern Division Location EA
Offshore Platform Date October 2002 November
2002 Contract Type Lumpsum, Detail Engineering
Client Contact Mr. Ubani
A Mark of great impact
www.pointengineering.com
48
48
Point Engineering Limited
In 1992 Phase IV of Pipeline Internal Inspection
Program was undertaken by SPDC-EAST and
modification of the scraper traps on the
following three gas lines require immediate
attention 8 x10.52 Km Afam Gas Plant Afam
NEPA MANIFOLD Gas line 10 x10.60 Km Afam Gas
Plant Afam NEPA MANIFOLD Gas line 6 x1.9 Km
Kolocreek Imiringi Gas line PEL scope includes
modifications of the existing pig traps and
design of new slug catchers for the above lines
necessary to enable cleaning, flushing and
internal inspection of the lines in readiness for
resumption of gas supply from Afam Gas Plant to
NEPA Power Plant after a prolong shutdown of the
plants since 1999.
Design of Gas Line Scrapper Traps and Slug
Catchers
Client Name SPDC, Eastern Division Location
Afam and Kolocreek Date April 2002 October
2002 Contract Type Lumpsum, Detail Engineering
Client Contact Joe Dim joe.dim_at_shell.com
A Mark of great impact
www.pointengineering.com
49
49
Point Engineering Limited
The Agbara/Ota Gas Distribution System comprises
of the following Custody Transfer Station
(CTS). Pressure Reduction Metering Station
(PRMS). Customer Stations (CS) Shell Nigeria
Gas Limited contracted to PEL the task of
developing a comprehensive operating and
maintenance manual for these systems. In
addition to the manual preparation, PELs scope
also include rendering commissioning assistance
services for the plant commissioning group and
standardization of various engineering drawings.
Agbara/Ota Gas Distribution Systems (Operating
Manual Commissioning Assistance)
Client Name Shell Nigeria Gas Limited Location
Agbara / Ota Date June 2002 December
2002 Contract Type Lumpsum, Detail Engineering
Client Contact Chucks Ahiakwo Chukwuma.ahiakwo_at_sh
ell.com
A Mark of great impact
www.pointengineering.com
50
50
Point Engineering Limited
SPDC Planned to install a Remote Field Manifold
(RFM) at Agbada Well, Location 20 as part of her
efforts to reduce clusters of flowlines in the
field. In addition to the RFM, installation of 3
Nos 6 x 1.6Km Bulklines, 1 Nos 4 x 1.6Km
Testline and 1 Nos 2 x 1.6Km Airline were also
involved in the project. PEL performed the
detailed engineering phase of the project. The
work includes preparation of Pipeline Alignment
Sheets, Piping General Arrangement Drawings,
Isometric Drawings with MTOs, PEFSs Instrument
Design based on OPEN SYSTEM ARCHITECTURE etc.
Detailed Design of Remote Field Manifold RFM
(Agbada Loc. 20)
Client Name SPDC, Eastern Division Location
Agbada Field Date August 2002 November
2002 Contract Type Lumpsum, Detail Engineering
Client Contact Elisha Ezekiel-Hart Elisha.ezekiel
-hart_at_shell.com
A Mark of great impact
www.pointengineering.com
51
51
Point Engineering Limited
Provision of Hazop Leader and Secretary
Provided HAZOP Leader and Secretary including
reports and review services for the Obigbo to IA
Gas Pipeline Project.
Client Name SPDC, Eastern Division Location
Shell IA Date April 2002 Contract Type
Reimbursable, Engineering Services
Client Contact Badar S. Al-Sharjy b.al-sharjy_at_she
ll.com
A Mark of great impact
www.pointengineering.com
52
52
Point Engineering Limited
Preparation of Operating and Maintenance Manuals
Preparation of Operating and Maintenance Manuals
for 12 Land flowstations, 5 swamp flowstations
and 1 AGG Plant
Client Name SPDC, Eastern Division Location
Land and Swamp Date May 2001 - November
2002 Contract Type Lumpsum, Engineering Studies
Client Contact Felix Odusanya Felix.odusanya_at_shel
l.com
A Mark of great impact
www.pointengineering.com
53
53
Point Engineering Limited
SPDC embarked on various gas utilization projects
as part of its efforts to eliminate continous gas
flaring in its oil production operations, and
CCAGG was one of such projects. The EPC phase
of the project was split into pipeline facility
scopes and awarded to Daewoo Nigeria Limited who
subcontracted the detailed engineering works to
Point Engineering Limited. There were eleven
pipelines involved for transportation of gas to
and from locations within the AGG node and third
party facilities (e.g NLNG, ASCON). Point
Engineerings scope includes detailed
engineering, Sub-Contracting Engineering Survey
of the pipeline R.O.W in Swamps river / creek
terain with supervision and management of the
surveyors, soil investigation and resistivity
survey, etc. Conceptual Design verification,
Pipeline relief, vent and blowdown design were
done on the eleven pipelines. Corrosion and
Cathodic Protection design was also carried out.
Cawthorne Channel AGG Pipeline Project (CCAGG)
Client Name Daewoo / SPDC Location Cawthorne
Channel Date May 2001 - November 2001 Contract
Type Lumpsum, Detail Engineering
Client Contact Joon Ryoo Joon_ryoo_at_mail.dwconst.c
o.kr
A Mark of great impact
www.pointengineering.com
54
54
Point Engineering Limited
SPDC-E own and operate an existing Gas Plant at
Afam located about 40km East of Port Harcourt,
Nigeria (OML11). The Gas Plant was seriously
vandalised in 1999 to the extent that a complete
refurbishment of various facilities such as
export pumps, generators, instrumentation items,
and electrical system etc. is required to bring
the Gas Plant back on stream. In addition it is
also required to debottleneck the Gas Plant to
enable the processing of 75MMscfd and at the same
time meet the environmental upgrade
requirements. The Process Automation System (PAS)
is required to be upgraded to a novel OPEN SYSTEM
ARCHITECTURE Technology. Point Engineering
performed the conceptual design and full detailed
engineering design for the rehabilitation/upgrade
works.
Afam Gas Plant Rehabilitation Design
Client Name SPDC, Eastern Division Location
Afam Date Nov. 2001 - November 2002 Contract
Type Lumpsum, Detail Engineering
Client Contact Elisha Ezekiel-Hart Elisha.ezekiel
-hart_at_shell.com
A Mark of great impact
www.pointengineering.com
55
55
Point Engineering Limited
SPDC-E own and operate an existing Flowstation at
Afam located about 40km East of Port Harcourt,
Nigeria (OML11). The Flowstation was seriously
vandalised in 1999 to the extent that a complete
refurbishment of various facilities such as
export pumps, generators, instrumentation items,
and electrical system etc. is required to bring
the Flowstation back on stream. In addition it
is also required to debottleneck the Flowstation
to enable the processing of 30,000bopd and at the
same time meet the environmental upgrade
requirements. The Process Automation System (PAS)
is required to be upgraded to a novel OPEN SYSTEM
ARCHITECTURE Technology. Point Engineering
performed the conceptual design and full detailed
engineering design for the rehabilitation/upgrade
works.
Afam Flowstation Rehabilitation Design
Client Name SPDC, Eastern Division Location
Afam Date Nov. 2001 - November 2002 Contract
Type Lumpsum, Detail Engineering
Client Contact Elisha Ezekiel-Hart Elisha.ezekiel
-hart_at_shell.com
A Mark of great impact
www.pointengineering.com
56
56
Point Engineering Limited
As part of the Field Development plan of the
Production Area A of SPDC-E, installation of a
12 x 14km crude pipeline is required for bulk
production from Gbaran Field to Kolo Creek
Flowstation for processing as there is no
existing Flowstation at Gbaran. It is also
necessary to carry out some modifications/expansio
n work at Kolo Creek flowstation to enable it to
handle the additional fluid from Gbaran. Point
Engineering on behalf of Ozono Nigeria Limited
carried out the full detailed engineering design
for this project. The design work involved
Pipeline Hydraulic simulation, Pipeline
Mechanical Design, Corrosion Engineering and
Cathodic Protection System Design - Utilizing
solar power system, etc.
Gbaran/Kolo Creek Pipelines Flowstation
Expansion Design
Client Name SPDC, Eastern Division Location
Gbaran and Kolocreek Date Dec. 1999 - February
2000 Contract Type Lumpsum, Detail Engineering
Client Contact Tayo Opanubi Tayo.opanubi_at_shell.co
m
A Mark of great impact
www.pointengineering.com
57
57
Point Engineering Limited
Flowstation As-built Mark-ups
Point Engineering carried out production of
As-built Engineering Drawings for four SPDC
Flowstations (Imo River 1 3, Obigbo North and
Agbada-2) The following Engineering drawings
were marked up on site to produce the As-built
status of the facilities Process Flow
Schemes. Process Engineering Flow Schemes. Piping
General Arrangement Layout. Isometric Drawing
etc.
Client Name SPDC, Eastern Division Location Imo
River and Obigbo North Date March 2000 - August
2000 Contract Type Lumpsum, As-built
Documenation
Client Contact Elisha Ezekiel-Hart Elisha.ezekiel
-hart_at_shell.com
A Mark of great impact
www.pointengineering.com
58
58
Point Engineering Limited
Electrification of Bille Community is required as
Part of SPDCs Community Development Project in
the Area. Point Engineering carried out the
Detailed Engineering Design of the
Electrification Systems including 0.415/11KV and
11/0.415KV transformers, 500KVA Gas Engine Power
Generators, 14 kM overhead Transmission line and
Hook-Up System. Route Survey for pole locations
and cable stringing was also performed by Point
Engineering Limited.
Bille Community Electrification Project
Client Name SPDC, Eastern Division Location
Bille Date Feb. 2001 - May 2001 Contract Type
Lumpsum, Detail Engineering
Client Contact Chinedu B. Okoye Chinedu.okoye_at_she
ll.com
A Mark of great impact
www.pointengineering.com
59
59
Point Engineering Limited
Brass Terminal Gun Barrel Tank
As a Sub Contractor of OISL, Point Engineering
Limited executed detailed engineering design of
Gun Barrel Tanks with the associated fire
fighting Systems and tie-in to existing
facilities located at NAOCs Brass Terminal. The
work entailed preparation of process drawings
(PFD, P ID etc.), piping general arrangements
and isometrics for transfer pumps, development of
Valve List, Line List, MTO using NAOCs Standard
Engineering Specifications. Drawings were also
prepared for all the associated instrumentations,
Civil / Structural works, and electrical Systems.

Client Name NAOC / OIS Location Brass
Terminal Date Feb. 2001 - June 2001 Contract
Type Lumpsum, Detail Engineering
Client Contact Chris Akhigbe-midu pmnl_at_projectmas
terng.com
A Mark of great impact
www.pointengineering.com
60
60
Point Engineering Limited
AMNI International Limited has an Offshore
Storage vessel called AILSA CRAIG with associated
Single Buoy Mooring System. This project required
the assessment of the failed bridle and fish
plate and to carry out detailed design for the
replacement. Point Engineering performed
mechanical engineering calculations ( stress
strength analysis) to investigate the most
appropriate material for the mooring bridle/fish
plate.
Engineering Evaluation of Failed Mooring System
Detailed Design of Replacement Hose and Structure
Client Name AMNI Location Offshore Storage
Platform Date May 2001 - August 2001 Contract
Type Lumpsum, Detail Engineering
Client Contact Wale Olafisan 234-84-239079
A Mark of great impact
www.pointengineering.com
61
61
Point Engineering Limited
Engineering Evaluation of Existing 6 Gas
Injection Line Design of New Gaslift Line
AMNIs IMA Field Platform comprise of a
Processing Platform (PP), Well Production
Platform (WPP), and interface linkage between WPP
and PP. There is an existing 28ft x 6 flexible
hose between WPP of compressor discharge and the
bridge interface to the Gas Injection Wells. No
evaluation was done when this line was installed.
To determine the suitability of this line to
convey gas from Gaslift compressors to WPP, an
evaluation was required. Point Engineering
carried out engineering evaluation of the
existing Gas Injection Line and designed a new
Gaslift flowline to Ima-2ST4, Ima-7B and
additional two slots with a lift pressure of
1500psi in addition to the existing gas injection
manifold.
Client Name AMNI Location Langley Offshore
Platform Date Nov. 2000 - January 2001 Contract
Type Lumpsum, Detail Engineering
Client Contact Wale Olafisan 234-84-239079
A Mark of great impact
www.pointengineering.com
62
62
Point Engineering Limited
Detailed Design for Aba Early Gas Supply and
Tie-ins
The Project is required by SPDC to meet gas
supply commitments to Aba customers before and
after the AGG gas plant comes on stream in
November 2000. Before the AGG comes on, 12mmscf/d
off-gas would be taken from Nkali XHP to Imo
River 1 Flowstation through the 16 AGG gas
pipeline, passed through the existing sales gas
scrubber before getting to the customers at Aba.
Point Engineering on behalf of Ozono Nigeria
Limited carried out the full detailed engineering
design for this project.
Client Name SPDC, Eastern Division Location Imo
Riv., Nkali F/station Date January 2000 -
March 2000 Contract Type Lumpsum, Detail
Engineering
Client Contact Joseph Ike Joseph.ike_at_shell.com
A Mark of great impact
www.pointengineering.com
63
63
Point Engineering Limited
DESIGN MODIFICATIONS FOR CP INSTALLATIONS AT IMO
RIVER 1, OBIGBO NORTH AND OGUTA FLOWSTATIONS
Shell Petroleum Development Company of Nigeria
Limited plans to install 9 Centrifugal Pumps at
Imo River 1, Obigbo North and Oguta flow stations
to replace existing Reciprocating Pumps. SPDC
issued an order (ED-054) to Ozono Nigeria Limited
to carry out design modifications of 4 bays in
each of these stations to enables flexibility in
pump hook-up installation and future
replacements. The project scope is also to carry
out detail design / engineering and preparation
of Approved-for-Construction drawings,
construction workscope and materials take-off for
pump and driver hook-up to existing facilities.
The new Centrifugal Pumps and Drivers will be
vendor supplied . Point Engineering on behalf
of Ozono Nigeria Limited carried out the full
detailed engineering design for this project.
Client Name SPDC, Eastern Division Location Imo
Riv., Obigbo Oguta Date Dec. 1999 - February
2000 Contract Type Lumpsum, Detail Engineering
Client Contact Elisha Ezekiel-Hart Elisha.ezekiel
-hart_at_shell.com
A Mark of great impact
www.pointengineering.com
64
64
Point Engineering Limited
The Obigbo North field has an existing Water
Injection Plant (WIP) with an installed capacity
of 15Mbwpd for pressure maintenance. The WIP uses
source water from 2 water wells. The Field
Development Plan (FDP) of 1997 identified an
additional requirement of 20Mbwpd. It also
identified Produced Water Re-Injection (PWRI) as
an economic alternative to the existing source
water injection and produced water disposal. The
PWRI will increase oil production in Obigbo
North, replace its produced water disposal at
Bonny Terminal with a more environmentally
friendly alternative and create more ullage in
the pipeline trunklines. It will also alleviate
the produced water processing capacity of Bonny
Terminal in the long term. The FDP recommended
this pilot scheme to quantify and thus reduce the
risks that may be associated with a full-scale
implementation of PWRI. The design scope for the
project is to carry out detail design engineering
and preparation of Approved-for-Construction
drawings, construction workscope and materials
take-off for Separators and Skimmer hook-up to
existing facilities.
Obigbo North Water Re-injection Pilot Project
Client Name Oiltest / SPDC Location Obigbo
North Date August 1998 - September 1998 Contract
Type Lumpsum, Detail Engineering
Client Contact Patrick Amadi 234-84230931
A Mark of great impact
www.pointengineering.com