Communication Forum - PowerPoint PPT Presentation

1 / 52
About This Presentation
Title:

Communication Forum

Description:

Communication Forum – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 53
Provided by: robinel
Category:

less

Transcript and Presenter's Notes

Title: Communication Forum


1
Communication Forum 29th July 2004 Henry Gun-Why
Estates Management DL
2
Keckkwick Lane Nearly there
  • Apologies Traffic Lights at the top, commenced
    without notices, by courtesy of Core Utilities
  • Apologies Traffic Lights did not work
  • Apologies for the accident
  • Apologies for the anxiety cause
  • Nothing to do with Wates , cables for DL.

3
Keckwick Lane
4
Traffic Arrangements on A558 from 22 July
  • A single way closure is to be implemented on the
    A558 Daresbury Expressway from Thursday 22 July
    for 5 weeks.
  • The closure will apply to the section of the A558
    between the Manor Park (Pitts Heath Lane)
    roundabout and the A56 Chester Road roundabout.
    The closure will prohibit eastbound traffic on
    this section of the expressway (traffic bound for
    Warrington and M56 junction 11).
  • The diversion route is Daresbury Expressway -
    Central Expressway - Rocksavage Expressway - M56,
    from junction 12 to junction 11 - A56 Chester
    Road.
  • Non-motorway traffic will follow the same
    diversion route to Clifton roundabout (M56
    junction 12) and then be directed along the A56
    for Warrington.
  • Traffic bound for Runcorn and Widnes from the A56
    will still be able to travel along A558.
  • The closure is necessary to complete the
    construction of the new roundabout on the A558
    which will provide the link to Keckwick Lane.
  • The closure scheme has been developed in
    discussion between Halton Borough Council,
    Cheshire Traffic Police and Warrington Borough
    Council's Highways department.
  • Plans detailing the route will be available to
    view in the following locations Amenity Area B
    Block Foyer, Coffee Lounge, A Block Foyer (near
    Science Centre), S Block office entrance, Tower
    Foyer and Hostel.
  • Any queries about this notice should be addressed
    to Steve Dobson ext 3365 or Hazel Harkins ext
    3468.
  • Henry Gun-WhyHead of Estates Management

5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
SITE ROAD STRAIGHTENING PEDESTRIAN ACCESS
10
SITE ACCESS TRAFFIC CONTROL
11
Bike Motor-Bike Shelters
12
(No Transcript)
13
Reception Centre Progress
  • Principal Contractor Whites Building Services
  • Start on site Monday 22nd September 2003
  • Demolition w/c 6th October 2003
  • Time Capsules
  • Security Systems transfer being arranged with
    Keith Cope -BITD
  • Completion 30th July 2004, external works to
    continue
  • Project Monitoring to Project Team and Project
    Board

14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
New Boiler A Block Basement
25
(No Transcript)
26
Big Plant Outside A Block
27
(No Transcript)
28
(No Transcript)
29
Cleaning out the pipes - 1
30
Henrys escape tunnel
31
Cleaning out the pipes - 2
32
(No Transcript)
33
Broken Drain Outside SuperStem
34
(No Transcript)
35
(No Transcript)
36
Big Plant Outside A Block
Big Plant Inside A Block
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
Estates Management Activity Update and Issues
Raised
  • Proposed Decentralisation of heating system ,
    commencement May 2004, completion September
    2004.
  • Estates Management Website http//www.estates.dl.
    ac.uk , to be updated in June 2004 .
  • Development of a DL Emergency Plan on going in
    draft June 2004 Bike Sheds to be relocated to
    Main Car park , consultation required

50
Estates Strategy - OST proposed funded projects-
2004-2005
  • Replacement Site Water Main
  • Asbestos removal within Tower Building
  • Tower Ventilation system replacement
  • Replacement of Roofs
  • Replacement of CBlock Elevations
  • New Entrance for B Block from Car Park - DDA
  • Upgrade entrance to A and B Blocks- DDA
  • Upgrade Main corridors A and B Blocks
  • Upgrade Road surfaces, replace security barriers
    and replace wooden kerbs.
  • Electrical Testing of Buildings

51
Estates Management Activity Update and Issues
Raised
  • Decentralisation of Site Heating Gas Supply
    Hobb Lane, A56 Chester Road, down Keckwick Lane
    by July 2004.
  • HSE Fire Precautions Phase 1 - work has commenced
    in the SR and Tower completion September 2004
    Fire Panels replacement
  • Fire System Replacement - Tower, Stores , E
    Block and A Block Summer 2004

52
Other Matters
  • Power dips on Monday 19th July 2004
  • Board of Enquiry into the Tower Incident 16rh
    May 2004 completed
  • Mini Board on Enquiry into recent fire in C
    Block.
  • Site entrance, access control and mods to site
    roads
  • Fitness Centre office improvement
  • Daresbury Campus Building 2
  • Future Forums
  • Invitation to other departments to present -
  • Learning and Development
  • Communications Group
  • SRD Operations
  • Health and Safety
  • Trade Unions
  • Others
Write a Comment
User Comments (0)
About PowerShow.com