2BASIC NEGATIVE TENDENCIES OF ENVIRONMENT AND
CLIMATE CHANGES
- - Less and less forestry areas
- - More and more wastes as waste waters, solid
wastes and air pollutants - - Shortage of raw materials with quality and the
need to use lower and lower quality of natural
raw materials - - Higher and higher Global energy consumption
- - Higher and higher Global consumption of goods,
because of higher population and higher standards
- Conference on Environment and Climate Change,
19.11.2008, Sofia
3POLICY AND ACTIONS MEASURES TAKEN ON THE WAY TO
KEEP THE BALANCE AND BETTER ENVIRONMENTAL
CONDITIONS ON GLOBAL AND REGIONAL LEVEL
- Global conventions approved and their
implementation - Introduction of stronger and stronger limits for
pollutants generated and released from different
sources - Restrictions for use of certain products
- Development and larger use of BAT with lower
consumption of Energy and Raw materials - Development of specific programmers and their
implementation /unleaded gasoline plantation of
trees, etc./ - Stronger measures against polluters and
introducing the principle to pay for damages
done - Increasing the areas of protected zones.
- Conference on Environment and Climate Change,
19.11.2008, Sofia
4NEXT PRIORITY AREAS FOR POLICY AND ACTIONS
MEASURES NEEDED
- ON THE WAY TO LIMIT THE NEGATIVE TENDENCIES
MENTIONED ABOVE - - TO HELP NATURE TO KEEP THE BETTER BALANCE OF
FORESTRY AREAS, INTRODUCING NEW LEGAL
REQUIREMENTS AND EXTENDING SUPPORTING MEASURES
ABOUT DEVELOPING A ACTION PROGRAMMES ABOUT - - ACCELARATING THE INOVATION PROCESSES AND
INTRUDUCTION OF BAT IN LARGER SCALE WITH
PRIORITIES, RELATED TO THE SAVING OF ENERGY
LOWER CONSUMPTION OF FRESH WATER AND RAW
MATERIALS - - MINIMIZATION OF GENERATED EMISSIONS AND
SUPPORTING LEGAL MEASURES FOR IMPROVING RECYCLING
AND USE OF WASTES AS A SECONDARY ENERGY AND RAW
MATERIALS RESOURS - - INTRODUCTION OF RESTRICTIONS ON THE BASE
BENCHMARKING AND THE BEST ACHIEVMENTS IN THE
DIFFERENT AREAS OF ACTIVITIES /BRANCES OF
INDUSTRY/
- Conference on Environment and Climate Change,
19.11.2008, Sofia
5Specific programmes and measures needed
- Minimization of biodegradable wastes land filing,
developing programmes and supporting measures for
utilization as a energy resource or balance of
nutrients in the agriculture updating of the EU
directive is a positive fact, but such a measures
should be applied to the hydrocarbon industrial
wastes - New efforts for utilization of the gas hydrates
as new raw energy resource - Partial or complete replacement of coal fuel with
RDF or biomass from wastes or specially
cultivated trees - Supporting measures for energy and raw materials
saving - Supporting business initiatives like Responsible
Care and Stewardship Products for minimization of
emissions and safety during all life cycle of the
materials and products -
6EC measures for the period 2007-2013 unacceptable
and impossible for Bulgaria
- - The change of basic year from 1988 approved by
the Global Un convention to 2007 means that the
industrial production is fixed at a much lower
industrial production (about 60) - - On the base of the contract with EU Bulgaria
was forced to shut down Nuclear units wit a power
about 1600 MWT (25 from the total electricity
production power) - - During the same period of time on the base of
the IPPC requirements and permits given, Thermal
Power Stations (TPS) must invest for cleaning
systems and other facilities and upgrading
technologies - - There is no free market of electricity and the
TPS are not free to increase the prices of
electricity - - If the TPS have to pay for additional CO2
emissions they will be forced to close
production and it will be not only a barrier for
growth and sustainable development, but a
catastrophe for population and industry Such a
scenario must be avoided especially in view with
other troubles, related to the financial crisis
ahead
- Conference on Environment and Climate Change,
19.11.2008, Sofia
7Visible measures to be taken on the way to avoid
difficulties
- - Bulgaria and other countries heavy affected by
the plan for 2007-2013 to excluded from the
obligations to implement this plan - Measures for this period of time to oriented to
the upgrading technologies and investments
related to the cleaning systems, related to the
implementation of the IPPC requirements already
fixed in the permits about - Benchmarking system to be developed and
introduced for industrial sub-sectors affected - Trading system to be more flexible and to give
chances to the companies to integrate their
efforts on the way to achieve progress in this
field - Much more financial resources to be available for
grants on the way to stimulate implementation of
new technologies - Much more financial resources to be available for
improving education and stimulation technical
studies of the students at technical universities
LLL programme
- Conference on Environment and Climate Change,
19.11.2008, Sofia
8About realistic emission limits in EU
- - All the limits introduced to be on the base of
BAT in the sub-sectors and WHO unification
needed in view to competition from the other part
of the global markets and avoid transfer of
productions site from Europe to the countries
outside EU - - Recommended limits for green gasses emissions
to be developed and proposed as a benchmarking
indicators for each sub-sector of the industry on
the base of BAT
- Conference on Environment and Climate Change,
19.11.2008, Sofia
9Some time limits for the legal permits, related
to the investment projects
- 1.Review is needed for the permit procedures
before decisions taken , related to the
investment projects the period of prevention
measures like EIA, IPPC procedure etc. should not
exceed 12 months other wise the implementation
process is slower then the innovation process
going on Special attention should be given for
the management of protected areas management
plans have to be approved before the final
decision for protection according existing
legislation conflicts are coming at the moment
when investment proposals are on the table - 2. Reporting unification and minimization also
needed at the moment many reports are required
on the base national, EU and UN legal acts and
agreements.
- Conference on Environment and Climate Change,
19.11.2008, Sofia
10Sustainable development on the base of
partnership and dialog development
- Partnership and efficient dialog should be the
basic precondition for successful sustainable
development - Such a task is very difficult and progress may be
achieved on the base of clear and equal
responsibility from the parties involved up to
now the legal responsibilities are mostly for
business involved and much less for Authorities
and other partners - According to the science such a state is unstable
and if the policy efforts are not sufficient the
system will collapse soon or later - Today conference and consultations is a
contribution for the dialog needed and I hope the
final results will be positive.
- Conference on Environment and Climate Change,
19.11.2008, Sofia
11TANK YOU FOR YOUR ATTENTION
- Conference on Environment and Climate Change,
19.11.2008, Sofia