ICAO ACP Working Group M Iridium Sub Group Overview - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

ICAO ACP Working Group M Iridium Sub Group Overview

Description:

ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 13
Provided by: eurocontr
Category:
Tags: acp | icao | group | iridium | overview | sub | working

less

Transcript and Presenter's Notes

Title: ICAO ACP Working Group M Iridium Sub Group Overview


1
ICAO ACP Working Group MIridium Sub Group
Overview
  • Bob Kerczewski
    Mike Meza
  • NASA Glenn Research Center
    Iridium
  • AGC-FG and NexSAT-SG Joint Meeting with ICAO ACP
    WG-C
  • 18-19 September 2006

2
ACP WGM Iridium Subgroup
  • The Iridium Subgroup was formed in WG-M with the
    task to develop an implementation manual and a
    manual on detailed technical specifications, on
    the basis of the draft generic AMS(R)S SARPs that
    were developed by the ACP.
  • From Recommendation 3/2 of the ACP Working Group
    of the Whole (21 - 29 June 2005) and in
    coordination between the Rapporteur of WG-M, the
    panel member nominated by the United States and
    the ACP Secretariat.
  • Subgroup Tasks
  • Develop the new Iridium technical manual in a
    timeframe that would support the suggested
    applicability date of the AMS(R)S SARPs by
    November 2007
  • Create an implementation manual to provide
    guidance to States on commissioning the system
  • Identify any validation requirements associated
    with the Iridium technical manual and conduct
    appropriate validation if necessary
  • Establish a documentation control system to
    identify and manage the core documents
  • Coordinate with other ICAO panels as appropriate
    through the ICAO Secretariat and
  • Secure broadest participation from industry in
    the activities of the sub-group.

3
ACP WGM Iridium Subgroup
  • Five meetings of the Iridium Subgroup have
    occurred. The Subgroup also reported to WGM
    Meeting 11
  • Meeting overviews
  • ACP WGM Iridium 1 20-22 September 2005
  • Reviewed existing ICAO material on AMS(R)S
  • Reviewed intellectual property rights and
    validation activities requirements
  • Reviewed initial version of Iridium Technical
    Manual.
  • ACP WGM Iridium 2 1-3 November 2005
  • Reviewed second draft version of Iridium
    Technical Manual.

4
ACP WGM Iridium Subgroup
  • Meeting overviews
  • ACP WGM Iridium 3 15-17 February 2006
  • Reviewed relevant industry activities, AEEC,
    ICAO, European Standards, RTCA SC-208 activities
  • Reviewed the ICAO position on technical manual
    and implementation manual content
  • Reviewed third draft version of Iridium
    Technical Manual reviewed cross-reference of
    SARPs requirements vs acceptability criteria of
    RTCA DO-270 and DO-262 considered verification
    and validation requirements
  • Reviewed outline and initial draft of Iridium
    Implementation Manual

5
ACP WGM Iridium Subgroup
  • Meeting overviews
  • ACP WGM Iridium 4 17-19 May 2006
  • Reviewed status of AMS(R)S SARPs review process
  • Reviewed fourth draft version of Iridium
    Technical Manual
  • Reviewed second draft of Iridium Implementation
    Manual
  • Interim results reported to ACP WGM 11 31 May
    2 June
  • Presented Iridium Subgroup Overview
  • Reviewed draft versions of Iridium Technical
    Manual and Iridium Implementation Manual
  • WGM made two significant recommendations
  • Add information on Iridium availability
  • Include more information validating Iridium

6
ACP WGM Iridium Subgroup
  • Meeting overviews
  • ACP WGM Iridium 5 22-24 August 2006
  • Reviewed status of AMS(R)S SARPs responses from
    states
  • Reviewed combined Technical and Implementation
    Manual
  • Reviewed Satcom Availability Analysis from
    Future Communications Study
  • Reviewed validation requirements and approach
  • Reviewed Iridium as ATN subnetwork for inclusion
    in WGN-1 activities

7
ACP WGM Iridium Subgroup
  • Key Issues the Iridium Subgroup has addressed
  • Understanding and applying the new ICAO
    philosophy of generic or performance-based
    SARPs coupled with system-specific Manual(s)
  • SARPs provide performance requirements, rather
    than system technical specifications
  • A separate document for each specific system
    implementation provides technical specifications
  • What is the required and appropriate content of
    Technical and Implementation manuals
  • Technical manual provides system technical
    specifications and demonstrates compliance with
    SARPs
  • Implementation manual provides guidance for
    system implementation

8
ACP WGM Iridium Subgroup
  • Key Issues the Iridium Subgroup has addressed
  • Whether, and how, to combine the Technical and
    Implementation manuals into one document
  • Current version is now a single document,
    restructured to eliminate redundancy and create a
    more generic manual to enable flexibility for
    future amendments if necessary, and to provide
    material that can be used for other systems
    manuals (e.g. Inmarsat, MTSAT)
  • How to present Iridium performance vs. SARPs
    requirements and what validation is required
  • Iridium performance is compared to SARPs
    requirements in a Table
  • Validation of Iridium performance is documented
    in a separate validation report
  • How to consider Iridium as a subnetwork within an
    end-to-end communications network
  • The draft AMS(R)S SARPs cover the satellite
    subnetwork
  • End-to-end performance is considered within the
    ATN structure inclusion of Iridium as a
    subnetwork within ATN SARPs is being considered

9
ACP WGM Iridium Subgroup
  • Overview of Iridium Manual Contents
  • The Technical manual and implementation manuals
    have been combined into one manual.
  • This consolidated manual contains information
    about aeronautical mobile satellite
    communications, using the Iridium Satellite
    Network, including applications, potential
    benefits, user requirements, system architecture,
    interoperability and technical characteristics,
    as well as space, ground and airborne equipment.
  • Information on status of development and ICAO
    activities (institutional arrangements, spectrum
    availability, SARPs and networking) is also
    included.

10
ACP WGM Iridium Subgroup
  • Overview of Iridium Manual Contents
  • Chapter 1 Introduction
  • includes potential benefits that can be expected
    from the use of a satellite communication service
    for AMS(R)S and an overview of how the Iridium
    Satellite Network supports AMS(R)S)
  • Chapter 2 Services, User requirements and
    Operational
  • Chapter 3 Standardization activities
  • Chapter 4 ICAO Activities
  • Chapter 5 Iridium Satellite Network
  • Chapter 6 Iridium AMS(R)S System
  • Chapter 7 Iridium AMS(R)S Standardization
    Activities

11
ACP WGM Iridium Subgroup
  • Overview of Iridium Manual Contents
  • Chapter 8 Comparison of AMS(R)S SARPs and
    Expected Iridium Performance
  • Chapter 9 Implementation Guidance
  • A Validation manual has been developed to provide
    information on how the Iridium system complies
    with the AMS(R)S SARPs.
  • Each of the AMS(R)S requirements are addressed
    to show validation method and details of
    validation.

12
ACP WGM Iridium Subgroup
  • Status of Iridium Subgroup Activities
  • Continue refining the Iridium Manual and
    complete final draft
  • Including validation report
  • Work with ACP WGN Subgroup N1 to enable
    inclusion of Iridium as an ATN air-ground
    subnetwork
  • Contribute to finalization of draft AMS(R)S
    SARPs
  • Next meeting will be 24-26 October 2006 (ICAO
    HQ)
  • Schedule
  • The target date for completion of the Iridium
    manual is to coincide with ANC meeting to adopt
    AMS(R)S SARPs (now tentatively May 2007)