Being done at KEK/Japanese industry, but v. important. gek 16/6/04. 5. Summary (cont) ... ONLY 2 TUBES BUILT OPERATING AT 120 Hz. ANOTHER TUBE BEING TESTED. ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 23
Provided by: george200
Category:

less

Transcript and Presenter's Notes

Title: ITRP Comments on Question 19GEK 90604


1
ITRPComments on Question 19 GEK 9/06/04
  • 19) For the X-band (warm) technology, detail the
    status of the tests of the full rf delivery
    system. What vulnerabilities still exist, and how
    much RD is required to reach a full technical
    design?
  • Note
  • This was interpreted in the responses by GLC/NLC
    as only referring to the SLEDII pulse compression
    system.
  • I will interpret it more broadly

2
Summary
  • R1
  • Validation of performance of low group velocity
    structures with acceptable performance.
  • Achieved, but testing with a significant number
    of structures
  • only just started. Trip rates and damage needs
    more thorough investigation.
  • Demonstrate full power and energy handling
    capabilities of the dual-moded SLED-II pulse
    compression system.
  • Achieved.
  • R2
  • Full test of a PPM klystron at 120 or 150 Hz
  • Achieved, but only with 1 klystron so far,
    others in pipeline.

3
Summary, (cont.)
  • R2 (cont)
  • Klystrons to be tested with NLC modulator (at
    full specs and include arcing tests).. The
    tests should be made with beam.
  • Partially achieved???
  • Tests done with 8 accelerator structures (1
    girder), but some of these structures used the
    8- stack modulator and it is not clear if they
    were powered by the only full spec. klystron.
  • Static tuning studies, including dynamic
    effects during correction, must be completed.
  • In progress, but much has been done.
  • A detailed prototype of the main linac module
    (girder) must be developed to provide info.
    about on girder vibration.
  • ????????

4
Summary (cont.)
  • R2 (cont.)
  • The performance of beam based tuning procedure
    to align magnets and structures must be
    demonstrated by complete simulations, in the
    presence of a wide variety of errors, in both
    the beam and in the components.
  • Much has been done, but I believe much more
    needs doing.
  • R3
  • The low level rf system needs further
    improvements .
  • This is a complex and critical system.
  • ??????
  • Long term testing of rf modules is required
    before mass production.
  • Yes!!!
  • Continuation of RD to develop the NLC PPM
    klystron
  • Being done at KEK/Japanese industry, but v.
    important.

5
Summary (cont)
  • R3 (cont)
  • Development of the JLC-X linear induction
    modulator should continue to improve the
    overall performance and reliability.
  • I think this is happening at KEK.
  • The test recommended in R2 with a girder should
    be extended to a full test, with beam, of a
    complete linac unit, with 24 structures and 8
    klystrons.
  • I believe this is highly desirable as it would
    start to test linac rather than the components.
    However it is not likely to occur for some time,
    due at least in part to the availability of 8 PPM
    klystrons!
  • The magnetic centre stability (at the
    1-10micron level) required in the quads must be
    demonstrated, over the relevant time scales of
    minutes to days.
  • Yes! Not sure if this is being actively worked
    on we have heard almost nothing about the quads
    in the system

6
Summary (cont)
  • R3 (cont)
  • For the linac, the tuning procedures require
    structure alignment as well as quadrupole
    centering. There is a need to evaluate the
    systems aspects of a large interrelated
    alignment system.
  • I believe that this is a crucial point in
    achieving the integrated luminosity goals of the
    machine. The complexity, size and tolerances of
    the whole machine is hugely challenging compared
    to anything yet achieved.

7
Conclusions(Vulnerabilities and RD needed for
a full technical design)
  • Klystrons
  • Need to obtain several full spec. PPM klystrons
    from more than one manufacturer and lifetime test
    them under operating conditions.
  • Further work on design of klystron to improve
    lifetime would be highly desirable both to reduce
    the labour of frequent replacement and
    replacement cost.
  • Modulator
  • 2-pack modulator design still needs finalising
    and testing with two PPM klystrons.
  • Pulse compression
  • SLED II has been demonstrated to meet spec. It
    requires engineering to improve manufacturability
    and therefore reduce price.
  • DLDS (Delay Line Distribution System) development
    should, if possible be pursued, it should be more
    power efficient, cheaper??

8
Conclusions (cont)
  • Accelerator Structures
  • Industrialisation of full construction, not just
    components should be pursued.
  • Larger assemblies of structures (at least 24)
    should be tested under full operating conditions
    in order to learn more about breakdown and damage
    as well as stability.
  • Enough structures incorporating the quads and BPM
    and moving mechanisms should be assembled so that
    the stability can be verified. This will require
    powering and cooling.
  • Further optimisation of the basic design to
    achieve even higher gradients would clearly be
    beneficial.
  • System integration
  • This is a major concern for the warm machine. So
    far the largest unit is an 8-structure beam. Even
    this was not quite of final design. Really need a
    much larger prototype.

9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
  • Will not discuss the 8-pack Project, but assume
    that the modulator of choice is the
  • Next Generation Induction Modulator the Two
    Pack.
  • This is a Solid State Induction Modulator using
    Insulated Gate Bipolar Transistors

13
(No Transcript)
14
  • The present 2-pack modulator undergoing tests is
    not the
  • final version and has a lower efficiency than
    design.

15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
  • YES
  • HYBRID UNDER TESTlt NO FINAL DESIGN
  • ONLY 2 TUBES BUILT OPERATING AT 120 Hz. ANOTHER
    TUBE BEING TESTED.
  • EXPENSIVE AND INEFFICIENT, BUT MEETS SPECS.

22
  • NEED TO UNDERSTAND BETTER CAUSE AND EFFECT OF
    BREAKDOWNS
  • INDUSTRY NOT YET MADE ANY FULL STRUCTURES?
  • STILL VERY SMALL SCALE, 5m OUT OF 10000m!
Write a Comment
User Comments (0)
About PowerShow.com