Parker%20Hannifin%20NeSSI%20Status-%20ISA,%20September%202001 - PowerPoint PPT Presentation

About This Presentation
Title:

Parker%20Hannifin%20NeSSI%20Status-%20ISA,%20September%202001

Description:

... Parker Integrated Conditioning System (PICS) w/ SP76 compliant elastomeric seal ... 3) 11/8' interface w/ metallic seals (emerging ultra ... PICS System ... – PowerPoint PPT presentation

Number of Views:80
Avg rating:3.0/5.0
Slides: 6
Provided by: robert223
Category:

less

Transcript and Presenter's Notes

Title: Parker%20Hannifin%20NeSSI%20Status-%20ISA,%20September%202001


1
Parker HannifinNeSSI Status- ISA, September 2001
  • Surface Mount System Options
  • 1) Parker Integrated Conditioning System (PICS)
    w/ SP76 compliant elastomeric seal interfaces
    industrial components
  • 2) 1½ SP76 compliant interface w/ metallic seals
    (old ultra-high purity standard)
  • 3) 11/8 interface w/ metallic seals (emerging
    ultra-high purity standard)
  • 4) R-Max stream switching interface
    (proprietary)

Conditioning
Sample
2
Parker HannifinNeSSI Status- ISA, September 2001
  • PICS System
  • Designed w/ 5 flow channels specifically for the
    majority of sample conditioning systems
  • Utilizes 1½ 2¼ SP76 compliant elastomeric
    interface
  • Incorporates larger footprint to utilize existing
    industrial devices SP76 compliant
  • Substrate heating capability available w/ minimal
    development

3
Parker HannifinNeSSI Status- ISA, September 2001
  • 1½ SP76 UHP System
  • Designed for delivery of ultra high purity gasses
    used in semiconductor applications
  • Recommended for detection thresholds in the PPB
    range
  • Utilizes metallic C seals at interfaces
  • Systems normally incorporate welded and faceseal
    type fittings departure from existing petrochem
    technology

4
Parker HannifinNeSSI Status- ISA, September 2001
  • 11/8 UHP System
  • Same features as 1½ system, only smaller
  • Has emerged as de-facto standard based on desires
    of leading semiconductor equipment OEM
  • Heated substrates available
  • In full production, currently supplying (2) 500
    PPB detection threshold systems to chemical
    processing facility

5
Parker HannifinNeSSI Status- ISA, September 2001
  • System Component Availability Comparison
Write a Comment
User Comments (0)
About PowerShow.com