RA-2/MWR Level 2 algorithms verification and products validation group status - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

RA-2/MWR Level 2 algorithms verification and products validation group status

Description:

new documents/TDS delivered by ESA to ALCATEL. F-PAC software upgrade on-going: ... for these activities already developed (MSSL) or under development (CLS) ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 7
Provided by: envisa
Category:

less

Transcript and Presenter's Notes

Title: RA-2/MWR Level 2 algorithms verification and products validation group status


1
RA-2/MWR Level 2 algorithms verification and
products validation group status
  • Level 2 group activities time schedule
  • IPF/F-PAC upgrade time schedule
  • ESLs/PDS interfaces during Commissioning Phase
  • ESLs/IPF readiness status
  • Conclusions

2
Level 2 group activities time schedule
  • L to L 3 months
  • Phase 1 of L1b group activities
  • L1b/L2 data used for L2 algorithms verification
    at ESRIN
  • L 3 to L 4 months
  • Phase 2 of L1b group activities
  • systematic L2 algorithms verification by ESLs
    (coarse tuning)
  • L0, L1b and L2 data disseminated to ESLs and CCVT
  • L 4 to L 6 months
  • systematic L2 algorithms verification by ESLs
    (fine tuning)
  • L0, L1b and L2 data disseminated to ESLs and CCVT

3
IPF/F-PAC upgrades time schedule
4
ESLs/PDS interfaces during CP
5
ESLs/IPF/F-PAC readiness review
  • ESLs ready for EnviSat launch
  • ref. processors code and DPMs/IODDs updated and
    checked by ESA
  • new e-2-e TDS produced to test the new
    algorithms/interfaces in IPF/F-PAC
  • frozen state of ref. Processors
    codes/documentation
  • IPF upgrade on-going
  • new documents/TDS delivered by ESA to ALCATEL
  • F-PAC software upgrade on-going
  • e-2-e TDS available for F-PAC testing
  • discrepancies between IPF and F-PAC identified

6
Conclusions
  • Strategies for L2 algorithms verification already
    specified
  • see RA2/MWR Level 2 algorithms verification and
    products validation plan (PO-PL-ESR-RA-0034 iss.
    1.c) for more details
  • Tools needed for these activities already
    developed (MSSL) or under development (CLS)
Write a Comment
User Comments (0)
About PowerShow.com