Title: Columbia River Basin Water Management Program Mill Creek Water Storage Feasibility Study Lake Roosev
1Columbia River Basin Water Management Program
Mill Creek Water Storage Feasibility Study
Lake Roosevelt Forum April 13, 2009
2WRIA 59 Colville River WatershedMill Creek Water
Storage
- Project Applicant/Sponsor
- Partially Prepared by
Stevens Public Utility District PO Box 592 Loon
Lake, Washington, 99148-0592 General
Manager/Engineer Dick Price, PE
HDR Engineering, Inc. 1001 SW 5th Avenue, Suite
1800 Portland, OR 97204-1134 Project Manager
Ron Mason, PE
With assistance from
Stevens County Watershed Planning
Office Courthouse Annex, 215 S. Oak St. Colville,
WA 99114 Project Manager Linda Kiefer
3Mill Creek Water Storage Project Site
Mill Creek
Within the WRIA 59 Colville River Watershed
4Drainage Area Map
Mill Creek Storage Site Watershed
5Normal Annual Precipitation
Mill Creek Storage Basin-wide Mean Precipitation
36.2
6Mill Creek Storage Site
- Potential Project Purposes
- Benefit for instream flows Low flow
augmentation - Reduction of flooding
- Benefit to current water users / water rights
- Provide additional water to meet future water use
needs - Micro-Hydropower opportunities
7Mill Creek Hydrology
- Stream Gages
- USGS Stream Gage 12408500 41 years of record
- Used for project analysis
- Gage discontinued in 1986
- WRIA 59 Stream Gage Project 2007 New Mill
Creek Gage Installed - Site Information
- Drainage area 41 square miles
- Estimated Annual runoff (A-F/mile) 425
- Estimated Annual runoff (acre feet) 17,442
8Mill Creek Storage SiteElevation vs. Storage
Curve
9Mill Creek Storage Project
Mill Creek Inundation
10Mill Creek Storage Site
Major Study Elements
- Biological and environmental coordination
throughout the scoping process - Site survey
- Develop project hydrology
- Determine site location for spillway
- Preliminary hydraulics to determine size type
of spillway - Type size of regulating outlet
- Geotechnical investigations
11Mill Creek Storage Site
Major Study Elements, contd
- Test pits soil samples
- Lab testing of soil samples
- Determine possible types of embankment
- Construction quantities
- Project alternatives analysis
- Project drawings, (CADD)
- Construction cost estimates
- Project recommendation
- Feasibility report
- Quality control review
12Mill Creek Storage Site
- Current Project support
- Conducted one scoping meeting with Department of
Ecology Department of Fish and Wildlife on
November 13, 2007 - Stevens County Commissioners Stevens Public
Utility District - Local Support of Colville River (WRIA 59)
Watershed Water Resource Management Board - P.U.D. has option to purchase 40 acres where the
structure would be located.
13Questions??
- Contacts
- Richard (Dick) Price, General Manager, Stevens
PUD _at_ (509) 233-8700 - Ron Mason, Project Manager, HDR Engineering, Inc.
_at_ (503) 423-3802 - Linda Kiefer, WRIA 59 Watershed Project Manager
Stevens County _at_ (509) 685-2832