New 1609 Project Proposal: Application Oriented Communications Management Comm Manager - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

New 1609 Project Proposal: Application Oriented Communications Management Comm Manager

Description:

Propose a new 1609 standard for Application Oriented Communications ... Manage multiple WBSS through multiplexing or preemption. Message handling features ... – PowerPoint PPT presentation

Number of Views:125
Avg rating:3.0/5.0
Slides: 11
Provided by: viiPathB
Category:

less

Transcript and Presenter's Notes

Title: New 1609 Project Proposal: Application Oriented Communications Management Comm Manager


1
New 1609 Project Proposal Application Oriented
Communications Management(Comm Manager)
  • April/May 2008

John Moring (760) 633-1790 jmoring_at_technocom-wirel
ess.com
2
Overview
  • Propose a new 1609 standard for Application
    Oriented Communications Management
  • Need
  • Relationship to other standards and activities
  • Features

3
Current Situation
  • 1609 assumes an abstract Application layer
    above 1609.3
  • But does not specify it
  • 1609.1 was intended to provide guidance to
    application developers
  • But has not succeeded
  • Application developers left without a standard
    interface to 1609-compliant hardware-software
  • Some critical system-level features were not
    appropriate to include in existing standards
  • Application priority validation on registration
  • Coordination among multiple simultaneous
    applications
  • Session management in overlapping RSE coverage
    areas
  • Inter-layer primitives are described in 1609 but
    not specified
  • Etc.

4
Advantages of a Comm Manager
  • Allows uniform application development regardless
    of the underlying hardware and software
    configuration
  • Makes developers lives easier radio functions
    abstracted
  • Provides multi-application coordination features
  • E.g., two applications registered for one PSID
  • Provides a place to specify other missing
    functionality
  • E.g., validation of application priority on
    registration
  • Removes some application-related complexity from
    1609.3
  • Network Services spec should be communications
    oriented vs application oriented
  • Simplifies stack and isolates it from
    requirements of future applications

5
Features of a Comm Manager
  • Provides coordinated interface for WAVE functions
  • 1609.3 control plane (WME)
  • 1609.3 data plane (WSMP optionally UDP TCP)
  • 1609.2 security
  • Provides general application-level services,
    e.g.,
  • Inter-application coordination
  • Application notification/registration
  • Remote, local
  • Session persistence across RSEs
  • Message queuing, replay/dispatch, and security
  • Service discovery
  • Link management
  • Geo- and movement-based services
  • Allows a partitioning between third party apps
    and device kernel
  • A place to specify other necessary device
    features not part of a communications stack
  • Comm Manager need not be required for every
    device/application
  • E.g., a single application could run via
    vendor-specific device interface

6
Strawman Comm Manager
Existing SAPs
7
Comm Manager in VII
  • Similar concept implemented, deployed, and tested
    in Proof of Concept
  • Lessons learned reflected in this proposal

8
Potential Features
  • Security features
  • Validate application priority level on
    registration
  • WBSS management features
  • Manage multiple WBSS through multiplexing or
    preemption
  • Message handling features
  • Periodic repeated WSM transmission
  • Location-aware communications
  • Etc.

9
Proposed PAR
  • The scope of this standard is to specify
    communication management services for Wireless
    Access in Vehicular Environments (WAVE).
  • The purpose of this standard is to define
    communication management services in support of
    wireless connectivity among vehicle-based
    devices, and between fixed roadside devices and
    vehicle-based devices for Wireless Access in
    Vehicular Environments.

10
What Next?
  • Working Group agreement
  • PAR request
  • Draft standard by next WG meeting