Title: Mars Reconnaissance Orbiter MOSGDS CDR 8.7 ONC Peer Review
1Mars Reconnaissance Orbiter MOS/GDS CDR8.7 -
ONC Peer Review
- Steve Synnott
- February 24/25, 2004
2Agenda
- Peer Review Summary
- RFAs and Status
- Uplink Process Summary
- Downlink Data Flow and engineering demo
processing - Operations system and software
- Phase C/D Budget and Schedule
- Phase E Budget and Schedule
- Open Items
3Peer Review Report
- Synnott really knows what hes doing
- Synnott has to get tougher
- Responsibility not clear for ONC ATLO activities
(tests and criteria) - Need final OIAs for LMA (U/L) and MIPL (D/L)
interfaces - Need contingency plan(s)
- Need incompressible test list
- Opnav data outage (-13 to -8 d) longer than
necessary? - Need criteria for GO/NO-GO for ONC Sequence 2
(-8 to -2d) - Plan is sketchy
4RFA Response Summary
ONC Peer Review
5Optical Navigation On MRO
Uplink and Downlink Process Overview
Constraints
Picture sequence Request file T1,
ra,dec,exp . tn, ra,dec,exp
MRO/LMA Ground Sequence process
SOE
OTB
IND s/w Pic Plan
Phobos Stars Traj
Opnav check
telemetry
Ground System computer
S/C SSR D/L
Seq commands To ACS, camera
pictures
S/C
Camera
Opnav computer IND s/w
Pictures
Predicts
Archive
Partials, Residuals
Analysis Display
Trajectory Estimation
Dynamics
Registration
Image Proc.
S/C
6Optical Navigation Operations and Analysis
Software
Object location predicts (TGP)
Exists Image registration (Rover)
Prototypes exist Star Centroiding
(OBSERV) Prototype
exists Phobos/Deimos/Mars (OBSERV)
Prototype exists centroiding Calculation of
predicts-observed (OOPG) Exists Calculation of
partials wrt trajectory Exists and
ephemeris parameters (OOPG) Trajectory/ephemeris
estimation (ODAP) Exists Orbit Determination
Program (ODP) Exists Accuracy analysis
and simulation tools Prototypes exist
7Phase C/D budget and Schedule
- Budget FY04
- 0K from MTP and MRO
- 50K from IND
- Budget FY05
- 200K from MTP
- 40K from IND?
- Schedule
- Uplink S/W and example request files ---
Sept 2004 - D/L S/W
--- June 2005
8Phase E budget and Organization
- Budget FY06
- 400K
- Organization
- PI plus parts of 2 OpNav analysts
9Open Items
- Re-iterate the importance of -8 to -2 d ONC
imaging data. These images are necessary to meet
the ONC Level 2 Experiment requirement of 612
images, which the PI believes is the minimum
number required to fully conduct the experiment.
(O4)
10Backup Charts
11OIA and SIS listing
- OIA describing picture request file to LMA
- OIA/SIS describing picture files from MIPL to ONC
- OIA to provide periodic ONC status reports
- OIA for data allocation file from FET
12Procedure Listing
13Team Tool and Software Module listing
- Listed in main presentation
14Training and Certification Plan
- Opnav engineers training on Cassini today
- D/L process very similar
- ATLO data flow and cruise calibration data flow
will be the checks for MRO - Uplink communications with LMA
- Test picture request file interface, non-real
time - Verify quaternions
- Verify opnav events, times exposure, pointing in
SOE - To be done on a schedule acceptable to LMA