Description:

ASIC foundries. ... Database of existing radiation data by commercial foundry (GSFC) Selection guide for COTS foundries (radiation issues BOK) JPL/GSFC ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 2
Provided by: SAICODI9
Category:

less

Transcript and Presenter's Notes

Title: Digital and Mixed Signal ASIC Foundry Radiation Assessments Task 04052


1
Digital and Mixed Signal ASIC Foundry Radiation
AssessmentsTask 04-052
Description
Benefits
The prime benefit is providing NASA reliable
techniques and selection criteria for ASICs.
Albeit, FPGAs are becoming of wider spread use,
there are still a large number of applications
that require ASICs (digital or mixed signal)
for performance and mixed signal issues. By
providing a reference list of available foundry
radiation data by process and updating by test
on a yearly/bi-yearly basis (2 to 4 per year),
higher radiation reliability ASICs will be
inserted into NASA systems.

Application specific integrated circuits (ASICs)
are commonly used in both spacecraft subsystems
as well as science instruments. This
includes digital, analog, and mixed signal
devices. These devices provide a savings in
volume, power, and weight versus discrete designs
and often provide a performance benefit for
science accuracy or bandwidth. This task is in
combination with a non-radiation task
assessing ASIC foundries. The first step is to
determine what radiation evaluation work has been
done on current ASIC foundries both within NASA
and without and to determine adequacy of
radiation qualification procedures (test chips
and/or structures). Once this is done, a
round-robin multi-agency approach to provide
periodic radiation assessments of COTS foundries
will be developed (cost-sharing)..
Deliverables
  • BOK of existing radiation qualification
    procedures (JPL)
  • Database of existing radiation data by commercial
    foundry (GSFC)
  • Selection guide for COTS foundries (radiation
    issues BOK) JPL/GSFC
  • Test reports on foundry performance (updates to
    database) (GSFC - digital, JPL mixed signal)

Schedule/Costs
Risks
Total ROM Cost (non-CS) 165K
Red, Yellow, or Green
CS FTEs 0.4
Non-NASA Organizations/Procurements AFSMC/Aerospa
ce will likely be an in-kind contributor and it
is hoped that we can augment this proposed
funding from other sources.

Lead Center/PI GSFC/Christian Poivey Co-Is
JPL/Jeff Patterson Center Funding Split GSFC-
80K/0.4, JPL - 85K
Tactical 4 , Slide 8