Expansion of Hout Crude Onshore Production Facility - PowerPoint PPT Presentation

1 / 38
About This Presentation
Title:

Expansion of Hout Crude Onshore Production Facility

Description:

... u q Z ' ''x '{ '} q S'd 't s 'm ''w p t '}t p '' s ' ... t IW_at_ z ' P '  v p d=GNk ' x 6A. s e pp'S } ... – PowerPoint PPT presentation

Number of Views:778
Avg rating:3.0/5.0
Slides: 39
Provided by: khaled8
Category:

less

Transcript and Presenter's Notes

Title: Expansion of Hout Crude Onshore Production Facility


1
Expansion of Hout Crude Onshore Production
Facility
OWNER / CLIENT Khafji Joint Operations (KJO).
CONTRACT TYPE EPC LSTK Consortium
Enppi/Petrojet Enppi Lead SCOPE OF
SERVICES Engineering, Material Supply,
Construction, Commissioning and Start-up and
Overall Management. PROJECT DESCRIPTION Due to
Production capacity increase 50,000 Barrels /
day, Alkhafji Storage Capacity will expand by
installation 5 Storage tanks (150,000 to 500,000)
Barrels, booster pumps, Instrument, Piping, Fire
fighting and a new Electrical substation.
2
Khafji Field Development Phase 1August 06-
January 09
  • OWNER / CLIENT
  • Khafji Joint Operations (KJO).
  • CONTRACT TYPE
  • EPC LSTK Consortium Enppi (Leader) / PMS
    /Petrojet
  • SCOPE OF SERVICES
  • Engineering, Material Supply, onshore Structure
    fabrication, offshore laying / Installation,
    Overall Management, Construction Supervision,
    Commissioning and Start-up and.
  • PROJECT DESCRIPTION
  • Installation of new 6 platforms, modifications
    of 5 existing platforms, subsea new pipeline with
    total length 110 km sizes 28 / 36 / 42 and
    laying of subsea cables with total length of 8km
    diameter 6.
  • Located at the Joint operations area -
    North of Arabia Gulf.

3
5 WELLS
24
24
12
24
2 cables
Offshore
24
Onshore
Khafgi Onshore facility
on shore gas Receiving Facilities
Gas Processing Plant
42 x 42 km
Onshore Inlet Separators
Utility Unit
14 x 2
16
2 cables
New Onshore Flare
36x42 km
12 wells
24
4
Safaniya Water Disposal System UpgradeAugust 06
May 08
  • OWNER / CLIENT
  • Saudi Aramco
  • CONTRACT TYPE
  • EPC LSTK
  • SCOPE OF SERVICES
  • Engineering, Material Supply, Construction,
    Commissioning
  • and Start-up and Overall Management.
  • PROJECT DESCRIPTION
  • The project will expand Safaniya Arabian Heavy
    Crude and Utilities Plants to maintain the
    plant's crude oil demand until 2011.
  • AreaPlant 369 Scope / New Commodities
  • Crude Header , Low Pressure Production Trap
    (LPPT) designed to 600 MBD oil with 40 WC,
    relevant utilities.
  • AreaPlant G26 Scope
  • CPIs designed to handle 400 MBD of formation
    water, IGFs designed to handle 805 MBD of
    formation water, Booster/Injection pumps to
    deliver formation water to injection wells.

5
Safaniya Water Disposal System Upgrade
Safaniya offshore Field is the largest oil field
in the world, producing more than 1.2 million
barrels/day
6
(No Transcript)
7
Yanbu Gas Plant Expansion 2006 / 2008
OWNER / CLIENT SAUDI ARAMCO CONTRACT TYPE EPC
Main Contractor - LSTK SCOPE OF SERVICES Detailed
Engineering, Material Supply Construction -
Enppi / Petrojet Saudi Arabia IK Commissioning
and Start-up Enppi / Petrojet Saudi Arabia
IK. PROJECT DESCRIPTION Expand Yanbu NGL Plant
Capacity from 390 to 585, scope of work includes
195 MBOD Deethanizer with ancillaries and
propane, refrigeration system, Feed to the
existing De-propanizer De-butanizer Columns,
Construct Substation with Process Interface Room,
Expand DCS and ESD systems.
8
KHURSANIYAH GAS PLANT 2005 / 2006
OWNER / CLIENT Saudi Aramco
/ Bechtel UK. CONTRACT TYPE Professional
services - Reimbursable basis SCOPE OF
SERVICES Engineering services assistance PROJECT
DESCRIPTION Khursaniyah Gas Plant includes two
gas-conditioning trains, ethane and natural gas
liquids recovery units process 1000 MMSCFD of
natural gas, produce 550 MMSCFD sales gas,
240,000 BL/D ethane / natural gas liquids, and
1,800 metric tons / day sulfur. The complex will
process natural gas from three onshore fields in
the Eastern Province Abu Hadriya, Fadhili, and
Khursaniyah.
9
PDVSA NGL PLANT 2006
OWNER / CLIENT Petroleos De Venezuela
S.A. CONTRACT TYPE Professional Services
Lumpsum SCOPE OF SERVICES Basic
Engineering PROJECT DESCRIPTION New NGL
Extraction Plant (4th Train) in San Joaquin)
Processing Capacity 1000 MMSCFD of NG Producing
52,500 BPD of C3.
10
HPC-SYRIA ENGINEERING SERVICES 2006 / 2008
OWNER / CLIENT HAYAN PETROLEUM COMPANY HPC
CONTRACT TYPE Lump-sum Professional
services SCOPE OF SERVICES Three Years Service
Contract Basic Engineering, Detailed Engineering
review and Construction Supervision. PROJECT
DESCRIPTION New Gas and Oil production facilities
in Jihar including Gathering and Transportation
pipelines, Satellite Gathering Station, Gas
Treatment Plant 3 MM m3/day , Product Export
system and export P/Ls to Syrian Oil and gas
distribution system, Oil production capacity for
400 m3/day and 250 000 m3/day associated gas,
Liquid phase condensate plant capacity will be
1200 m3/day,LPG production in range of 300 m3/ day
11
Maximization of C2 C3 2005 / 2008
OWNER Egyptian Natural Gas Company
(GASCO) CONTRACT TYPE Lump-sum Professional
Services / Material Supply Disbursable SCOPE OF
SERVICES EPC Main Contractor Basic and Detailed
Engineering, Procurement, Construction
Supervision, Commissioning Start up Assistance,
Overall Project Management PROJECT
DESCRIPTION Maximize C2 C3 recovery in Western
Desert Gas Complex and install a new facility at
Amerya LPG plant to produce C2 C3 mixture
12
QASR / OZORIS NEW OIL FACILITY 2006 / 2008
OWNER KHALDA PETROLUEM COMPANY (KPC) CONTRACT
TYPE Lump-sum CTR Professional Services SCOPE OF
SERVICES Basic and Detailed Engineering,
Procurement Services PROJECT DESCRIPTION New Oil
Production facilities at OZORIS to accommodate
Qasr / Ozoris / Syrah oil well production 20,000
BFPD
13
GUPCO REHABILITATION PROJECT 2005-2010
OWNER GUPCO - bp CONTRACT TYPE Reimbursable
Professional services / Cost Plus Material
Subcontracts. SCOPE OF SERVICES Basic, Detailed
Engineering, Procurement Services, Construction,
Commissioning and Start-up and overall
management. PROJECT DESCRIPTION Rehabilitation
of GUPCO offshore facilities includes , 9
complexes , 69 satellites platforms, and 1600 km
of sub sea pipelines in addition to onshore
facilities Ras Shukhier / Dahshour / Western
Desert including associated pipelines.
14
FIELD DEVELOPMENT OF SAQQARA July-05 / Nov-05
OWNER GUPCO CONTRACT TYPE Reimbursable
Service SCOPE OF SERVICES Detailed Engineering
Enppi/KBR-UK, and technical support during
construction phase PROJECT DESCRIPTION Production
of Saqqara field via an unmanned fixed steel
nine-slot platform through a 16 multiphase P/L
to onshore facilities. Power, signals and
chemicals from onshore facilities to the Saqqara
platform is supplied via an umbilical. Onshore
Facilities reception facilities approximately 1
km South East of the existing Ras-Shukeir Plant
where the gas and liquids will be separated. The
gas will then be sweetening and dehydration units
and utilities.
15
NEEM EXPORT PIPELINEJULY-05 / JUNE-06
  • OWNER
  • Greater Nile Petroleum Operating Company Ltd.
    (GNPOC) - Sudan
  • CONTRACT TYPE
  • LumpSum S/C of Ram/Petrojet Consortium
  • SCOPE OF SERVICES
  • Basic Detailed Engineering
  • PROJECT DESCRIPTION
    16- 100 km crude oil
    pipeline Neem to Diffra 100,000 B/D

Neem
Diffra
16
SHARARA MELLITAH PIPELINE - LIBYA
2004 - 2005
OWNER AGIP OIL COMPANY Ltd. CONTRACT TYPE Lump
Sum S/C from Petrojet. SCOPE OF
SERVICES Basic
Engineering Detailed Engineering PROJECT
DESCRIPTION 30" Crude Oil Pipeline from Sharara
area to Melittah - 750 KM The new pipeline will
be three sections including Metering skids, Scada
System.
17
SHARARA MELLITAH PIPELINE - LIBYA
2004 - 2005
18
DEVELOPMENT OF THE JORDANIAN GAS TRANSMISSION
PIPELINE 2003 - 2005
OWNER Jordanian EGYPTIAN FAJR FOR NATURAL GAS
TRANSMISSION AND SUPPLY COMPANY CONTRACT
TYPE EPCM - Consortium (Enppi, Petrojet
Gasco) SCOPE OF SERVICES Engineering
Procurement Services / Material Supply,
Construction Supervision, Commissioning Start
Up Assistance Consortium Leadership PROJECT
DESCRIPTION A 36 , 394 KM Pipeline. From AQABA,
South Of Jordan To Samra And Rehab Power Stations
North Of Jordan 10 BCM/Y Gas.
19
DEVELOPMENT OF THE JORDANIAN GAS TRANSMISSION
PIPELINE 2003 - 2005
20
UGDC, NGL PROJECT AT PORT SAID 2001-2004
Port-Said Process area Damietta export
facilities areas North East Delta.
Propane Export P/L 10 52 KM
Propane Export Area
Process Area
21
UGDC, NGL PROJECT AT PORT SAID 2001-2004
(COMPLETED)
OWNER United Gas Derivatives (UGDC) bp Agip -
GASCO CONTRACT TYPE Lump sum turnkey
responsibilities Professional Services Lump-sum
price Material Supply - Disbursable
  • PROJECT DESCRIPTION
  • NGL Process Facility Which
  • Has The Capacity To Process
  • 1100 MMSCFD Of Natural Gas
  • From Elgamil And Hapy Fields.
  • Propane Export Facilities At
  • Dameitta Port

SCOPE OF SERVICES FEED review, Detailed
Engineering, Procurement, Construction
Supervision, Commissioning Start Up Assistance,
Overall Project Management
Gas To Grid
2000T/D Propane
1500T/D LPG
350T/D Condensate
22
UGDC, NGL PROJECT AT PORT SAID 2001-2004
(COMPLETED)
23
NGL - Damietta Storage Export Facilities
2001 2004 (Completed)
24
Simian / Sienna - Sapphire Gas Development
Project 2003 - 2005
OWNER Burullus Gas Company. CONTRACT
TYPE (Consortium Enppi/Petrojet) Lumpsum
Turnkey
25
Simian / Sienna - Sapphire Gas Development
Project 2003 - 2005
26
Simian / Sienna - Sapphire Gas Development
Project ( Continued )
SCOPE OF SERVICES Lump-sum turnkey scope
engineering services, procurement services ,
overall project management / consortium
leadership, material supply , construction
supervision, commissioning start-up. PROJECT
DESCRIPTION Extension to existing Scarab /
Saffron onshore facilities and increase total gas
production to 2100 MMSCFD by utilizing 2665
MMSCFD of natural gas produced from Simian /
Sienna and sapphire wells to feed the Egyptian
Gas Liquefaction Plant (ELNG)
27
Baltim-NW2 Platform 2005
OWNER Belayim Petroleum Company
(PETROBEL) CONTRACT TYPE Lump Sum SCOPE OF
SERVICE Basic Engineering, Detailed
Engineering Procurement Services PROJECT
DESCRIPTION 12-slots RULE platform, Capacity 10
MMSCMD Gas. Gas, water Condensate are
Directed to onshore through 24, 10 and 4 and
sub-sea PLEM 2 Km distance.
28
Temsah - 4 Platform 2003-2004
OWNER Belayim Petroleum Company (PETROBEL)
CONTRACT TYPE Lump Sum SCOPE OF SERVICE
Basic / Detailed Engineering Procurement
Services PROJECT DESCRIPTION 4 legs,12-Slot
unmanned Fixed Offshore, 24" Gas Pipeline 5.5 Km,
10"Condensate P/L 5.5 KM, 4 Produced water 5.5
KM and 3 Instrument gas 5.5 KM- Offshore.
Production Platform in 85m Water Depth,
Capacity 10 MMSCMD Gas Plus 3000 BBLD Condensate.
29
Temsah - 4 Platform 2003-2004
30
Barboni Platform 2003-2004
OWNER Belayim Petroleum Company (PETROBEL)
CONTRACT TYPE Lump Sum SCOPE OF SERVICE
Basic Engineering, Detailed Engineering
Procurement Services PROJECT DESCRIPTION 4
Legged unmanned Steel Jacket Platform Located
Rosetta 49 m Water Depth,
Capacity of 275 MM SCFD. Weight 450 tons. Through
a 26" Sub Sea Pipeline 17 km to The Onshore
Terminal for Final Processing.
31
Barboni Platform 2003-2004
32
Baltim-N Platform 2003-2005
OWNER Belayim Petroleum Company
(PETROBEL) CONTRACT TYPE Lump Sum SCOPE OF
SERVICE Basic Engineering, Detailed
Engineering Procurement Services PROJECT
DESCRIPTION 4 legs 9-slots Tubular Steel Frame
Jacket. Fixed Offshore Production Platform,
Capacity 4.7 MMSCMD Gas. Gas Condensate is
Directed to Baltim East Existing Platform through
a 18" Gas Pipeline 20 Km and 4 Produced Water 20
KM.
33
EGYPTIAN LINEAR ALKYL BENZENE PROJECT
2003 2005 Phase I / 2005 2008 Phase II
OWNER ECHEM / ELAB CONTRACT TYPE Lump-Sum SCOPE
OF SERVICES (PHASE I) Professional Services -
License selection, Basic Engineering Based on
UOP License (PHASE II) Professional Services -
Detailed Engineering through Consortium GS EC
Leader / Enppi / Petrojet
34
EGYPTIAN LINEAR ALKYL BENZENE PROJECT
2003 2005 Phase I / 2005 2008 Phase II
PROJECT DESCRIPTION The Plant capacity is 100,000
T/Y of LAB - (UOP) license. The main feeds for
the complex are Kerosene/jet A-1 fuel from
Alexandria Petroleum Company (APC) and reformat
and Hydrogen from Alexandria National Refining
Petrochemicals Company (ANRPC) The Project
facilities comprises the following units
packages - Process Units - Utilities -
Storage Facilities - Service Buildings
35
UHDE GRANULATION PLANT 2003 - 2005
OWNER Krupp, UHDE GmbH CONTRACT TYPE Lump
Sum SCOPE OF SERVICE Detailed Engineering
Procurement Services PROJECT DESCRIPTION The
Project aims to fulfill the granulation process
Requirements of both Suez Fertilizer Company
Alexandria Fertilizer Company. Granulation
process aims to produce 1,200 T/D Ammonia and
1,925 T/D Urea including utilities and
off-sitefacilities.
36
UHDE GRANULATION PLANT 2003 - 2005
37
ETHYLENE AND POLYETHYLENE PLANTS -
SIDPEC UTILITIES AND OFFSITE COMPLEX PROJECT
1997 - 2000
38
ETHYLENE AND POLYETHYLENE PLANTS -
SIDPEC UTILITIES AND OFFSITE COMPLEX PROJECT
1997 - 2000
OWNER Sidi Kerir Petrochemical Company
(SIDPEC) CONTRACT TYPE Lump Sum Turnkey SCOPE OF
SERVICES Turnkey Main Contractor
PROJECT DESCRIPTION The Utilities And Offsite
Plant Provides SIDPECs Two New Plants (Ethylene
And Polyethylene) With Fire Fighting Cooling
Water, Compressed Air And de-mineralized Water.
Moreover, The Complex Provides Process Water
Treatment.